Client: C&S Engineer: Contractor: Project: SUMMARY OF BITUMEN SPRAYING RATE TEST RESULTS For the period …..../…..../….… to ……../……../…….. Test No. Date Chainage Width (m) From To Remarks : ………….……..………………………………….……………………………………………………………………… ……..……………………...………………………………………………………………………………………………………………. FORM NO. QR/SBSR Item No. Total Length (m) Total area (m 2 ) Bitumen Sprayed (Itr.)
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Type (Capacity / Model / Make) UnitWorking Conditions Working
Hours ( See # 1 below) Location
#1 : Please insert "OK" for in use "b/d" for breakdown "s/b" for standby
Rain Gauge Reading
Works Stop Due To Rain
APPENDIX "A"Page ¼
III. ACTIVITIES / ITEMS INSPECTED
Work / Items Location Comments
A) LONG MENAPA
MANPOWER :
B) LONG LUAR
MANPOWER :
C) LONG TANGAU
PROJECT : FOR RESIDENT ENGINEER'S
STAFF USE ONLY
Name : …………………………………
Position : ……………………………
Date : ………………………………
TIMECHECKS COMMENTS
1 2 3 4 5 6 7 8 9(Deficiencies, Degree of
Completion, Weather, Other)
Check List Check Marks Checked By (Contractor) :All as required /
1. Setting Out 6. Materials2. Prior Work 7. Testing Deficient X Inspected By (Clerk of Works) :3. Dimensions 8. Compaction4. Equipment 9. Workmanship Not applicable -5. Labour Approved By (RE / QAE) :
Not checked O
FORM NO. QR/IR
INSPECTION REPORT
WORK / OPERATION INSPECTED
Client: C&S Engineer: Contractor: Project:
SITE PREPARATION, SITE CLEARING AND EARTHWORK INSPECTION FORM
Location/Area:
Date of 1st Inspection: Time of 1st Inspection:
Date of 2nd Inspection: Time of 2nd Inspection:
CHECK LIST
Description of Works1st Inspection 2nd Inspection
R E M A R K SOK Not OK OK Not OK
Approval Chit Ref. No.
1 SITE PREPARATION
(a) Setting Out
2 SITE CLEARING
(a) Clearing of Trees and Shrubs
(b) Grubbing
(c) Removal of Stumps/Roots
(d) Disposal of Cleared Vegetation
(e) Temporary Drainage
3 EARTH WORK
(a) Filling Material Used
(b) Level
General Comments: (Note: To attach additional documents for further clarification, if necessary)
Prepared By: Check By: Approved By:
Contractor JPW (Clerk of Work) JPW (RE/ARE)
Name: Name: Name:
Signature: Signature: Signature:
Date: Date: Date:
Item No.
FORM NO. QM/SPSCEW
Client: C&S Engineer: Contractor: Project:
PILING SETTING OUT INSPECTION FORMLocation / Block / Area:
Date of 1st Inspection: Time of 1st Inspection:
Date of 2nd Inspection: Time of 2nd Inspection:
CHECK LIST
Item Description of Works1st Inspection 2nd Inspection
R E M A R K SOK Not OK OK Not OK
Approval Chit Ref. No. :
1 Pile Location :
1a Setting Out/Alignment
1b Position of Peg
2 Pile Location :
2a Setting Out/Alignment
2b Position of Peg
3 Pile Location :
3a Setting Out/Alignment
3b Position of Peg
4 Pile Location :
4a Setting Out/Alignment
4b Position of Peg
5 Pile Location :
5a Setting Out/Alignment
5b Position of Peg
6 Pile Location :
6a Setting Out/Alignment
6b Position of Peg
General Comments: (Note: To attach additional documents for further clarification, if necessary)
Prepared By: Check By: Approved By:
Contractor JPW (Clerk of Work) JPW (RE/ARE)
Name: Name: Name:
Signature: Signature: Signature:
Date: Date: Date:
FORM NO. QM/PSO
PILING SETTING OUT INSPECTION FORM
CHECK LIST
R E M A R K S
Client: C&S Engineer: Contractor: Project:
PILING RECORD SHEET
Location (Building) : Pile Point No. :
Pile Cap Location (Grid Line) : Pile Type & Size :
LENGTH SUPPLY
1st Length m Date Driven Ground Level
2nd Length m Type of Hammer Penetration to Ground Level
3rd Length m Weight of Hammer Existing Ground Level
4th Length m Height of Hammer Temp Compression
5th Length m Cut Off Level
REMARKS
0.5 17.5 34.5 CUT OFF LENGTH
1.0 18.0 35.0
1.5 18.5 35.5 1st Length: m
2.0 19.0 36.0
2.5 19.5 36.5 2nd Length: m
3.0 20.0 37.0
3.5 20.5 37.5 3rd Length: m
4.0 21.0 38.0
4.5 21.5 38.5 4th Length: m
5.0 22.0 39.0
5.5 22.5 39.5 5th Length: m
6.0 23.0 40.0
6.5 23.5 40.5
7.0 24.0 41.0
7.5 24.5 41.5
8.0 25.0 42.0
8.5 25.5 42.5
9.0 26.0 43.0 ***Neglect below if not relevant.
9.5 26.5 43.5 FINAL SETS:
10.0 27.0 44.0
10.5 27.5 44.5 1st 10 Blows___________mm
11.0 28.0 45.0
11.5 28.5 45.5 2nd 10 Blows___________mm
12.0 29.0 46.0
12.5 29.5 46.5 3rd 10 Blows___________mm
13.0 30.0 47.0
13.5 30.5 47.5
14.0 31.0 48.0
14.5 31.5 48.5
15.0 32.0 49.0
15.5 32.5 49.5
16.0 33.0 50.0
16.5 33.5 50.5
17.0 34.0 51.0
Prepared By: Check By: Approved By:
Contractor JPW (Clerk of Work) JPW (RE/ARE)
Name: Name: Name:
Signature: Signature: Signature:
Date: Date: Date:
Penetration (m)
No. of Blows
Hammer Drop
Penetration (m)
No. of Blows
Hammer Drop
Penetration (m)
No. of Blows
Hammer Drop
FORM NO. QM/PRS
Client: C&S Engineer: Contractor: Project:
REINFORCED CONCRETE INSPECTION FORM
Location/Building : Structure Type (ST):
Location (Grid Line) : Floor/Level :
CHECK LIST
Description of Works
Comment / Remarks :
Date: Date:
Time: Time:
ST: ST:
OK Not OK OK Not OK
Approval Chit Ref. No. :
1 Setting Out / Position
(a) Alignment
(b) Lines & Levels
2 Formwork
(a) Dimension level, verticality
(b) Adequately supported or propped
(c) Joints tightness
(d) Surface of forms acceptable
(e) All sawdust & rubbish removed
3 Blinding
(a) Dry and clean
(b) Correct level and thickness
4 Reinforcement
(a) Correct grade, size, number
(b) Correct lap/anchorage length
(c) Adequate chairs, spacers, etc
(d) Cover as required
(e) No mud, oil, loose rust, etc
(f) Damp proof course
5 M & E Opening & Pipe Sleeves
(a) Electrical conduits
(b) Soil & waste pipe
(c) Cold/hot water plumbing
(d) RWDP
6 Curing
(a) PVC cover, gunny sack & watering
7 Bond Tie
8 Construction Joint
9 Concrete Floor Surface Roughering (Broom Brush)
10 Just prior to concreting
(a) Access to pour (incl. labour & materials) and safety
(b) Availability of concrete
(c) Availability of labour
(d) Availability of plant & equipment
(e) Standby equipment for contigencies (including rain)
General Comments: (Note: To attach additional documents for further clarification, if necessary)