TAHAP I PERMOHONAN BANTUAN DANA UNTUK KEGIATAN PRASARANA INFRASTRUKTUR KSM PUYUH KELURAHAN LEBAK GEDE KECAMATAN COBLONG KOTA BANDUNG PADA PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT (PNPM) KOTA BANDUNG TAHUN ANGGARAN 2013 DAFTAR USULAN KEBUTUHAN PRASARANA No Nama Pekerjaan Lokasi Volume Perkiraan PNPM 1 RT 01 RW 14 60 Rp 6,055,000 JUMLAH Rp SALAKOT PIPA PVC ф 12 PROPOSAL REPUBLIC OF INDONESIA MINISTRY OF PUBLIC WORKS
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
TAHAP I
PERMOHONAN BANTUAN DANA UNTUK KEGIATAN PRASARANAINFRASTRUKTUR
KSM PUYUHKELURAHAN LEBAK GEDE
KECAMATAN COBLONGKOTA BANDUNG
PADAPROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT
(PNPM)KOTA BANDUNG
TAHUN ANGGARAN 2013
DAFTAR USULAN KEBUTUHAN PRASARANA
No Nama Pekerjaan Lokasi Volume Perkiraan BiayaPNPM Swadaya
1 RT 01 RW 14 60 Rp 6,055,000 1,015,000 JUMLAH Rp 7,070,000 SALAKOT PIPA PVC ф 12 "
PROPOSAL
REPUBLIC OF INDONESIAMINISTRY OF PUBLIC WORKS
Form Pendaftaran Calon PekerjaPENDAFTARAN CALON PEKERJA
PEMBANGUNAN PRASARANA REGULER PROGRAM PNPM
Propinsi JAWA BARAT Jenis SALAKOT PIPA PVC ф 12 "
Kota BANDUNG Ukuran 60
Kecamatan COBLONGKetua Tim
Kelurahan LEBAK GEDE
Masa Pendaftaran tanggal :01-02 September 2013Tempat Pendaftaran : di Balai RW 14
No. Jenis PekerjaanJumlah Kebutuhan
Bulan 1 Bulan 2 Bulan 3 Bulan 4L P L P L P L P
1 SALAKOT PIPA PVC ф 12 "
Jenis Pekerjaan Perbaikan Salakot PVC 12"
No. Nama Alamat Tanda tanganL P
1234567
Pendaftaran untuk Jenis Pekerjaan (sesuai dengan Tabel diatas)
Jenis Kelami
n
Umur
(TH)
FASKEL
( )
UPL
( )
DISIAPKAN OLEH :KETUA KSM
( )
DIPERIKSA OLEH : Bandung, 01 September 2013
BERITA ACARAPENETAPAN HARGA SATUAN BAHAN,UPAH & ALAT
*) Harga Satuan sampai dilokasi Kegiatan (sudah termasuk biaya Transport)
Pada hari ini, Minggu tanggal Satu Bulan September Tahun Dua Ribu Tiga Belas, bertempat di Rumah Ketua RW 14, Kelurahan Lebak Gede, Kecamatan Coblong, Kota Bandung, telah mengadakan pertemuan yang dihadiri oleh 15 orang (daftar hadir terlampir) untuk mengadakan musyawarah dan menyepakati penetapan Harga Satuan Bahan, Upah & Alat sebagai berikut :
HARGA SATUAN SESUAI
STANDAR KOTA 2009
REKOMENDASI HARGA TERENDAH YANG
DIPILIH UNTUK BULAN INIKelp.Masy. -
1HARGA
SATUAN*)
HARGA SATUAN SESUAI
STANDAR KOTA 2009
REKOMENDASI HARGA TERENDAH YANG
DIPILIH UNTUK BULAN INIToko/
Pemasok Subur Jaya
Toko/Pemasok
Subur Bersama
Toko/Pemasok
Mekar Sawargi
HARGA SATUAN*)
Nama Toko/Pemaso
k
Besi ø 8"
Demikian Berita Acara Kesepakatan ini dibuat dan ditandatangani oleh wakil peserta masing-masing untuk dipergunakan sebagaimana mestinya.
Bandung, 01 September 2013 2010
FASKEL
( )
UPL
( )
KETUA KSM
( )
DIPERIKSA OLEH : DIBUAT OLEH :
MENGETAHUI :LURAH
( )
Koordinator BKM
( )
Form Hasil Penetapan Harga
LURAH
( )
Koordinator BKM
( )
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN(PNPM-MP)
PERHITUNGAN VOLUME/KUANTITAS PEKERJAAN
Propinsi : Jawa Barat KSM/Panitia PuyuhKota : Bandung Jenis KegiatanKecamatan : Coblong Volume 60.00 MKelurahan : Lebak Gede Lokasi RT. 01 RW. 14
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN(PNPM-MP)
PERHITUNGAN KEBUTUHAN DAN BIAYA TENAGA KERJA/BAHAN/ALAT DAN ADMINISTRASI
(per Item Pekerjaan)
Propinsi : Jawa Barat KSM/Panitia PuyuhKota : Bandung Jenis Kegiatan Salakot Pipa PVC Ø 12"Kecamatan : Coblong Volume 60Kelurahan : Lebak Gede Lokasi RT. 01 RW. 14
No Koefisien U raian Volume Satuan Harga Satuan Jumlah Harga
10 Administrasi Papan Nama Proyek - Ls - - Pelaporan ( Proposal, LPJ dijilid ) X 4 - Ls - - Dokumentasi (Foto 0%, 50%, 100% ) X 4 - Ls - - Prasasti - Ls - -
Sub Total (10) - Jumlah Biaya Kontruksi 7,070,699 Jumlah Biaya Administrasi - Jumlah Total 7,070,699 Dibulatkan 7,070,000
Cat :Volume per satu satuan pekerjaan atau koefisien diambil dari koefisien Analisa harga satuan Kota/Kabupaten yang disahkan oleh Walikota/Bupati.
Pasangan Pipa PVC Ø 12"Pasangan Pipa PVC Ø 12 "
Form - RAB 5
FASKEL
( )
UPL
( )
DIBUAT OLEH :KETUA KSM/PANITIA
( )
DIPERIKSA OLEH : Bandung, 02 September 2013
I59
ali:
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN(PNPM-MP)
RENCANA ANGGARAN BIAYA DARI KONTIBUSI MASYARAKAT & BLM PNPM
Propinsi : Jawa Barat KSM/Panitia PuyuhKota : Bandung Jenis Kegiatan Salakot Pipa PVC Ø 12"Kecamatan : Coblong Volume 60Kelurahan : Lebak Gede Lokasi RT. 01 RW. 14
NOSWADAYA MASYARAKAT PNPM
Volume Jumlah Harga Volume Jumlah Harga
A. TENAGA KERJA :1 Tukang HOK 11.14 11.14 60,000 668,660 - 60,000 - 2 Pekerja HOK 2.64 2.64 40,000 105,641 40,000 -
B. BAHAN BANGUNAN :1 Pasangan Pipa PVC Ø 12" Btg 14.25 0.25 400,000 100,000 14.00 400,000 5,600,000 2 Bata Merah Bh 399.29 49.29 700 34,505 350.00 700 245,000 3 Semen (50 kg) zak 2.48 0.48 63,000 30,264 2.00 63,000 126,000 4 Pasir Beton M3 0.10 0.10 180,000 17,496 180,000 - 5 Pasir Pasang M3 0.25 0.25 105,000 25,754 105,000 - 6 Btg 2.275 0.28 42,000 11,554 2.000 42,000 84,000 7 Paku 5-7 Cm Kg 0.24 0.24 12,000 2,880 12,000 - 8 Kawat Kg 0.10 0.10 16,000 1,664 16,000 - 9 Papan Terlentang m3 0.01 0.01 1,200,000 17,280 1,200,000 -
C. Alat1 Alat lot2 Alat lot3 Alat lot .
D ADMINISTRASI :1 Papan Nama Proyek Bh - 1.00- - - 1.00 - - 2 Pelaporan ( Proposal, LPJ dijilid ) Ls - 1.00- - - 1.00 - - 3 Dokumentasi(Photo 0%, 50%, 100Ls - 1.00- - - 1.00 - - 4 Prasasti Ls - 1.00- - - 1.00 - -
E. JUM 2 1,015,699 6,055,000 DIBULATKAN 1,015,000 6,055,000 JUMLAH TOTAL BIAYA DARI PNPM DAN SWADYA MASYARAKAT 7,070,000
F KONTRIBUSI SWADAYA MASYARAKAT LAINNYA1 Tanah m2 - 2 Pohon/Tanaman Bh/Ha - 3 Dll -
II JUMLAH (E) - JUMLAH (I & II) 1,015,000 6,055,000
Komponen/Bentuk Kontribusi Swadaya Masyarakat
Satuan
Total Volume Harga
SatuanHarga Satuan
Besi Ø8
Form - RAB 6Lamp. BA Kesanggupan Kontribusi Swadaya Masyarakat
FASKEL
( )
UPL
( )
DIBUAT OLEH :KETUA KSM/PANITIA
( )
DIPERIKSA OLEH :
Bandung, 02 September 2013
9.70
2
14
2,625,000
2,262,400
35,000,000
32,375,000
7,070,000 10,820,000
7,070,000
-
-
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN(PNPM-MP)
REKAPITULASI RENCANA ANGGARAN BIAYA (SWADAYA DAN BLM PNPM )
Propinsi : Jawa Barat KSM/Panitia Puyuh Kota : Bandung Jenis Kegiatan Salakot Pipa PVC Ø 12" Kecamatan : Coblong Volume 60.00 Kelurahan : Lebak Gede Lokasi RT. 01 RW. 14
A TENAGA KERJA 774,302 - 774,302 10.95 - - 774,302 - 774,302 10.95
B B A H A N 241,397 6,055,000 6,296,397 89.05 - - 241,397 6,055,000 6,296,397 89.05
C ALAT - - - - - - - - - -
D BIAYA ADMINISTRASI - - - - - - - - - -
JUMLAH (A s/d D) 1,015,699 6,055,000 7,070,699 100.00 - - - - 1,015,699 6,055,000 7,070,699 100.00
H DIBULATKAN 1,015,000 6,055,000 7,070,000 100.00 1,015,000 6,055,000 7,070,000
I KONTRIBUSI SWADAYA MASYARAKAT LAINNYA
1 Tanah - - - -
2 Pohon/Tanaman - - - -
3 Dll.
J JUMLAH (1 s/d 3) - - - -
K JUMLAH (H & J) 1,015,000 6,055,000 7,070,000 - - - 1,015,000 6,055,000 7,070,000
Form - RAB 7
FASKEL
( )
UPL
( )
DIBUAT OLEH :KETUA KSM/PANITIA
( )
DIPERIKSA OLEH :Bandung, 02 September 2013
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN(PNPM-MP)
RENCANA JADWAL PELAKSANAAN KEGIATAN SARANA & PRASARANA
Propinsi : Jawa Barat KSM/Panitia PuyuhKota : Bandung Jenis Kegiatan Salakot Pipa PVC Ø 12"Kecamatan : Coblong Volume 60Kelurahan : Lebak Gede Lokasi RT. 01 RW. 14
I. Pekerjaan Persiapan1.1 Pekerjaan Galian Pasangan pipa 9.12 M3 3.10 0.251.2 Pekerjaan Galian bak Kontrol 0.99 M3 0.34 0.25
II. Pekerjaan Pelaksanaan2.1 Pasasangan Pipa PVC Ø 12 " 57.00 M1 84.98 1.252.2 Pekerjaan Urugan Tanah Kembali 2.28 M3 0.37 0.252.3 Pek. Bekisting 0.60 M3 0.36 0.252.4 Pek. Penutup Bak Kontrol 0.18 M3 0.88 0.252.5 Pek. Pas. Bata Bak Kontrol 5.70 Kg 7.00 0.502.6 Pek. Pembesian Bak kontrol 10.40 Kg 1.602.7 Pek. Plesteran + Acian Bak Konrol 1: 3 5.70 M3 1.39 0.50
III. Administrasi 1.00 Ls 0.00 0.25Monitoring dan Evaluasi 1.00 LsOperasional dan Pemeliharaan 1.00 LsJumlah 100.01 3.75