Page 1: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 1/62

1

The BOLEO CopperThe BOLEO Copper

ProjectProject

September 2002September 2002

Page 2: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 2/62

2

BOLEO Copper Deposit

• Located in Baja California, Mexico

• Ore is complex, fine grained oxide,sulphide and mixed oxide / sulphidecontaining 40% clay

• Treatment is complex

Page 3: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 3/62

3

Project History1997

• Project optioned by International CuratorResources

• Fluor Daniel Wright conducted feasibility

study based on extensive testwork byLakefield, CMRI, Pocock and others

• Complex process with high capital andoperating costs

• Project put on hold

Page 4: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 4/62

4

Ore Preparation

- SAG Mill

Oxidation

Leach

Reduction

Leach

 Neutralization

In-Pulp Sulfide

Precipitation

Bulk Sulfide

Flotation

Filtration and

Washing

Concentrate

Roasting

Calcine

Leaching

Copper SX/EW

Zinc SX/EW

Cobalt SX/EW

Boleo Ore Rejects

H2SO4

H2SO4 + SO2 + S

High Acid

Consuming Ore

H2S

Floatation ReagentsFloatation Tails

to Disposal

Wash Water 

Filtrate to Leach

Air  SO2 to Leach

H2SO4 + Water 

Copper Cathode

 NaOH

 NaOH

Zinc Cathode

Cobalt Cathode

Waste Solution to Disposal

Fluor 97 Base Case

Page 5: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 5/62

5

Project History2001 - 2002

• Project returned by Mintec InternationalCorporation

• Bateman asked to review 1997 study and

develop a simpler, conventional, process• Conducted scoping study for simpler, lessexpensive process, based on previous test

reports• Proposal for full feasibility study with

additional testwork 

Page 6: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 6/62

6

Geology and Mineralogy

• Boleo’s Cu-Co-Zn mineralisation occursin mantos with gradation in mineraltype and metal grade from a distinct

(barren conglomerate) footwall overlaindirectly by high grade ore to a less

distinct gradational hanging wall.

Page 7: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 7/62

7

Mineralogy (Continued)• 1955 US Geological Survey study of the

Boleo deposit provides an overview of thecomplex and highly variable mineralogy of 

the manto structures. Notable featuresinclude;

Page 8: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 8/62

8

Mineralogy (Continued)

High clay content (up to 60%);Saline in-situ water content of 20-25%;

Large variety of oxide mineralization,including simple oxides, carbonates,oxychlorides, silicates and mixed

(ferrite) oxides;Sulfides, when present, of extremely finegrain size.

Page 9: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 9/62

9

Process Implications

• Solid – Liquid Separations will beChallenging due to Clayey Oretypes

• Process in Seawater (high chloride) dueto Salinity of Natural Ore

• Must Use a Variety of Chemistries to

Dissolve all Metal (Cu/Co/Zn) Minerals

Page 10: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 10/62

10

Design Objectives

• Keep it Simple• Inexpensive

• Use proven process steps• Maximum use of previous testwork data

Page 11: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 11/62

11

Design Basis

11,500 t/d

47,000 t/aCopper production

2,750 t/aCobalt production

20,000 t/aZinc production

5.54 %MnO2

0.62 %Zn (oxide and sulfide)0.089 %Co (oxide and sulfide)

1.36 %Cu (oxide and sulfide)

 Average ore grade

4,025,000 t/a Annual ore throughput

Page 12: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 12/62

12

Testwork Review

• Extensive testing done on all unitoperations for previous study

• Some results appeared to have been

overlooked (thickening) and have beenrevisited

• Conclusion – Testwork data would form good basis fordevelopment of new process

Page 13: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 13/62

13

Process Options Review

• Seven process options considered andassessed according to

 – Technical viability (proven vs. novel)

 – Perceived capital and operating costs

 – Operability

• One option chosen as base case forscoping study

Page 14: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 14/62

14

Major Process Changes

• Removal of sulphide flotation androasting operations

• Addition of CCD circuit for solid-liquidseparation to allow base metal recoveryfrom SOLUTION, NOT SLURRY 

• Based on high rate thickening testresults from previous work 

Page 15: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 15/62

15

Thickening Testwork Review• Tests done by Pocock Industrial Inc on leach residues

• Initial tests indicated settling rates of up to 2 m2 /t/day.These high figures preclude efficient use of CCD circuit –hence flotation-roasting option considered previously.

• Two high-rate thickening tests at end of test campaignshowed settling rates of 0.1 m2 /t/day. These resultsappear to have been overlooked in previous study.

• Results reviewed by Bateman and Delkor

• Decision taken to proceed on basis that high-ratethickening test results are indicative of full-scaleoperation.

• Follows Bateman experience on similar clayey ores (eg.Bulong)

Page 16: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 16/62

16

Process - Basic

MILLOXIDISING

LEACH

REDUCING

LEACHCCD

Cu

SX / EW

SULPHIDE

PRECIP

SULPHIDE

LEACH

Zn

SX / EW

Co

SX / EW

 Acid SO2 Water 

Tailings

Copper 

CobaltZinc

Oxygen

H2S

Tailings

Leach

Residue

Page 17: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 17/62

17

Process - Detail

OX

LEACH

RED

LEACH

NEUT 1

CCD

NEUT 2

TAILINGS

Cu SX

Cu EW

NEUT 3SULPHIDE

PRECIP

SULPHIDE

LEACH

Fe

REMOVAL

Cu / Cd

CEMENT

Zn SX 1Zn EW Zn SX 2

NEUT

Co SXCu / Zn

IX

Co EW

Ore

 Acid

SO2

HAC

Zinc

Cathode

HACLime

 Air 

Decant Tailings

Copper 

Cathode

HAC H2S O2

 Air 

Limestone

Zn Dust

Cobalt

Cathode

NaOH

NaOH

Limestone

 Air 

Water 

Page 18: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 18/62

18

ProcessCrushing & Milling

• Primary jaw crusher

• Scrubber for clay removal

• Single stage ball mill for scrubber

oversize

• Cyclone classification

• 40% w/w solids @ P80 = 200 µm

Page 19: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 19/62

19

ProcessLeaching

• Two stage leach maximises recoveries

• Oxidising leach – Majority of copper and some zinc leached

 – High acid consumption due to gangue• Reducing leach

 – Metal values associated with manganesedioxide (mainly cobalt) leached

 – Reducing conditions maintained with SO2

Page 20: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 20/62

20

Leach Chemistry

• Oxidizing Leach Using Natural MnO2 in ore

MS + MnO2 + 2H2SO4 = MSO4 + MnSO4 + 2H2O + S

where M = Cu, Co, Zn

• Reducing Leach Using Sulfur Dioxide Addition

MnO2 + SO2 = MnSO4

cobalt in Mn-Oxide is leached

Page 21: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 21/62

21

Ore Characterization Tests(From Fluor Study)

Bed

Number

No. of 

Intervals

Sulfide

(%)Carbonate

(%)

Net MnO2

(%)

2 27 0.09 7.06 9.8

3AA 9 0.28 2.15 8.1

3A 78 0.82 4.49 7.9

3 147 0.24 3.40 5.9

Page 22: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 22/62

22

ProcessLeaching

• Overall Leach recoveries

 – Copper 91%

 – Cobalt 87%

 – Zinc 73% – Manganese 97%

• Acid consumption ~180 kg/t ore• SO2 consumption ~ 25 kg/t ore

Page 23: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 23/62

23

ProcessStage 1 Neutralisation

• Partial neutralisation with high acidconsuming ore (HAC)

• Product solution is amenable to Cu

SX/EW• Two functions:

 – Raise pH after leaching – Oxidise Cu1+ to Cu2+ (air sparging)

Page 24: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 24/62

24

Neutralization Chemistry

• High Acid Consuming Ore is Available atSite and Contains Ca/Mg Carbonates

H2SO4 + CaCO3 → CaSO4 + H2O + CO2

H2

SO4

+ MgCO3

→ MgSO4

+ H2

O + CO2

Page 25: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 25/62

25

ProcessCCD

• Six large thickeners

• Washing with discharge solution fromsulphide precipitation (free of copper,

cobalt and zinc), plus sea water make-up

• 97% washing efficiency

Page 26: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 26/62

26

ProcessStage 2 Neutralisation

• Tailings neutralisation with HAC andlime

• Neutralisation to pH 5 to 6 for soluble

metal precipitation• Manganese not precipitated – contained

in soluble form in tailings dam

Page 27: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 27/62

27

ProcessCopper SX from Partially Neutralized Leach Solution

• Extraction with LIX984N @ 15% v/v

• Extraction – 2 mixer settlers

 – 98% extraction

• Scrubbing – 1 mixer settler

 – Removal of entrained manganese and chloride

• Stripping – 2 mixer settlers

 – Stripping with EW spent electrolyte

Page 28: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 28/62

28

ProcessCopper EW

• Electrowinning under standardconditions

• LME Grade A copper produced

Page 29: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 29/62

29

ProcessStage 3 Neutralization

• Neutralization with HAC

• Two functions:

 – Neutralize acid generated in copper SX

 – Precipitate residual iron prior to sulphideprecipitation

Page 30: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 30/62

30

ProcessSulphide Precipitation

• Acts as primary purification step for zincand cobalt

• Zinc, cobalt and residual copper

precipitated with H2S gas• Iron, manganese, magnesium,

aluminium and calcium remain insolution (recycled to CCD in wash)

Page 31: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 31/62

31

ProcessSulphide Leach

• Precipitated sulphides dissolved at high

efficiency in oxidising pressure leach @150°C

• Sulphur oxidation controlled to producesome elemental sulphur (assists withoverall sulphur balance)

• Acid provided in recycle from primaryzinc SX

Page 32: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 32/62

32

ProcessSolution Purification

• Zinc / cobalt solution purified in two stages

• Stage 1

 – Iron removal by precipitation using limestone andair

 – Some copper removed

• Stage 2

 – Cadmium removal with zinc dust – Residual copper removed

Page 33: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 33/62

33

ProcessZinc SX

• Extraction with D2EHPA @ 40% v/v

• 2 stage extraction with intermediateneutralisation

• Primary extraction – 1 Bateman Pulsed Column

 – No pH control

 – 60% extraction

 – Raffinate split• 75% to sulphide leach

• 25% to neutralisation

Page 34: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 34/62

34

ProcessZinc SX

• Intermediate neutralisation

 – pH raised using limestone – Residue recycled to oxidising leach

• Secondary extraction – 1 Bateman Pulsed Column

 – pH control using sodium hydroxide

 – 99.5% extraction

 – Loaded organic to primary extraction

Page 35: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 35/62

35

ProcessZinc SX

• Scrubbing

 – 3 mixer settlers – Physical removal of entrained impurities as well as

chemical scrubbing of calcium

• Stripping – 1 Bateman Pulsed Column

 – Stripping with EW spent elecrolyte

• Regeneration – 1 mixer settler

 – Iron removal from bleed using 6M HCl

Page 36: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 36/62

36

ProcessZinc EW

• Electrowinning under standardconditions

• SHG zinc produced

Page 37: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 37/62

37

ProcessCobalt SX

• Extraction with Cyanex 272® @ 25% v/v

• Extraction – 1 Bateman Pulsed Column

 – pH control using sodium hydroxide

 – 99.95% extraction

• Scrubbing – 2 mixer settlers

 – Primarily for nickel removal

• Stripping

 – 1 Bateman Pulsed Column – Strip solution dependant on cobalt product

Page 38: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 38/62

38

ProcessCobalt Purification - IX

• Residual copper, zinc and others

removed from cobalt electrolyte by ionexchange

• IX columns in “lead-lag” configurationfor maximum efficiency

Page 39: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 39/62

39

ProcessCobalt EW

• Electrowinning under standard

conditions in undivided cells

• Alternative for cobalt sulphideproduction also considered

Page 40: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 40/62

40

ProcessReagents

• Elemental sulphur imported for production of 

 – H2SO4 (produced in acid plant)

 – SO2 (produced in acid plant sulphur burner)

 – H2

S (produced from molten sulpur andhydrogen from Naphta reformer)

 – Acid plant generates 31 MW net power

• Limestone milled on site• All other reagents used as supplied

Page 41: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 41/62

41

Major Reagent Consumptions

386,000

1,948,000

2,038,000

882,000

1,224,000

7,000,000

Cost

US$

Consumption

t/a

SX Organic Reagents

7,800Sodium Hydroxide

760Flocculant

14,000Hydrogen Sulphide

87,400Sulphur Dioxide*

764,400Sulphuric Acid*

Page 42: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 42/62

42

Metsim ModellingGeneral

• Metsim model set up to calculate

 – Flows and compositions of major streams,including recycles

 – Major reagent consumptions

 – Heating and cooling requirements• Steady-state simulation using simple unit

operations used to simulate more complex

real-life operations• Testwork data and information from previous

studies used where possible

Page 43: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 43/62

43

Metsim ModellingMass Balance Calculations

• High level of accuracy

• 73 components considered in 4 phases – 42 inorganic solid

 – 16 inorganic aqueous

 – 8 organic aqueous – 7 gaseous

• Major elements include Cu, Co, Zn, Ni, Fe,Mn, Mg, Na, S, Ca, Si, Cl

Page 44: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 44/62

44

Metsim ModellingEnergy Balance Calculations

• Lower level of accuracy

• All stream temperature calculations done byMetsim using thermo data from Metsimdatabase and other sources

• Heat loss from equipment not simulated

• Heat exchangers simulated using steam or

cooling water – no solution interchangesimulated due to model stability

Page 45: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 45/62

45

Metsim ModellingFeed Mineralogy

• Not readily available from previous work 

• Mineralogy developed based on

 – Previous test results

 – Recent sample analyses• Oxide / sulphide split difficult to determine

with any accuracy

• Mineralogy adjusted to produce acid and SO2

consumptions consistent with test results

Page 46: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 46/62

46

Metsim ModellingFeed Mineralogy

SiO2MgSO4

MgCO3CaCO3

MnO2

FeOOH

0.02NiO

Balance0.56ZnO0.350.33ZnS

5.770.08CoO4.000.026CoS

5.541.28CuO

9.230.41Cu2S

%%

Page 47: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 47/62

47

Page 48: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 48/62

48

Page 49: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 49/62

49

Page 50: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 50/62

50

Page 51: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 51/62

51

Page 52: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 52/62

52

Page 53: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 53/62

53

Metsim ModellingResults

• Model results compare well with available test

data and general plant operating data• Excellent tracking of impurities and water

balance issues

• Energy balance results suitable for sizing of heat exchangers

• Metsim model an invaluable tool for accurateplant design

• Model can be easily and quickly adapted formore detailed design during feasibility study

Page 54: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 54/62

54

Capital CostsDirect Field Costs (US$)

202,439,000TOTAL DIRECT FIELD COSTS

7,269,000Transport

8,296,000Infrastructure

5,862,000Instrumentation

14,639,000Electrical

17,885,000Pipework 

13,430,000Structures

18,748,000Concrete

6,134,000Site Development / Earthworks

53,681,000Mechanical Equipment

56,495,000 Vendor Supply and Install Packages

Page 55: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 55/62

55

Operating Costs

28,964,551

7,086,347

17,715,687

2,558,652

4,559,194

US$/a

7.96TOTAL OPERATING COST

1.76Power

4.40Consumables

0.64Maintenance

1.14Labour

US$/t

Page 56: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 56/62

56

Summary and Conclusions

• Boleo ores can be settled in High RateThickeners

• Conventional CCD will work 

• Cu, Co and Zn recovered from solutionas high quality, saleable products

Page 57: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 57/62

57

Example Projects - Bateman

Mt Gordon

Page 58: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 58/62

58

Insert picture of Mt Gordon Expansion Project

Mt Gordon

Gunpowder Autoclave

Page 59: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 59/62

59

Gunpowder Autoclave

Bulong Nickel Plant

Page 60: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 60/62

60

Ore Preparation

Pressure LeachCCD

SX

Electrowinning

Bulong Nickel Plant

Kasese Cobalt

Page 61: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 61/62

61

Kasese Cobalt

Olympic Dam Expansion

Page 62: Pulsed Columns

7/27/2019 Pulsed Columns

http://slidepdf.com/reader/full/pulsed-columns 62/62

Olympic Dam Expansion