Pull Production is favorable to Push Production – Inventory is controlled between processes – No production can occur without a signal Flow is preferable to Pull: 1. Single Piece Flow 2. FIFO Flow 3. Supermarket Pull Summary: Review of Lean Principles Review of Lean Principles
37
Embed
Pull Production is favorable to Push Production – Inventory is controlled between processes – No production can occur without a signal Flow is preferable.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Pull Production is favorable to Push Production– Inventory is controlled between processes– No production can occur without a signal
Flow is preferable to Pull:1. Single Piece Flow
2. FIFO Flow
3. Supermarket Pull
Summary: Review of Lean Principles
Review of Lean Principles
Creating a Pull System
Review of Lean Principles
Creating a Pull System
Supermarket Pull Systems
Daily Supermarket Operation
Workshop Summary
Why not use Single Piece Flow Everywhere?
When one process stops producing, ALL processes must stop, so Single Piece Flow will not work in the following conditions:Different changeover times between processesExcessive machine downtimeCycle times vary between processes for each product within the familyHigh scrap or rework ratesOne of the processes is shared by two or more value streams
Creating a Pull System
If Single Piece Flow is the best solution, why would we ever implement FIFO or Supermarkets?
Creating a Pull System
1. Identify the reasons that a Pull system is necessary
2. Calculate the maximum inventory
3. Create a signal system (if required)
4. Implement and improve the processes to reduce the maximum required inventory
Creating a Pull System
3 Types of Inventory
1. Cycle Stock– Inventory required for the “normal” state
2. Buffer Stock– Inventory required to accommodate variation in
volume and mix
3. Safety Stock– Inventory required to protect against things that could
go wrong (within reason)
Creating a Pull System
3 Types of InventoryExample #1: ChangeoverExample #1: Changeover
The stamping press has a lengthy die change (4 hrs on average), but the plating process cannot afford to stop producing during this time (at a rate of 1 unit every 20 minutes). Because the die change is not standardized, it can take 3-5 hours to complete. Sometimes the wrong die will be installed, which takes another hour to correct.
Cycle Stock = 12 units (240 min. / 20 min.)Buffer Stock = 3 units (60 min. / 20 min.)Safety Stock = 3 units (60 min. / 20 min.)Total Inventory = 18 units (6 hrs)
Creating a Pull System
3 Types of InventoryExample #2: Machine DowntimeExample #2: Machine Downtime
Parts are etched before going to final assembly, but the etching machine has uptime issues, and final assembly cannot afford not to produce at a takt of 2 min. Typical breakdowns are corrected in 30 minutes, but depending on the problem, it can take up to 2 hours, and this does not include the time it takes for maintenance to arrive, which could be anywhere from 5 to 30 minutes.
Cycle Stock = 15 units (30 min. avg. / 2 min. takt)Buffer Stock = 45 units (90 min. / 2 min. takt)Safety Stock = 15 units (30 min. delay / 2 min takt)Total Inventory = 75 units (2.5 hrs)
Creating a Pull System
3 Types of InventoryExample #3: IntervalExample #3: Interval
The CNC Lathe has an interval of 5 days (i.e. it takes 5 days to cycle through all products within the family). For Product A, the average 5-day demand is 100 units. However, the peak 5-day demand is 300 units. The CNC Lathe has a scrap rate of 2%.
Cycle Stock = 100 units (avg. interval demand)Buffer Stock = 200 units (peak – average)Safety Stock = 6+ units (2% is the avg scrap rate!)Total Inventory = 206+ units (2.06 days)
Creating a Pull System
A machining process produces 2 parts: part A (2 min. CT) and part B (3 min. CT). The average daily demand is 100 units of A and 50 units of B. Although the total daily demand will always be 150 units, the mix can change by +/- 25 units. The machining process takes 30 minutes to changeover between products and has a 95% uptime and 98% first pass yield. In humid weather, an additional 5% of units need to be scrapped at final assemby. The process works 1 shift of 430 min.
1.What is the Interval of the machining process?
2.How much Cycle, Buffer and Safety Stock is required?
1. Cycle Stock– Inventory required for the “normal” state
2. Buffer Stock– Inventory required to accommodate variation in
volume and mix
3. Safety Stock– Inventory required to protect against things that could
go wrong (within reason)
Supermarket Pull Systems
Review of Lean Principles
Creating a Pull System
Supermarket Pull Systems
Daily Supermarket Operation
Workshop Summary
supermarket
CustomerProcess
Supplier Process
productionkanban
withdrawnproduct
withdrawalkanban
replenishedproduct
Guiding Question #5:Where must we use supermarket pull systems?
Purpose: Provide production instruction to upstream processes that cannot be linked in flow.
Supermarket Pull Systems
Guiding Question #5:Where must we use supermarket pull systems?
The difference between FIFO & Supermarkets: FIFO responds to a known demand Supermarkets hold inventory for an unknown demand
Example: The Supplier Process has a 30 minute changeover The takt time is 5 minutes and the value stream has 3 products What maximum inventory must the FIFO lane accommodate? What maximum inventory must the supermarket accommodate?
Supermarket Pull Systems
Types of Supermarket Pull Systems
1. Top-Up System
2. Signal Kanban
3. 2-Bin Kanban
4. 3-Bin Kanban
5. Multi-Card Kanban
Simple but poor inventory control
Complex but excellent inventory control
Supermarket Pull Systems
Top-Up Pull System
Material is delivered at a set period, and any material that was consumed during this period is replenished– Cycle Stock = avg. consumption during the period– Buffer Stock = peak – avg. consumption– Safety Stock = late delivery + peak defect rate
Ideal for small, low-cost parts where high inventory control is not essential– E.g. Nuts, bolts, washers, etc.
Supermarket Pull Systems
Top-Up Pull SystemExample
Every month, the hardware supplier comes into the facility and fills up all of the hardware containers (nuts, bolts, screws, etc.). Each container is marked with a line to indicate how much to fill it. The inventory is equal to the average monthly consumption (cycle stock), plus a buffer to handle peak production periods (buffer stock), and an allowance for up to 2 days incase the supplier is late delivering.
Supermarket Pull Systems
Top-Up Pull System
Advantages: Very easy to use (no signals required)
Disadvantages: Inventory hovers at the high end because it gets
replenished regardless of consumption Very inefficient for the material handler:
– Must visit this location every period– Must bring enough material to completely replenish the
inventory (no way to know how much has been consumed)
Supermarket Pull Systems
2-Bin Kanban Pull System
Material is stored in 2 containers of a set quantity. Every period, a material handler takes away empty containers and returns them the next period.– Cycle Stock = 2 x avg. period consumption– Buffer Stock = 2 x (peak – avg. consumption)– Safety Stock = late delivery + peak defect rate
Ideal for processes that consume many parts, especially if each part has a different rate of consumption– E.g. Assembly processes
Supermarket Pull Systems
2-Bin Kanban Pull SystemExample
The material handler checks the assembly process every hour. As each container is emptied, it is placed in a specific location. The material handler retrieves these empty containers and spends the rest of the hour replenishing them. They then return the replenished containers to the assembly process and collect any containers that are now empty.
Supermarket Pull Systems
2-Bin Kanban Pull System
Advantages: Easy to understand and use Parts are only delivered if they have been consumed
Disadvantages: Each bin requires twice the period demand for cycle
stock– This makes inventory levels rather high. For example, if the
material handler delivers product every hour, then there will be 4 hours of inventory (2 hours per bin).
Supermarket Pull Systems
Multi-Card Kanban Pull System
Cards are used to signify a set amount of material. When that material is consumed, the card is returned to the supplier to indicate that more inventory is required.
The supplier places returned cards on a board and uses them to determine which product to build next. – Cycle Stock = Avg. consumption for supplier interval– Buffer Stock = Peak – Avg. consumption for interval– Safety Stock = late delivery + peak defect rate
Ideal for processes that have an interval– E.g. Machining processes or Suppliers (where the
interval = delivery frequency)
Supermarket Pull Systems
Multi-Card Kanban Pull SystemExample
At the end of each day, the Team leader collects the kanban sheets from the boxes of material that the assembly process opened. They fax these sheets to the supplier and shreds them. The supplier receives the faxed sheets and places them on a board. When this product is the highest on the board, the supplier will changeover. As each box is completed, the sheet is placed on it, and it is sent to shipping for delivery.
Supermarket Pull Systems
2-Bin Kanban Pull System
Advantages: Excellent control of inventory Minimizes the amount of inventory required
Disadvantages: Requires signals to be sent repeatedly Is more sensitive to changes in data than the other
systems (needs to be kept up to date) Requires delivery of material almost every period
Supermarket Pull Systems
Summary: Supermarket Pull Systems
Supermarket Pull Systems
supermarket
CustomerProcess
Supplier Process
productionkanban
withdrawnproduct
withdrawalkanban
replenishedproduct
Purpose: Provide production instruction to upstream processes that cannot be linked in flow.
Daily Supermarket Operation
Review of Lean Principles
Creating a Pull System
Supermarket Pull Systems
Daily Supermarket Operation
Workshop Summary
Inventory Hides Waste
Daily Supermarket Operation
Reducing Inventory
Cycle Stock: Increase the frequency / reduce the interval
– Reduce cycle time - Improve machine uptime– Reduce defect rate - Increase available run time– Reduce changeover time
Inventory requirement calculations are a great place to start, but theoretical calculations can either miss factors, and they can also be overly cautious
Monitor inventory levels for a three months, and record the maximum range of inventory for each product (the highest amount – the lowest)
Remove half of the difference between this amount and the maximum and keep monitoring
Daily Supermarket Operation
Reducing InventoryExampleExample
After 3 months of operating the new multi-card kanban system, the company has identified that the following:
Daily Supermarket Operation
Product Max High Low Range New MaxA 30 28 4 24 27B 20 20 6 14 17C 50 45 11 33 41
Since product A fluctuated between 4 and 28 units of inventory for 3 months, this is a strong indication that only 24 units of inventory is actually required. To be safe, the company removes only half of the difference (3 units) and keeps monitoring.
Summary: Daily Supermarket Operation
Cycle Stock: Increase the frequency / reduce the interval
– Reduce cycle time - Improve machine uptime– Reduce defect rate - Increase available run time– Reduce changeover time
Push Production: Production is triggered by a forecasted schedule. Each process attempts to build to this schedule and “push” their finished products onto the next process whether that process is ready for them or not.
Pull Production: The schedule is delivered to a single process (called the “pacemaker”). Production is triggered at upstream processes by consumption of a constrained amount of inventory which is used to buffer against problems.
Workshop Summary
Hierarchy of Process Connections
1. Single Piece FlowNo inventory is allowed to accumulate between processing steps.
2. FIFO FlowA controlled amount of inventory is allowed to accumulate between processes. Inventory is consumed in the same order it is produced (i.e. First In First Out).
3. Supermarket Pull SystemsA controlled amount of inventory is maintained between processes. As the customer process consumes a product, a signal is delivered to the supplier process to replace it. The supplier is not authorized to produce without this signal.
Workshop Summary
3 Types of Inventory
1. Cycle Stock– Inventory required for the “normal” state
2. Buffer Stock– Inventory required to accommodate variation in
volume and mix
3. Safety Stock– Inventory required to protect against things that could
go wrong (within reason)
Workshop Summary
Types of Supermarket Pull Systems
1. Top-Up System
2. Signal Kanban
3. 2-Bin Kanban
4. 3-Bin Kanban
5. Multi-Card Kanban
Simple but poor inventory control
Complex but excellent inventory control
Workshop Summary
Reducing Inventory
Inventory requirement calculations are a great place to start, but theoretical calculations can either miss factors, and they can also be overly cautious
Monitor inventory levels for a three months, and record the maximum range of inventory for each product (the highest amount – the lowest)
Remove half of the difference between this amount and the maximum and keep monitoring