~ PSH-OIO8 P. 1 1. Scope This instruction explains and pull ing-out the procedures for pushing-up KEYLESS PROPELLER. 2. Pushing-up procedure at shipyard 2.1 Working equipment and instructions (Refer to Fig. 1) 2.2 Preparations for pushing-up ( Refer to Fig.I ) (1) Clean the inner cone part propeller shaft. of the propeller boss and outer surface of (2) Lift up the propeller and mount it on the propeller shaft. At this time, align the match marks on the propeller boss end on the propeller shaft aft end. ( Allowable deviation: ::!:5 nun on shaft surface) to meet those (3)Fit K Nut to the propeller shaft and screw it until its bearing face comes into contact with the aft end of the propeller boss. (4) Attach a thermometer to each of the propeller boss and the propeller shaft. (5)Fit packings and connectors in the boss expansion oil port in the aft end of i No. Description Q'ty Remarks 1 K Nut 1 2 Hydraulic oil pump 1 (for main engine tool) 3 Flexible hose 2 4 Pressure gauge 1 5 Connector 2 with packing 6 Plug 2 7 Magnetic holder 2 8 Dial gauge 2 9 Thermometer 2 10 Thinner 2'""'-'3 Ii ters 11 Oil for hydraulic pump - Equal to SAE No.20
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
~
PSH-OIO8 P. 1
1. Scope
This instruction explains and pull ing-outthe procedures for pushing-upKEYLESS PROPELLER.
2. Pushing-up procedure at shipyard
2.1 Working equipment and instructions (Refer to Fig. 1)
2.2 Preparations for pushing-up ( Refer to Fig.I )
(1) Clean the inner cone part
propeller shaft.
of the propeller boss and outer surface of
(2) Lift up the propeller and mount it on the propeller shaft.
At this time, align the match marks on the propeller boss end
on the propeller shaft aft end.
( Allowable deviation: ::!:5 nun on shaft surface)
to meet those
(3)Fit K Nut to the propeller shaft and screw it until its bearing face comes
into contact with the aft end of the propeller boss.
(4) Attach a thermometer to each of the propeller boss and the propeller shaft.
(5)Fit packings and connectors in the boss expansion oil port in the aft end of
No. DESCRIPTION No. DESCRI PTION1 KNUT 6 PLUG2 HYDRAULIC 0 I L PUMP3 FLEXIBLE HOSE4 PRESSUREGAUGE 11 0 I L (FORHYDRAULIC PUMP)5 CONNECTOR 12 VKXJDENBLOCK
PSH-O 108
- -- -
P.8
22
8-20 -10 0 10 20 30 40 50
:;f a"" 5 i1tA'><'r;t$ffi(J);.ffii~ (ittl, \15 ~i~J~) (Oe)TEMPERATURE OF PROPELLER BOSS OR SHAFT ( USE THE LOWER ONE) (e)
jg]3. f~56Jj.;'.!:::;fa ""5*;Z *t::r;t~(J);.ffii~.!:: 0)001* (SNO.1236/1237/l239/1240)FIG.3 PUSH-UP TRAVEL Vs. TEMPERATURE OF BOSS OR SHAFT ( SNO.1236/1237/1239/1240 )
~JJW!f~56;'~~Lsll,\t::T s C~~O)?ff~f~56Jj.; (X)NECESSARYPUSH-UPTRAVELEXCLUDINGINITIALPUSH-UPONE( X) UNIT: mm