The Legacy Corporation is revisiting the Pudding Mill masterplan in response to the changing context of adjoining developments, including the Cultural and Education District.
The Legacy Corporation wants to create a vibrant Local Centre at the heart of Pudding Mill, as supported by the Local Plan, which maximises residential capacity and employment opportunities, as well as meeting key priorities around local economic benefit, equality and inclusion, sustainability and community engagement.
INTRODUCTION
London StadiumLondon Aquatics Centre
Pudding Mill
Pudding Mill Introductory Flip-Book | Summer 2016
5
BACKGROUND - LEGACY COMMUNITIES SCHEME
Illustrative Masterplan Produced for LCS (2012)
The Legacy Communities Scheme (LCS) planning application, which was approved in September 2012, proposed a range of employment and residential uses at Pudding Mill, as well as other supporting social infrastructure and open space.
In total the scheme allowed for around 1,300 homes, plus a range of employment floorspace, retail units and community facilities.
Pudding Mill Introductory Flip-Book | Summer 2016
6
The Pudding Mill masterplan aims to create a new residential neighbourhood with a vibrant Local Centre, providing a range of housing typologies to meet local need, as well as flexible employment floorspace, retail units and community facilities; all tied together through a high quality public realm.
BRIEF AND VISION FOR PUDDING MILL
The neighbourhood will include:
• New homes, including sheltered accommodation
• Flexible employment space
• Retail units
• Social infrastructure
• Play space
• Leisure space
The new development will seek to improve pedestrian and cycle connections through the site and maximise on the opportunities presented by its proximity to the Pudding Mill Lane DLR station and Stratford High Street, as well as Queen Elizabeth Olympic Park.
Pudding Mill Introductory Flip-Book | Summer 2016
7
Illustrative Visualisation: City Mill River
Pudding Mill Introductory Flip-Book | Summer 2016
8
WHO’S INVOLVED
LONDON LEGACY DEVELOPMENTCORPORATION (LLDC)Landowner & Developer
ALLIES & MORRISONMasterplanners
BRADLEY-HOLE SCHOENAICH LANDSCAPE ARCHITECTS (BHSLA)Landscape Architect
AECOMPlanning Agent & Environmental Consultant
FLUIDCommunity Consultation
Pudding Mill Introductory Flip-Book | Summer 2016
9
Pudding Mill Introductory Flip-Book | Summer 2016
10
A masterplan usually consists of a series of two dimensional plans and three dimensional images and text describing how an area will be developed.
The outline planning application will set out the vision for the site as well as details of access, scale, character, use and urban design; it provides a foundation from which future Reserved Matters Applications can be prepared.
WHAT IS A MASTERPLAN
The outline planning application will seek to deliver the following for Pudding Mill:
EMPLOYMENTApproximately 36,000 sqm of flexible employment space that can either be used by a single tenant or by tenants, either taking entire floors or subdivided sections.
RESIDENTIALApproximately 1,500 residential homes of which 40 will be assisted living homes.
RETAIL AND LEISURE FACILITIESApproximately 2,500 sqm of retail space and leisure facilities
COMMUNITY FACILITIESUp to 13,142 sqm of community facilities
OPEN SPACEApproximately 16,000 sqm of open space to compliment the wider provision within Queen Elizabeth Olympic Park. The masterplan will also include play space and cater for all ages.
Pudding Mill Introductory Flip-Book | Summer 2016
11
Pudding Mill Introductory Flip-Book | Summer 2016
12
SITE CONTEXT
Pudding Mill sits between Queen Elizabeth Olympic Park to the North and Stratford High Street to the South. Both of which are undergoing a rapid period of change.
Pudding Mill is bounded on two sides by the Waterworks River to the northeast and Bow Back River to the southeast. To the southwest it is contained by Cooks Road, and adjoins existing allotments and the Great Eastern Railway corridor to the northeast.
The City Mill River also runs through Pudding Mill, crossing beneath the Great Eastern Railway corridor at its junction with the Greenway.
In Links folder do again to change name
Pudding Mill Introductory Flip-Book | Summer 2016
13
SURROUNDING CONTEXTThe surrounding context of Pudding Mill, which is subject to rapid change, is defined largely by the Park to the north, Warton Road and the Carpenters Estate to the east, and Stratford High Street plus the associated development at Strand East to the south.
CONNECTIONSThe ‘Greenway’, a strategic pedestrian and cycle route, bisects Pudding Mill and provides an important link between Stratford and Hackney, as well as routes into the Park.
A network of waterways known as the ‘Bow Back Rivers’ intersects with theGreat Eastern Railway viaduct, Greenway (Northern Outfall Sewer) and High Street Stratford.
There is the potential to expand and improve these links, particularly the Greenway, as the near-by UCL East site and Stratford Waterfront are developed.
CHARACTER The site itself was formerly industrial land and is characterised by various site compounds, as well as the Bow Electricity Substation and associated utilities infrastructure that criss-cross the site.
Pudding Mill DLR station is located at the junction of Marshgate Lane and Barbers Road and acts as a new gateway to the site. An allotment roughly 1 hectare in size, is located south of the railway viaduct.
A cluster of residential buildings occupy a triangular piece of land between the City Mill River and Greenway, whilst a number of high rise residential towers are located to the south of the Bow Back River along Stratford High Street.
Bow Back River
Waterworks River
Pudding Mill Introductory Flip-Book | Summer 2016
14
BOW EAST
WICK
BOW EAST
WICK
BROMLEY-BY-BOW
910
11
14
14
16
17
13
12
1
3
18
6
615
4
8
N
STRATFORDNEW TOWN
2
5
Plan showing some of the major developments in the area. (Dots do not indicate locations of facilities)
7
7
THE INTERNATIONAL QUARTERSummary: 4 million sq ft of new workplace - TFL and the FCA confirmed as tenants. A 4 star hotel, shops, restaurants, childcare and community facilities. Up to 25,000 jobs created.
Status: Construction started in 2014, first office occupation in 2017
Developer: Lend Lease and LCR
14
GLASSHOUSE GARDENSSummary: The residential development that forms part of The International Quarter - 330 new homes looking out over the iconic buildings of the south of the Park as part of The International Quarter.
Status: Final completion estimated for 2017
Developer: Lend Lease and LCR
15
CHERRY PARKSummary: Approx 1,200 new homes alongside community facilities, restaurants, cafes and a servicing facility for Marks and Spencer.
Status: Hybrid planning application submitted
Developer: Stratford City Developments Ltd
16
ANGEL LANESummary: Unite student accommodation for 750 students, new hotel, a major apartment tower and offices.
Status: Opened September 2015
Developer: Unite Group Plc
17
STRAND EASTSummary: 1,200 homes, office spaces for a range of businesses including digital and creatives, a riverside park and a range of retail and community uses.
Status: Planning permission granted
Developer: Vastint UK
18
CHOBHAM FARMSummary: A new family neighbourhood delivering around 1000 homes (of which over 40% are family homes), home zone streets, new public space, commercial space and community facilities.
Status: Under construction
Developer: LCR and East Thames Group
13
CHOBHAM ACADEMYSummary: A new school for 3-18 year olds that opened in September 2014. In addition to 100 children in the nursery, when the Academy is at full capacity it will have 600 students in the primary school, a further 900 students in the secondary school and a Sixth Form for 420.
Status: Now open
Developer: A Lend Lease Harris Partnership
12EAST WICKSummary: Up to 870 new homes, new primary school and two new nurseries
Status: Zonal masterplan approved December 2015, Phase 1 detailed design in planning process
Developer: London Legacy Development Corporation, East Wick and Sweetwater Projects Ltd
1
SWEETWATERSummary: Up to 650 new homes including apartments and family homes. A new primary school, two new nurseries, community space, a library and health centre
Status: Zonal masterplan to be submitted for planning approval in summer 2016
Developer: London Legacy Development Corporation, East Wick and Sweetwater Projects Ltd
2
STRATFORD WATERFRONTSummary: A new campus for UAL’s London College of Fashion, along with major new spaces for the Victoria and Albert Museum and Sadler’s Wells.
Status: Cultural and Education District outline planning applications due to be submitted late 2016
Developer: London Legacy Development Corporation with site partners
4
HACKNEY WICK CENTRALSummary: Creation of a new neighbourhood centre focused around Hackney Wick Station. The new station which includes an underpass through the existing embankment will create a new north – south pedestrian link. The neighbourhood centre development will consist of workspace clusters with a diverse range of spaces, retail, local amenities, and the introduction of between 800-850 new homes.
Status: Planning permission granted for the new station. Outline application for the Hackney Wick Neighbourhood Centre to be submitted April 2016
Developer: London Legacy Development Corporation
3
HERE EASTSummary: Transforming the former Olympic Press and Broadcast Centre – an innovation centre set to provide over 1.2 million square feet of space for creative entrepreneurs and creating up to 7,500 jobs on site and in the local community. Key tenants include BT Sport, Hackney Community College, Loughborough University and Infinity SDC.
Status: BT Sport already broadcast on site, fully operational by 2018
Developer: iCITY, a joint venture between Delancey and Infinity SDC
9
CHOBHAM MANORSummary: The first of the five new neighbourhoods from 2015. Including 828 new homes, 75% designed for families and 1/3 affordable homes. Shops, cafes, bars and other facilities will support a vibrant community.
Status: Sales underway, first residents occupied their homes in late 2015
Developer: Chobham Manor LLP
10
EAST VILLAGESummary: 2,818 new homes, a new school (Chobham Academy - see point 12), a new health centre, cafés, bars, restaurants, shops and 27 acres of public space. Further developments for an additional 2,000 homes are currently in the planning process.
Status: Now open
Developer: Get Living London and Triathlon Homes
11
PUDDING MILLSummary: A residential neighbourhood that will deliver up to 1,300 homes, employment floorspace, retail units, community facilities, and a wide range of public open spaces.
Status: Outline planning permission granted with amendments currently being considered by LLDC
Developer: London Legacy Development Corporation
7
RICK ROBERTS WAYSummary: Provision of approx. 500 new homes as part of a mixed-use masterplan.
Status: Outline planning permission granted, with secondary school relocated within PDZ3 (see no. 6) and further amendments under consideration
Developer: London Legacy Development Corporation and Newham
8
THE STADIUMSummary: From 2016 the Stadium will become the home of West Ham United, before then it will host a number of international events including the Rugby World Cup in 2015. A new community track will be open alongside the Stadium and will be home to the Newham and Essex Beagles Athletic Club. The Stadium will also become the new national centre for athletics from 2016.
Status: Fully open from summer 2016
Developer: E20 Stadium LLP
5
LLDC BoundaryPudding Mill Site Boundary
Education / TrainingWorkspace
Health Centre
Community Facilities
Business
Retail / LeisureSportSurrounding Area
Hotel / Student Housing
Cultural / Exhibition
LB Hackney Boundary
LB Tower Hamlets BoundaryLB Newham Boundary
WIDER MAJOR DEVELOPMENTS
19
20
BOBBY MOORE ACADEMY
Summary: A sports specialist secondary school and primary school with a 6th form across two sites.
Status: Planning applications granted
Proposed operator: David Ross Education Trust
6
Pudding Mill Introductory Flip-Book | Summer 2016
15
COOKS ROAD
Summary: Up to 543 residential units, approx. 58,000 sq ft of commercial floorspace and open spaces and landscaping
Status: The application for the southern block has been approved.
Developer: BellwayPartnership
MARSHGATE
Summary: 8 new buildings containing approx. 45,000 sq ft of business floorspace, 254 new homes and open space
Status: Planning permission granted
Developer: Workspace
19
20
Pudding Mill Introductory Flip-Book | Summer 2016
16
OPPORTUNITIES
CHARACTER AREASThe natural division of the site allows for the creation of two distinct, yet interconnected neighbourhoods: a vibrant urban neighbourhood at Pudding Mill defined by the Local Centre and a more domestic and relaxed neighbourhood at Bridgewater..
TRANSPORT CONNECTIONSThe Pudding Mill DLR Station, re- opened in 2014, provides direct access to Stratford Station injust 2 minutes, which acts as an interchange for various onward connections across London.
BridgwaterPudding Mill
Pudding Mill Introductory Flip-Book | Summer 2016
17
CONNECTIVITYAt present Pudding Mill is somewhat isolated, being bounded by various barriers to pedestrian or vehicular movement. The masterplan will explore opportunities to promote new or improved connections to the Park and Stratford High Street, as well as Warton Road. The masterplan will consider the hierarchy of these connections and how they should be linked to new internal routes across Pudding Mill.
WATERWAYSPudding Mill benefits from a variety of waterside with rivers surrounding it on three sides. The masterplan will provide appropriate responses to this special setting by taking into account strategic views and pedestrian movement patterns, as well as townscape considerations.
Pudding Mill Introductory Flip-Book | Summer 2016
18
CONSTRAINTS
RAILWAY VIADUCTThe Great Eastern Railway/Crossrail/DLR viaduct bounds Pudding Mill to the north. Whilst the station itself will offer a degree of active frontage, the viaduct west of the station is comprised of a blank concrete wall.
To the east of the station, the Marshgate Lane underpass separates vehicular and pedestrian routes by way of a significant drop in level.
UNDERGROUND UTILITIESA number of underground constraints such as Power Lines Underground (PLUG), HV cables and their easements as well as utilities within existing roads impact the development of the site.
Pudding Mill Introductory Flip-Book | Summer 2016
19
BOW ELECTRICITY SUBSTATION, Bow Electricity Substation and the new headhouses for the underground power lines are situated in the centre of Pudding Mill, on either side of Pudding MillLane.
These enclosures form part of London’s strategic infrastructure network and have specific operational constraints that need to be respected. They therefore require careful integration into the layout of the neighbourhood to avoid stretches of uninhabited frontage alongside poor quality public space.
Pudding Mill Introductory Flip-Book | Summer 2016
20
PUDDING MILL KEY ASPIRATIONS
The masterplan seeks to deliver the following:
• A new residential neighbourhood that provides a range of housing to meet local need
• A new Local Centre providing flexible employment floorspace, retail units and community facilities
• A high-quality environment comprising a variety of building uses and typologies
• A place that will engage with its immediate context in terms of form and character
• Taller buildings that are located to signify key locations or relationships within the masterplan, such as the arrival at Pudding Mill DLR or proximity with Stratford High Street
• A wide range of public open spaces, including play provision for all ages
• Improved pedestrian and cycle connectivity within the site, as well as new links to the Park and Stratford High Street
Pudding Mill Introductory Flip-Book | Summer 2016
21
Illustrative Visualisation: City Mill Passage
Pudding Mill Introductory Flip-Book | Summer 2016
22
EMERGING ILLUSTRATIVE MASTERPLAN
Overview of Key ComponentsA VIBRANT LOCAL CENTRE
• Create a vibrant Local Centre at the heart of Pudding Mill
• Provide flexible employment floorspace, retail units and various community facilities
• Create a new pedestrian East-West Street that will improve connections across the site to adjoining developments
A DIVERSE RESIDENTIAL NEIGHBOURHOOD
• A network of close, intimate streets and shared spaces connecting a series of distinct public spaces with larger more formal blocks dissected by mews streets and passages.
• A diversity of typologies, from mews houses, to stacked maisonette, to mansion blocks to residential towers.
• At Bridgewater, a series of stacked maisonettes front the Greenway and the waters edge, whilst apartment blocks create an informal relationship to the allotments.
• Locate taller buildings to signify key locations or relationships within the masterplan, such as the arrival at Pudding Mill DLR or proximity with Stratford High Street
PUBLIC OPEN SPACES AND PLAY AREAS
• Provide a series of public squares and play spaces within the masterplan that will create an enjoyable place to live and work
Pudding Mill Introductory Flip-Book | Summer 2016
23
2
413
7
8
9
10
11
9
9
5
3
1
12
1 Allotments
New
Existing
2 Bridgewater Square and connection to Greenway
3 Stratford High Street
4 Station Square
5 Pudding Mill Square
6 East - West Street
10 Bow Back Square
7 Residential blocks
11 Railway
8 Mews
12 UCL East
9 Towpath
13 City Mill Yard
6
Local Centre
Improved Connectivity
Pudding Mill Lane Station
The Greenway
WARTON ROAD
WATERW
OR
KS R
IVER
STRA
TFORD
HIG
H S
TREE
T
CITY MILL RIVER
PUD
DIN
G MILL LA
NE
EAST
- W
EST
STRE
ET
BOW
BACK
RIVE
R
Pudding Mill Introductory Flip-Book | Summer 2016
24
A VIBRANT LOCAL CENTRE
KEY FEATURES
• Creation of a new square adjacent to Pudding Mill DLR comprising soft and hard landscaping elements will be a significant point of arrival linking the heart of the new development to the DLR station and the wider area
• Creation of new employment spaces around Pudding Mill Lane DLR Station will add vibrancy and vitality within the Local Centre and support Marshgate Lane as a new local high street
• Retail and leisure uses will be located principally around the station
• Some community facilities will also be located in the Local Centre around neighbourhood open spaces and the East-West Street
• Frontages will have active ground floor uses to help encourage movement towards Marshgate Lane
Pudding Mill Introductory Flip-Book | Summer 2016
25
Ground Floor Use Plan
WARTON ROAD
WATERW
OR
KS R
IVER
STRA
TFORD
HIG
H S
TREE
T
CITY MILL RIVER
PUD
DIN
G MILL LA
NE
BOW BACK SQUARE
BRIDGEWATER GREEN
MARSHGATE LANE SQUARE
PUDDING MILL SQUARE
BOW
BACK
RIVE
R
Pudding Mill Introductory Flip-Book | Summer 2016
26
Pudding Mill Square Marshgate Lane Yard
ILLUSTRATIVE VISUALISATIONS
Pudding Mill Introductory Flip-Book | Summer 2016
27
1. Workspace 2. Local Retail
3. High Density Residential 4. Community Facilities
PRECEDENT IMAGES
Pudding Mill Introductory Flip-Book | Summer 2016
28
KEY FEATURES
• To support a diverse residential neighbourhood the masterplan is comprised of a network of close, intimate streets and shared spaces connecting a series of distinct public spaces with larger more formal blocks dissected by mews streets and passages.
• One of the key aspects of the landscape strategy is to ensure integration between the new neighbourhood and its adjacent key routes and sites through shared public open spaces or ‘neighbourhood places’
A DIVERSE RESIDENTIAL NEIGHBOURHOOD
STRA
TFORD
HIG
H S
TREE
T
WARTON ROAD
ALLOTMENTS
GREENWAY
UCL EAST
BOW
BACK
RIVE
R
CITY MILL RIVER
WA
TERW
OR
KS R
IVER
Residential Typologies Plan
4
4
2
3
Bridgewater
Pudding Mill
1
Dual Aspect Residential Block
Single Aspect Residential Block
Stacked Maisonettes
Mews
Sheltered Housing
Townhouses
Pudding Mill Lane Station
Taller Buildings
Pudding Mill Introductory Flip-Book | Summer 2016
29
• A diversity of typologies, from mews houses, to stacked maisonette, to mansion blocks to residential towers.
Mews House1 Terraced House2
Perimeter Block3 Hybrid Block4
Pudding Mill Introductory Flip-Book | Summer 2016
30
• In order to create a successful urban neighbourhood with a sense of intimacy and intensity, a 6-storey datum has been established across the site.
• Key moments have then been reinforced by taller context sensitive elements, which provide landmarks to improve legibility within the site.
Building Heights
Pudding Mill Introductory Flip-Book | Summer 2016
31
Scale and Massing
Pudding Mill Site
Stratford High Street
UCL East
Warton Road
43
27 20
2027
23
Heights (in storeys)
Pudding Mill Introductory Flip-Book | Summer 2016
32
1. Mews 2. Terraces
3. Perimeter Block 4. Hybrid Block
PRECEDENT IMAGES
Pudding Mill Introductory Flip-Book | Summer 2016
33
Pudding Mill Introductory Flip-Book | Summer 2016
34
PUBLIC OPEN SPACE AND PLAY AREAS
KEY FEATURES
• Each public space within the masterplan responds directly to its immediate context and is connected through a variety of streets and shared spaces
• Pudding Mill Square has an urban character in response to its location within the Local Centre.
• Marshgate Yard is informal, working and robust due to its enclosure by employment and housing.
• Bow Back Green is more relaxed, green and playful, articulating a widening in the river and benefiting from its southerly orientation.
• Bridgwater Green is more domestic in scale, providing a moment of rest along the Greenway.
• Play space provision will offer a range of leisure and recreation opportunities for users of all ages.
STRA
TFORD
HIG
H S
TREE
T
BARB
ER R
OAD
BOW
BACK
RIVE
R
CITY MILL RIVER
WA
TERW
OR
KS R
IVER
Bow Back Green
Marshgate Lane Square
Marshgate yard
Bridgewater GreenPudding Mill Square
Pudding Mill Lane Station
Allotments
Greenway
P
P
P
P
Public Open Spaces and Play Areas
Indicative Local PlayP
PP
PP
P
P
Pudding Mill Introductory Flip-Book | Summer 2016
35
Bow Back Green Visualisation - Board 6
Illustrative Visualisation: Bow Back Green
Indicative Local Play
Pudding Mill Introductory Flip-Book | Summer 2016
36
Illustrative Visualisation: Marshgate Lane Square
Pudding Mill Introductory Flip-Book | Summer 2016
37
1. River Bank Planting 2. Play space
3. Public Squares 4. Landscaped Areas
PRECEDENT IMAGES
Pudding Mill Introductory Flip-Book | Summer 2016
38
Pudding Mill Introductory Flip-Book | Summer 2016
39
SUMMER 2016
To ask any questions or to let us know you would like to recieve future updates, please contact the Pudding Mill team at Fluid on:
020 7729 0770
Fluid148 Curtain RoadLondonEC2A 3AT
You can also keep up to date on the web by visiting:
FIND OUT MORE
Queen Elizabeth Olympic Park websitehttp://queenelizabetholympicpark.co.uk/the-park/homes-and-living/pudding-mill