Public Works EVANSTON September 15, 2014 Fountain Square Renovation Project Suzette Robinson Director of Public Works
10

Public Works EVANSTON September 15, 2014 Fountain Square Renovation Project Suzette Robinson Director of Public Works.

Dec 17, 2015

Download

Documents

Kristin Terry
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Public Works EVANSTON September 15, 2014 Fountain Square Renovation Project Suzette Robinson Director of Public Works.

Public Works

EVANSTON

September 15, 2014

Fountain Square Renovation Project

Suzette RobinsonDirector of Public Works

Page 2: Public Works EVANSTON September 15, 2014 Fountain Square Renovation Project Suzette Robinson Director of Public Works.

Public Works

AGENDA

•Site Background

•Site Condition

•Proposed Project

•Proposed Schedule

•Fall Visioning

Page 3: Public Works EVANSTON September 15, 2014 Fountain Square Renovation Project Suzette Robinson Director of Public Works.

Public Works

SITE BACKGROUND

• Historical Significance-Center of Downtown since 1854-Dedicated as Fountain Square in

1876-Original City Hall Site-War Memorial in 1949-Current Fountain Constructed

During the Bicentennial 1976

Fountain Square, circa 1930

Fountain Square veterans’ memorial, circa 1949

Page 4: Public Works EVANSTON September 15, 2014 Fountain Square Renovation Project Suzette Robinson Director of Public Works.

Public Works

SITE BACKGROUND

• Ceremonial Significance-Memorial Day Service -Veteran’s Day Service

Page 5: Public Works EVANSTON September 15, 2014 Fountain Square Renovation Project Suzette Robinson Director of Public Works.

Public Works

SITE BACKGROUND

• Public Square-Celebrations-Festivals-Public Forum -Casual Plaza

Page 6: Public Works EVANSTON September 15, 2014 Fountain Square Renovation Project Suzette Robinson Director of Public Works.

Public Works

SITE CONDITION• Failing Infrastructure

-Basins / walls deteriorating and leaking

-Feature pump failing-Frequency drive removed-Anemometer location

ineffective-Lighting inoperable-Seating and pavement

deteriorated-Highest maintenance

requirements of all City fountains

Poor drainage

Failing pumping system

Page 7: Public Works EVANSTON September 15, 2014 Fountain Square Renovation Project Suzette Robinson Director of Public Works.

Public Works

SITE CONDITION• Usability and Configuration

-Accessibility-Separation of Ceremonial and Casual

Activities-Pedestrian Flow-Aesthetics-Lighting-Restricted Capacity-Uncomfortable

Page 8: Public Works EVANSTON September 15, 2014 Fountain Square Renovation Project Suzette Robinson Director of Public Works.

Public Works

PROPOSED PROJECT• Project Scope

-Limits: Sherman Avenue Church to Davis-Improve fountain, streetscape and roadway

• Project Goals-Improve user experience -Reduce automobile dominance-Separate ceremonial and casual activities-Create a flexible environment suitable for year round use

• Project Funding-Visioning and Design $300,000 (TIF)-Construction $2.3 million (TIF)

Page 9: Public Works EVANSTON September 15, 2014 Fountain Square Renovation Project Suzette Robinson Director of Public Works.

Public Works

PROPOSED SCHEDULE

•Project Manager – Stefanie Levine

• Fall 2014 Visioning – Teska Associates

•Design – RFP 2015

•Construction – 2016

Page 10: Public Works EVANSTON September 15, 2014 Fountain Square Renovation Project Suzette Robinson Director of Public Works.

Public Works

FALL VISIONING-Engage public to develop at

least three concepts of the space -Consult with Veteran groups,

downtown businesses, residents and other users

-Conduct a 3 to 5-day street closure in October for visioning activitiesi. Red Carpet Fashion Show

ii. Coloring contest

iii. Restaurant sampling

iv. Expanded seating and bike parking area