PUBLIC SERVICE COMPANY OF NE W MEXICO ELECT RIG SERVICES ORIGiNAL RIDER NO.23 FULL AND PURCHASED POWER COST ADJUSTMENT CLAUSE ( FPP AC 3 APDLICABLE TO RETAIL ENE RGY RATE SCHEDULES PAGE 1 OF 2 EXPLANATION OL RjDER. Pursuant to tLe Ne w Me x co Pub c Regu’ation Commission s tNMPRC) Fir a Order r NMPRC Case No 080O273UT, PubI c Service Company of Ne w Mexco ( PNM” o the C om pa ry s an toned t continue u e of a Fuel and Purchasec Power Co t Adjustr out Clause (‘FPPCAC 3 to recover from ts retal ustom s nceases or ref ird decreases in ts fuel and purchased power costs abose or below a base fuel cost per kW h APPLICABILITY The FPPCAC Factors ci fcrer tiated by Service Cat gory apply to all ilowatt aurs kW h 3 consumed by c storre s tarng retal servce u den PNMs Retail Er orgy Rate Schedules I sted below and w Il app a r on the customer a montL ly bill ‘s a iine itm calcu ated on all kW h of deiivered energy Serve Catepry ppjable Rate Scheduks Secondary 1 A Resident al 1 B Residential TO U 2A Small Power 2B Small TOU 3B General Power TQ U 3C General Power TOU (Low Load Factor) 6 Private Area Ligntinq Schedule 6 1OA Irrigation Schedule 1OA lOB Irrigation TOU 20 Streethghting Primary 4B Large Power TOU 11 B W a t er a nd Sewage Pumping TOU Substatior 17B Industrial Power TOU (12 5 kV 8M W M n) 30B Industrial Power TO U (12 5 kV, 30MW Mm 3 S ub T ra r smission 56 lnducinal Power TOU (Mines 34 5 48 115 kV ) Transmission 14B Industrial Power TOU (M nes 115 k J) ISB I dust nial Power TOU (Universit as 115 kV DURATION fle FPPCAC sLai reain in effect until terminated tythe Comm ssor PN M s a make a continuation f ing no later ta n twc years f om the date of approval of the FPPCAC by tEe Comm as on oursuam to NMPRC Rule 550 18 EFFECI1VF Advice Notce No 372 Ge rdTOz D ncctor RegulaLory Pplicy & Case Ma oe i en # 8 5
2

Public-Service-Co-of-NM-Fuel-and-purchased-power-cost-adjustment-clause-("FPPCAC")-applicable-to-retail-energy-rate-schedules

Apr 09, 2018

Download

Documents

Genability
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Public-Service-Co-of-NM-Fuel-and-purchased-power-cost-adjustment-clause-("FPPCAC")-applicable-to-retail-energy-rate-schedules

8/7/2019 Public-Service-Co-of-NM-Fuel-and-purchased-power-cost-adjustment-clause-("FPPCAC")-applicable-to-retail-energy-rate-schedules

http://slidepdf.com/reader/full/public-service-co-of-nm-fuel-and-purchased-power-cost-adjustment-clause-fppcac-applicable-to-retail-energy-rate-schedules 1/2

PUBLIC SERVICE COMPANY OF NEW MEXICO

ELECT RIG SERVICES

ORIGiNAL RIDER NO.23

FULL AND PURCHASED POWER COST ADJUSTMENT CLAUSE ( FPP AC 3APDLICABLE

TO RETAIL ENE RGY RATE SCHEDULES

PAGE 1 OF 2

EXPLANATION OL RjDER. Pursuant to tLe New Mex co Pub c Regu’ation Commission s

tNMPRC) Fir a Order r NMPRC Case No 080O273UT, PubI c Service Company of NewMexco ( PNM” o the Compary s an toned t continue u e of a Fuel and Purchasec PowerCo t Adjustr out Clause (‘FPPCAC 3 to recover from ts retal ustom s nceases or ref irddecreases in ts fuel and purchased power costs abose or below a base fuel cost per kWh

APPLICABILITY The FPPCAC Factors ci fcrer tiated by Service Cat gory apply to all ilowatt

aurs kWh 3 consumed by c storre s tarng retal servce u den PNMs Retail Er orgy Rate

Schedules I sted below and w Il app ar on the customer a montL ly bill ‘s a iine itm calcu ated onall kWh of deiivered energy

Serve Catepry ppjable Rate Scheduks

Secondary 1 A - Resident al

1 B Residential TOU

2A Small Power2B - Small Power TOU3B General Power TQU

3C General Power TOU (Low Load Factor)6 Private Area Ligntinq Schedule 6

1OA Irrigation Schedule 1OA

lOB Irrigation TOU

20 Streethghting

Primary 4B Large Power TOU

11 B Water and Sewage Pumping TOU

Substatior 17B Industrial Power TOU (12 5 kV 8MW M n)

30B Industrial Power TOU (12 5 kV, 30MW Mm 3

Sub Trar smission 56 lnducinal Power TOU (Mines 34 5 48 115 kV)

Transmission 14B Industrial Power TOU (M nes 115 k J)ISB I dustnial Power TOU (Universit as 115 kV

DURATION fle FPPCAC sLai reain in effect until terminated tythe Comm ssor PNM s amake a continuation f ing no later tan twc years f om the date of approval of the FPPCAC by tEeComm as on oursuam to NMPRC Rule 550 18

EFFECI1VFAdvice Notce No 372

Ge r dTOz

D ncctor RegulaLory Pplicy & Case Ma oe i en# 8 5

Page 2: Public-Service-Co-of-NM-Fuel-and-purchased-power-cost-adjustment-clause-("FPPCAC")-applicable-to-retail-energy-rate-schedules

8/7/2019 Public-Service-Co-of-NM-Fuel-and-purchased-power-cost-adjustment-clause-("FPPCAC")-applicable-to-retail-energy-rate-schedules

http://slidepdf.com/reader/full/public-service-co-of-nm-fuel-and-purchased-power-cost-adjustment-clause-fppcac-applicable-to-retail-energy-rate-schedules 2/2

PUBUC SERVICE COMPANY OF NE W MEXICO

ELECTRIC SERVICES

ORIGINAL RIDER NO . 23

FUEL AND PURCHASED PCV’ER COST ADJUSTMENT CLAUSE ( FOPCAC ) PPLTCABLE

TO RETAIL ENERGY RATE SCHEDULES

PAGE2 OF 2

RATE ADJUSTMENT PROVISONS

The FPPCAC fu& %ctor shai be set annuaU’ beginr”ng Ju’. 2010

The cost elements that will be recovered through the FPPCAC shall nclude the following

FERC Accounts 501 0 Coal, 501 2 Natural Gas Purchases; 501 4 Oil Consumption, 518 0

Nuclear 547 0 Gas Purchases, 555 0 Purchased Power, 805 0 Gas Imbalance, 447 0

Sales for Resale (One hundred percent (100%) of off-system sales margins shall be

credited to customers)

a) The annual FPPCAC fuel factor shal be calculated as follows’

) Projected FPPCAC cost elements for the 12 months July through June plus the

over’under balance of FPPCAC costs tnrougn the end of each AprI. dvidea oi the

proJected kWh sales for the same 1 2-month period equas tne new pro1ected base

fuel cost.

ii) The difference between the current base fuel rate and the new projected base fuelcost calculated in (i). above, equals the FPPCAC fuel factor

i) Loss factors shall be appled to derve the FPPCAC fuel factors at the fc’owing

voltage levels

Loss Factors

Secondary Voltage 1 005971

Primary Voltage 0 990002Substation Voltage 0 978311Sub Transmission Voltage 0 970643

Transmission Voltage 0 968938

b) The differences between PNM’s fuel and purchased power costs and recoveries are

placed in a balancing account Monthly carrying costs on any under-recovered balanceat the end of the month shall be calculated by multiplying the balance by the weighted

average cost of debt approved n Case No 07-00077-UT of 3 02’ b Monthly carryingcosts on any over-recovered balance at the end of the montn shall be calculated bymjtipynq tue balance by the ore-tax WACO auproved ri Case No 07-00077-UT of11 66

,PN M :‘d Sic mo’tr an n ara renorts as reaucec nyRu:e 550 4

rrTp’FAdce Notice No 372

/

//i7/ /

REPLACED BY NMPRC dtO”