Treloggan | A New Living and Commercial Quarter for Newquay PUBLIC CONSULTATION 1 Modena Lifestyles NEWQUAY Treloggan Trencreek Hendra Nansledan The Goldings Proposal Site Proposal site and surrounding urban areas Welcome Thank you for visiting this public consultation about our proposals for a new living and working quarter in the Treloggan-Trencreek area of Newquay. This public consultation event runs from 3rd February to 17th February . In June 2019, Modena Lifestyles Ltd opened a Planning Performance Agreement with Cornwall Council to assist outline proposals for a residential led mixed-use development on the proposal site between Treloggan and Trencreek. Since this time, discussions have been ongoing with Cornwall Council and various consultees, stakeholders and consultants in respect of bringing forward the proposed development. We would now like to hear your views on what is being proposed. Our plans are designed to create a new Living and Working Quarter for Newquay which will include: • New homes including Affordable Housing • New employment opportunities with proposed commercial/office space • New shops • New Public House/Restaurant • New play park • Retention and enhancement of site ecology • Highways Improvements around Treloggan and Trencreek • New Pedestrian/Cycle Links Please share your thoughts on the plans with us by emailing: [email protected]All comments will be considered and will have the potential to influence the design as it evolves, prior to the submission of the planning application. About the Project Team: Axis is an award-winning planning and environmental consultancy providing multi- disciplinary support on major infrastructure development projects and strategic planning studies across the UK. Modena Lifestyles Ltd are an established development company which specialises in the delivery of residential projects. CAD Architects are a RIBA Chartered Architectural Practice with experience in the design and delivery of development projects across Cornwall and the UK. Modena Lifestyles
9
Embed
PU NSUTAN Treloggan A ew Living and Commercial uarter for ...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Treloggan | A New Living and Commercial Quarter for NewquayPUBLIC CONSULTATION
1
ModenaLifestyles
NEWQUAY
Treloggan
Trencreek
Hendra
Nansledan
The Goldings
Proposal Site
Proposal site and surrounding urban areas
WelcomeThank you for visiting this public consultation about our proposals for a new living and working quarter in the Treloggan-Trencreek area of Newquay. This public consultation event runs from 3rd February to 17th February.
In June 2019, Modena Lifestyles Ltd opened a Planning Performance Agreement with Cornwall Council to assist outline proposals for a residential led mixed-use development on the proposal site between Treloggan and Trencreek. Since this time, discussions have been ongoing with Cornwall Council and various consultees, stakeholders and consultants in respect of bringing forward the proposed development. We would now like to hear your views on what is being proposed.
Our plans are designed to create a new Living and Working Quarter for Newquay which will include:
• New homes including Affordable Housing• New employment opportunities with proposed commercial/office space• New shops• New Public House/Restaurant• New play park• Retention and enhancement of site ecology• Highways Improvements around Treloggan and Trencreek• New Pedestrian/Cycle Links
Please share your thoughts on the plans with us by emailing: [email protected] All comments will be considered and will have the potential to influence the design as it evolves, prior to the submission of the planning application.
About the Project Team:
Axis is an award-winning planning and environmental consultancy providing multi-disciplinary support on major infrastructure development projects and strategic planning studies across the UK.
Modena Lifestyles Ltd are an established development company which specialises in the delivery of residential projects.
CAD Architects are a RIBA Chartered Architectural Practice with experience in the design and delivery of development projects across Cornwall and the UK.
ModenaLifestyles
Treloggan | A New Living and Commercial Quarter for NewquayPUBLIC CONSULTATION
2
ModenaLifestyles
Proposal Site
New
quay
St
rate
gic
Rout
e
NansledanNewquay Growth Area
Development to Southern edge
of NewquayWater Level
Road Sign
LP
LP
Stay
Road Sign
IC49.524
IC45.942
Road Sign
MkrFH
IC
IC44.788
Road Sign
Road Sign
Road Sign
IC42.417
IC
45.112
IC44.956
IC44.896
Road Sign
Road Sign
Road Sign
Sign
Sign
IC
Road Sign
IC
IC
48.549
48.510
Road Sign
Road Sign
Road Sign
BT
IC40.034
IC40.314
Mkr
IC49.021
Boll
Boll
Boll
Boll
Boll
Boll
Boll
Boll
Boll
Boll
Sinks
TCB
50.6m
49.1m
+45.75
+44.45
+45.00
+46.90
+47.50
+48.80
+51.40
+47.75
+44.00
+45.00
+49.04
+47.75
+50.84
+51.00
+50.50
+50.00
+47.20
+47.00
+46.50
+42.00
+47.05
+47.25
+47.25
+46.00
+47.75
+47.25
+47.75
+47.00
+47.00
+47.25
+47.25
+47.70
+46.75
+46.30
+46.00
+45.50
+45.00
+44.50
+46.15
+48.51
+45.60
+46.50
+45.00
+47.40
+51.07
+51.34
+50.01
+42.71
+45.65
+47.7510m5m
015m
20m
ISS
UE
D FO
R P
LAN
NIN
G15.8.11
OB
AR
EV
DR
ND
ATE
RE
VIS
ION
S
LIST O
F INFO
RM
AN
TS :
arrD
RA
WN
BY
This drawing should not be scaled.
All dim
ensions are in mm
unless otherwise stated.
If this drawing form
s part of an application for planning permission on behalf of
the applicant named below
, it shall not be used for any other purpose without the
express permission of M
ountford Pigott LLP
.
This drawing m
ay incorporate information from
other professionals. Mountford
Pigott LLP
cannot accept responsibility for the integrity and accuracy of suchinform
ation. Any clarification and/or additions that are required appertaining to
such information should be sought from
the relevant profession or theirappointm
ent representative as listed below.
OR
DN
AN
CE
SU
RV
EY
TOP
OG
RA
PH
ICA
L SU
RV
EY
- PLA
N-IT G
EO
MA
TICS
PA
RTR
IDG
E A
SS
OC
IATE
S LA
ND
SC
AP
E LA
YO
UT
RE
TAIL
UN
IT 5
TUR
NIN
G
SE
RV
ICE
YA
RD
EM
PLO
YM
EN
TU
NIT A
NE
W JU
NC
TION
&A
CC
ES
S R
OA
D TO
HIG
HW
AY
EN
G. D
ES
IGN
200 CA
R P
AR
KIN
G S
PA
CE
SIN
CLU
DIN
G 11 D
ISA
BLE
D
North
H.01
H.02
H.03
H.04
H.05
H.06
H.07
H.08
H.09
H.10
H.11
H.12
H.13
H.14
H.15
H.16
H.17
H.18
H.19
H.20
H.21
H.22
H.23
H.24
H.25
H.40
H.26
H.27
H.28
H.29 H
.30 H.31
H.32 H
.33 H.34
H.35 H
.36
H.37
H.38
H.39
H.41
VV
H.46
H.45
H.44 H
.43
H.42
PU
BLIC
OP
EN
SP
AC
Esubject to detail design &
agreement
AR
EA
EX
CLU
DE
D FR
OM
PLA
NN
ING
AP
PLIC
ATIO
N S
ITE
GAN
NEL VIEW
CLO
SE
A392
TRELOG
GAN RO
AD
MO
RR
ISO
NS
HO
NE
YW
ELL H
OLT LLO
YD
KIN
GS
HE
AD
PU
BLIC
HO
US
E
RE
TAIL
UN
IT1 & 2
RE
TAIL
UN
IT 4
RE
TAIL
UN
IT 6RE
TAIL
UN
IT 7
EM
PLO
YM
EN
TU
NIT B
SE
RV
ICE
YA
RD
GARDEN CENTRE
RE
TAIL
UN
IT 3
CO
RN
ISH
HE
DG
E (1.5m
HIG
H)
EN
TRA
NC
EC
AN
OP
Y O
VE
R
2-BE
DR
OO
M 3-P
ER
SO
N H
OU
SE
TYP
E 1
4-BE
DR
OO
M 6-P
ER
SO
N H
OU
SE
TYP
E 4
2-BE
DR
OO
M 4-P
ER
SO
N H
OU
SE
TYP
E 2
3-BE
DR
OO
M 5-P
ER
SO
N H
OU
SE
TYP
E 3
50.5050.50
48.00
47.50
46.50
46.50
46.00
46.00
45.50
45.50
45.00
44.50
44.00
43.50
43.50
48.50
42.00
41.5041.50
41.50
41.0041.00 42.50
42.50
43.00
43.00
43.50
44.50
45.00
44.7544.75
45.7045.70
45.7045.70
46.00 46.50
46.50 47.00
48.00 48.00
49.00
49.00
EX
TEN
T OF A
DO
PTA
BLE
RO
AD
SH
OW
N H
ATC
HE
D
3-BE
DR
OO
M 6-P
ER
SO
N H
OU
SE
- GA
RA
GE
4-BE
DR
OO
M 6-P
ER
SO
N H
OU
SE
- DB
LE G
AR
AG
E
01
0203
04
0506
07
08
09
10
11
1213
14
15
16
17
1819
20
2122
23
24
2526
2728
29
30
3132
33
34
35
36
37
38
39
LAN
DS
CA
PIN
G IS
NO
T SH
OW
N O
N TH
ISD
RA
WIN
G, S
EE
PA
RTR
IDG
E A
SS
OC
IATE
SD
RA
WIN
G A
ND
0666-P30 FO
R D
ETA
ILS
40
41
42
BINS
MO
E. &
LOA
DIN
G
MO
E. &
LOA
DIN
G
MO
E. &
LOA
DIN
G
MO
E. &
LOA
DIN
G
MO
E. &
LOA
DIN
GMO
E. &
LOA
DIN
G
CYCLE
LOCKERS
BINSCYCLE
LOCKERS
BINSCYCLE
LOCKERS
BINSCYCLE
LOCKERS
LP
CYCLE
LOCKERSBINS
CYCLE LO
CKER
S
SLIDIN
G G
ATE AND PED
ESTRIAN G
ATE
LAN
D R
ETA
INE
D FO
R FU
TUR
EE
MP
LOY
ME
NT U
SE
(EX
CLU
DE
DFR
OM
RM
AP
PLIC
ATIO
N)
ELE
CTR
ICA
LS
UB
STA
TION
IN G
RP
HO
US
ING
LOC
KA
BLE
BO
LLAR
DS
AC
CE
SS
TO FU
TUR
ED
EV
ELO
PM
EN
T SITE N
EW
1.5m H
IGH
CO
RN
ISH
HE
DG
E
CO
NC
RE
TER
ETA
ININ
G W
ALL
WITH
RA
ILING
SC
ON
CR
ETE
RE
TAIN
ING
WA
LLW
ITH R
AILIN
GS
NE
W 1.5m
HIG
HC
OR
NIS
H H
ED
GE
RE
TAIL P
AR
K S
IGN
RA
MP
AT 1:20
CYCLES
CYC
LES
CYCLES
CYCLES
OP
EN
ING
THR
OU
GH
CO
RN
ISH
HE
DG
E TO
CO
NN
EC
T FOO
TPA
THS
EX
ISTIN
GC
OR
NIS
HH
ED
GE
RE
TAIL P
AR
KS
IGN
AG
EFE
ATU
RE
OV
ER
PE
RM
AC
RIB
RE
TAIN
ING
WA
LL -V
AR
YIN
G H
EIG
HTS
TOS
UIT G
RO
UN
D LE
VE
LS
ME
CH
AN
ICA
L PLA
NT/
CA
NO
PY
AB
OV
E
PE
RM
AC
RIB
RE
TAIN
ING
WA
LL -V
AR
YIN
G H
EIG
HTS
TOS
UIT G
RO
UN
D LE
VE
LS
1m H
IGH
BO
LLAR
DS
3-BE
DR
OO
M 5-P
ER
SO
N H
OU
SE
TYP
E 7
PR
OP
OS
ED
LEV
ELS
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LPLP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LAM
P P
OS
T (LOC
ATIO
N A
ND
STY
LE S
UB
JEC
T TOILLU
MIN
ATIO
N D
ES
IGN
)
EN
TRA
NC
EC
AN
OP
Y O
VE
R
SH
EFFIE
LD C
YC
LE H
OO
PS
BO
LLAR
DS
CO
NC
RE
TER
ETA
ININ
G W
ALL
WITH
RA
ILING
S
LP
LPLP
48.89
47.79
48.00
48.45
47.00
46.7546.75
46.00
46.2546.25
45.75
45.50
45.5045.50
45.25
45.00
44.25
44.2544.00
43.75
43.5043.25 43.75
43.00
41.7542.00
50.08
50.91
17A
EX
ISTIN
GC
OR
NIS
HH
ED
GE
BO
UN
DA
RY
CO
ND
ITION
S:
STE
PP
ED
RA
MP
FOO
TPA
TH
PA
LISA
DE
FEN
CE
2.5m H
IGH
OFFS
ET FE
NC
E TO
PR
EV
EN
TM
OTO
RC
YC
LE A
CC
ES
S
LEV
ELS
AM
EN
DE
D H
.18 - H.25
30.8.11A
RR
B
44.75
43.50
PO
S R
ELO
CA
TED
, HO
US
ING
LAY
OU
T AM
EN
DE
D&
UN
ITS R
EN
UM
BE
RE
D01.10.12
AR
RC
H.15 E
NTR
AN
CE
PO
SITIO
N C
OR
RE
CTE
D21.01.13
AR
RD
PLA
N U
PD
ATE
17.09.14O
BE
44.00
RE
SI LA
YO
UT A
ME
ND
ED
TO A
VO
ID S
EW
ER
3.12.14A
RR
FD
RA
IN R
UN
SH
OW
N11.12.14
NH
GD
RA
IN R
UN
HID
DE
N, S
UB
STA
TION
MO
VE
D18.12.14
NH
H
Wat
er L
evel
Roa
d S
ign
LP
LP
Sta
y
Roa
d S
ign
IC 49.5
24
IC 45.9
42
Roa
d S
ign
Mkr
FH
IC
IC 44.7
88
Roa
d S
ign
Roa
d S
ign
Roa
d S
ign
IC 42.4
17
IC
45.1
12
IC 44.9
56
IC 44.8
96
Roa
d S
ign
Roa
d S
ign
Roa
d S
ign
Sig
n
Sig
n
IC
Roa
d S
ign
IC
IC
48.5
49
48.5
10
Roa
d S
ign
Roa
d S
ign
Roa
d S
ign
BT
IC 40.0
34
IC 40.3
14
Mkr
IC 49.0
21
Bol
l
Bol
l
Bol
l
Bol
l
Bol
l
Bol
l
Bol
l
Bol
l
Bol
l
Bol
l
Sin
ks
TCB
50.6
m
49.1
m
+45.75
+44.45
+45.00
+46.90
+47.50
+48.80
+51.40
+47.75
+44.00
+45.00
+49.04
+47.75
+50.84
+51.00
+50.50
+50.00
+47.20
+47.00
+46.50
+42.00
+47.05
+47.25
+47.25
+46.00
+47.75
+47.25
+47.75
+47.00
+47.00
+47.25
+47.25
+47.70
+46.75
+46.30
+46.00
+45.50
+45.00
+44.50
+46.15
+48.51
+45.60
+46.50
+45.00
+47.40
+51.07
+51.34
+50.01
+42.71
+45.65
+47.75
10m5m0 15m 20m
ISSUED FOR PLANNING 15.8.11 OB AREVDRNDATEREVISIONS
LIST OF INFORMANTS :
arrDRAWN BY
This drawing should not be scaled.
All dimensions are in mm unless otherwise stated.
If this drawing forms part of an application for planning permission on behalf ofthe applicant named below, it shall not be used for any other purpose without theexpress permission of Mountford Pigott LLP.
This drawing may incorporate information from other professionals. MountfordPigott LLP cannot accept responsibility for the integrity and accuracy of suchinformation. Any clarification and/or additions that are required appertaining tosuch information should be sought from the relevant profession or theirappointment representative as listed below.
LAMP POST (LOCATION AND STYLE SUBJECT TOILLUMINATION DESIGN)
ENTRANCECANOPY OVER
SHEFFIELD CYCLE HOOPS
BOLLARDS
CONCRETERETAINING WALLWITH RAILINGS
LP
LPLP
48.89
47.79
48.00
48.45
47.00
46.7546.75
46.00
46.2546.25
45.75
45.50
45.5045.50
45.25
45.00
44.25
44.25
44.00
43.75
43.5043.25
43.75
43.00
41.7542.00
50.08
50.91
17A
EXISTINGCORNISHHEDGE
BOUNDARY CONDITIONS:
STEPPED RAMPFOOTPATH
PALISADE FENCE2.5m HIGH
OFFSET FENCE TO PREVENTMOTORCYCLE ACCESS
LEVELS AMENDED H.18 - H.25 30.8.11 ARR B
44.75
43.50
POS RELOCATED, HOUSING LAYOUT AMENDED& UNITS RENUMBERED
01.10.12 ARR C
H.15 ENTRANCE POSITION CORRECTED 21.01.13 ARR DPLAN UPDATE 17.09.14 OB E
44.00
RESI LAYOUT AMENDED TO AVOID SEWER 3.12.14 ARR FDRAIN RUN SHOWN 11.12.14 NH GDRAIN RUN HIDDEN, SUBSTATION MOVED 18.12.14 NH H
Planning ContextThe image to the right shows recent residential planning approvals around the Newquay Area. Against this backdrop, our proposal site is shown to be a large pocket of undeveloped land surrounded by existing and proposed development to the East and South West. The Goldings development to the South has largely been completed.
To the East of the site, the proposed Nansledan development is ongoing and next phases include the completion of the Newquay Strategic Route which will link Henver Road to the A392. These proposals include a new railway bridge which facilitates the closure of the level crossing at Trencreek, to the north of our proposal site.
A previous planning approval was granted in 2014 on the proposal site for a mixed-use development including houses and large-scale commercial use. While these proposals did not proceed, they demonstrate the acceptability for a mixed-use development on this site.
Previous 2014 Out l ine Planning Approval Map of Proposal S i te in the context of sur rounding recent planning approvals
Treloggan | A New Living and Commercial Quarter for NewquayPUBLIC CONSULTATION
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
Western Footpa th and Views within s i te looking West Approach Roads around the Proposal S i te
The site currently consists of scrub and pasture contained within a series of 8 fields enclosed by hedgerow. The total site area is 15 acres (6 hectares)
The site has a gradual slope from East to West. The proposal site is bounded by Treloggan Industrial Estate to the West, the A392 and Lane to the South and Trencreek Road and the Newquay Growth Area to the East.
There is existing residential development to the East at Gannel View Close and Mount View, whereas the land to the West is generally industrial or commercial. The Health and Safety Executive require a buffer zone around an industrial storage facility to the West of the site. This buffer zone can be maintained within the proposals and utilised for ecological use.
The impact on the highway needs to be appropriately considered as the A392 is a well-used feeder road into Newquay. There is also a level crossing to the North of the site and the proposed development would need to be managed in such a way to prevent any additional pressure on this intersection.
21
3 4 5 6
6
7
7
8
8
9
9
10
11
11
10
1 2
3
5
Treloggan | A New Living and Commercial Quarter for NewquayPUBLIC CONSULTATION
4
ModenaLifestyles
Nans
leda
n M
aste
rpla
nPr
opos
ed D
evel
opm
ent
FOOTPATH(EXISTING)
FOOTPATH(EXISTING)
PotentialFootpath
HSE BLAST ZONE - INNERZONE OF INFLUENCE
PotentialFootpath
PotentialFootpath
SiteAccess
Potential newjunction arrangement
Potential link toNewquayStrategic Route
Future closure ofLevel Crossing
"Green Route"
Commercial street
Residential Development
EcologicalMitigation
EcologicalMitigation
Ecological planting
Potential to closejunction onto A392with one waysystem
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
This development offers wider opportunities for the local area which are outlined below:
• Placemaking: Creating a new characterful neighbourhood for Newquay
• High quality design, materials and construction• Promoting and Enhancing Site Ecology• Forming a sense of arrival with a strong street frontage
along the A392• Promoting the interconnectivity of the development to the
rest of Newquay
As well as providing new homes, shops and local employment, our proposals also aim to improve the existing highway network around Trencreek and Treloggan with the opportunity to develop:
• New dedicated pedestrian/cycle links• A new link road off the A392 to the planned Newquay
Strategic Route• Highways improvements to the Trencreek Road and A392
junction with reduced traffic and new traffic management• Pedestrian improvements on the Trencreek Road, and• Assist the planned closure of the Level Crossing at Trencreek
with potential access to the NSR
Treloggan | A New Living and Commercial Quarter for NewquayPUBLIC CONSULTATION
5
ModenaLifestyles
AspirationsThe houses and buildings are still to be designed and it is anticipated these will be addressed within a Reserved Matters Application, however a set of principles has been developed for the site which presents the aspirations and ambitions of the proposal scheme. Precedent images are presented (right) which embody aspects which align with the development’s ethos.
Principles for the proposal site include:
• Using locally sourced, high-quality materials which reflect Cornwall’s vernacular
• Applying a hierarchy to streets with corresponding building types to improve legibility
• Developing a Pattern Book to ensure quality of buildings and encourage variety and character
• Promoting the Public Realm with appropriately designed spaces, considered use of materials and planting.
Wider aspirations for the site include:
• Forming an urban edge to Newquay and providing a sense of arrival
• Defining a new character area for this part of Newquay
• Consolidating the existing areas of development• Developing and promoting Community
Resident ial and Landscape Design Precedents
Commercial/Retai l/Of f ice Precedents - Forming an an entrance to the s i te and an act ive s t r eet f rontage along the A392
Render, S la te and Stone - Vernacular Mater ials to be promoted within the proposed development
Treloggan | A New Living and Commercial Quarter for NewquayPUBLIC CONSULTATION
6
ModenaLifestyles
(UN
DER CON
STRUCTIO
N)
PROPOSED DEVELOPMENTAS NANSLEDAN MASTERPLAN
POTENTIALCONNECTION TONEWQUAYSTRATEGICROUTE
HSE Exclusion Zone(Inner)
EXISTINGFOOTPATH
EXISTINGFOOTPATH
EXISTINGFOOTPATH
EXISTINGFOOTPATH
COMMERCIALAREA
RETAINED ANDENHANCED ECOLOGY
RETAINED ANDENHANCED ECOLOGY
Local EquippedArea of Play
ROAD NARROWINGWITH CROSSING.NEW ONE WAY SYSTEM
POTENTIAL ONE WAY SYSTEM.TRAFFIC REDIRECTED FROMSUBSTANDARD JUNCTION TONEWQUAY STRATEGIC ROUTE
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
MasterplanThe proposed Masterplan has been developed with placemaking in mind, which is an approach to urban design that promotes character within a development and encourages positive interactions between people and their environment. To this effect, the following features have been included within the proposals:
• Strong road frontage with terraced buildings facing onto the main link road and parking concealed to the rear of buildings
• Retained and enhanced Ecological Zones as a buffer to the Treloggan Industrial Estate
• Retained Hedgerows• Office and Retail Space located
towards the entrance of the site for accessibility and visual interaction
• Public House/Restaurant positioned as a prominent feature building within the development
• Proposed ‘Green Link’ with planting, ponds and ecological swales running through the site
• Proposed play park in the heart of the site
• ‘Permeability’ of the site with multiple pedestrian and cycle links across the site and externally.
Treloggan | A New Living and Commercial Quarter for NewquayPUBLIC CONSULTATION
7
ModenaLifestyles
The accompanying diagram outlines some of the key features of the proposed development. These can be summarised as:
• Strong pedestrian and vehicle links through the site and formation of off-site connections
• Feature buildings, frontages and landscape areas to introduce character, benefiting place-making and way-finding.
• Creation of a Green Link for the purposes of ecology, water management and general resident well being.
• Formation of an ecological buffer on the western edge of the site.
Sustainability
The intention is to retain and enhance as much of the existing ecology on the proposal site as possible. The proposed buffer zone to the west of the site will be utilised with the retention of trees and existing plants, and will be enhanced through additional planting and management.
The proposed ‘green link’ through the site will included planting and ecological swales/ponds to encourage diversity of wildlife and aid water management.
Buildings will have integrated ecological features such as Bee Bricks, Bat and Bird Boxes with the potential for green roofs.
(UN
DER CON
STRUCTIO
N)
PROPOSED DEVELOPMENTAS NANSLEDAN MASTERPLAN
POTENTIALCONNECTION TONEWQUAYSTRATEGICROUTE
HSE Exclusion Zone(Inner)
EXISTINGFOOTPATH
EXISTINGFOOTPATH
EXISTINGFOOTPATH
EXISTINGFOOTPATH
COMMERCIALAREA
RETAINED ANDENHANCED ECOLOGY
RETAINED ANDENHANCED ECOLOGY
Local EquippedArea of Play
ROAD NARROWINGWITH CROSSING.NEW ONE WAY SYSTEM
POTENTIAL ONE WAY SYSTEM.TRAFFIC REDIRECTED FROMSUBSTANDARD JUNCTION TONEWQUAY STRATEGIC ROUTE
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
Retained Ecological Fea tures and Proposed Enhancements
Treloggan | A New Living and Commercial Quarter for NewquayPUBLIC CONSULTATION
8
ModenaLifestyles
NEW
QU
AY STRATEGIC ROU
TE
(UN
DER CON
STRUCTIO
N)
PROPOSED DEVELOPMENTAS NANSLEDAN MASTERPLAN
POTENTIALCONNECTION TONEWQUAYSTRATEGICROUTE
NEW PEDESTRIANCROSSING POINT
POTENTIAL ONE WAY SYSTEM.TRAFFIC REDIRECTED FROM A392JUNCTION TO NEWQUAY STRATEGICROUTE
SITE ENTRANCE
Tren
cree
k Rd
A392
PHASE 1
PHASE 2
Phase 1 Area to be delivered as initial phase ofproposed development. New junction access ontoTrencreek Road to be formed but temporarilystopped up with emergency access only, until theNewquay Strategic Route (NSR) is complete to avoidadditional vehicle movements on level crossing atTrencreek.
Phase 2 Area to be delivered after completion ofthe NSR with vehicle access to NSR either via directvehicle link through Newquay Growth Area land orvia Trencreek Road once level crossing has beenstopped up. Access from Phase 1 Area ontoTrencreek Road to made.
To Level Crossing(Crossing to be stopped uponce Newquay StrategicRoute is complete)
New junction ontoTrencreek Road formedbut temporarily stoppedup with gate or bollards.Emergency access to beprovided only.
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
Phase 1 Area to be delivered as initial phase of proposeddevelopment. New junction access onto Trencreek Roadto be formed but temporarily stopped up with access toemergency vehicles only until the Newquay StrategicRoute (NSR) is complete to avoid additional vehiclemovements on level crossing at Trencreek.
PHASE 2
Phase 2 Area to be delivered after completion of the NSRwith vehicle access to NSR either via direct vehicle linkthrough Newquay Growth Area land or via TrencreekRoad once level crossing has been stopped up. Accessfrom Phase 1 Area onto Trencreek Road to made.
HIGHWAYS IMPROVEMENT OPPORTUNITIESVehicle movements at junction from Trencreek Road ontoA392 reduced with potential one way system from A392.
Potential one way system on Trencreek Road with roadnarrowing allowing for formation of pedestrian footwayand crossing.
(UN
DER CON
STRUCTIO
N)
PROPOSED DEVELOPMENTAS NANSLEDAN MASTERPLAN
POTENTIALCONNECTION TONEWQUAYSTRATEGICROUTE
HSE Exclusion Zone(Inner)
EXISTINGFOOTPATH
EXISTINGFOOTPATH
EXISTINGFOOTPATH
EXISTINGFOOTPATH
COMMERCIALAREA
RETAINED ANDENHANCED ECOLOGY
RETAINED ANDENHANCED ECOLOGY
Local EquippedArea of Play
ROAD NARROWINGWITH CROSSING.NEW ONE WAY SYSTEM
POTENTIAL ONE WAY SYSTEM.TRAFFIC REDIRECTED FROMSUBSTANDARD JUNCTION TONEWQUAY STRATEGIC ROUTE
THE DESIGN AND LAYOUT IN THIS DRAWING ARE THE COPYRIGHT OF CAD ARCHITECTS LTD. AND MAYNOT BE AMENDED OR ADAPTED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN APPROVAL OF CADARCHITECTS LTD.THE DRAWING IS TO BE USED SOLELY FOR THE INTENDED PURPOSE AND THE ARCHITECT ACCEPTS NORESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ARISING THROUGH UNAUTHORISED USE.CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BEWORKED FROM. TAKE SITE DIMENSIONS FOR ALL FABRICATION WORK. REFER ALL DISCREPANCIES ANDREQUIREMENTS FOR ADDITIONAL INFORMATION TO THE ARCHITECT FOR CLARIFICATION OFINSTRUCTION BEFORE PUTTING WORK IN HAND.
DATEREV DESCRIPTION INS
CAD ARCHITECTS LTDCOURTLEIGH HOUSE, 74-75 LEMON STREET
PhasingTo avoid additional vehicle movements on the Trencreek Level Crossing prior to completion of the Newquay Strategic Route (NSR), a phased approach to the development is proposed.
Phase 1 Area to be delivered as initial phase of proposed development. New junction access onto Trencreek Road to be formed but temporarily stopped up with access to emergency vehicles only until the NSR is complete.
Phase 2 Area to be delivered after completion of the NSR with vehicle access to the NSR either via direct vehicle link through the Newquay Growth Area land or via Trencreek Road once the level crossing has been stopped up. Access would be made from the Phase 1 Area onto Trencreek Road.
In addition, highways improvement options being considered include a potential one way system from the A392 on Trencreek Road with vehicles on the A392 directed to a proposed new junction and/or the NSR.
Treloggan | A New Living and Commercial Quarter for NewquayPUBLIC CONSULTATION
9
ModenaLifestyles
SummaryThank you for taking the time to view our exhibition showcasing the exciting development proposals for the Treloggan and Trencreek area of Newquay.
We want to hear from you before a planning application for the development is submitted to Cornwall Council. The deadline for submitting feedback is the 17th February 2021.
Please email us with your feedback to [email protected]. We would encourage all participants to make their views known, whether these are positive or negative. The Applicant will consider all comments received and this process may help to shape the application that is ultimately submitted.
Next Steps:The key next steps will be to prepare the planning application which takes on board any comments from yourselves to inform the design and assessment process. Once the application has been submitted, there will be a period of consideration and consultation by Cornwall Council, before any decision is made.
Indicative Timeline:• Application submission: February/March 2021;• Determination period: April – May 2021;and• Decision expected: June 2021.
Keep in touch:If you have any further queries or have any questions or comments, you can contact the teamby emailing [email protected] whilst the exhibition is live.
Thank You! Aerial visual isa t ion showing how the proposed development could look within the context of the sur rounding area.