Top Banner

Click here to load reader

22

Ptsc m&c brief profile (may2012)

Nov 07, 2014

Download

Business

BDPTSCMC

PTSC M&C Profile
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Ptsc m&c brief profile (may2012)
Page 2: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

PTSC OverviewPTSC – PetroVietnam Technical Services Corporation: amember of the Vietnam Oil and Gas Group(PetroVietnam) providing diversified technical services forthe oil and gas industry inside and outside Vietnam.With more than 25 subsidiaries, PTSC as a multi-sectorcorporation has gained a reputation of a leader inproviding oil & gas services in Vietnam.

1 of 22

üMarine Services

ü EPCIC Project Services, Mechanical and Construction Services

ü HUC, O&M and other Offshore Services

ü Production Services – FPSO/ROV

ü Supply Base Services

ü Procurement & Logistics Services

ü Other Services

CORE SERVICES

Page 3: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

PTSC M&C Overview

ü Established on May 15, 2001 by Act No. 731/QD-HDQT of PetroVietnam, changed to Joint StockCompany since April 2011.

ü QHSE Management system: ISO 9001-2008, ISO14001-2004 and OHSAS 18001-2007 accredited byDNV

ü ASME “U” & “S” stamp for manufacture of PressureVessel and Power Boilers.

ü ISO 17025 certificate for Calib./Testing Laboratory

ü API Monogram for Structural Tubular Rolling

2 of 22

Page 4: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

PTSC M&C Overview

0.98 39.45 39.94

15.74 24.44 51.54

106.39 98.64

177.26

349.22

533.49

-

100.00

200.00

300.00

400.00

500.00

600.00

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Revenue

Annual Revenue

Revenue (US$ mil)

3 of 22

Page 5: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Services

4 of 22

With a team of committed, professional and dynamic engineers with experience from more than 40 successful projectswith average productivity of 50,000 MT per annual PTSC M&C continuously strives to deliver the highest HSE and QAQCstandards to our Clients’ expectations and beyond.

Executing full EPCIC services foroffshore facilities including fixedplatforms, floating objects(ships, barges), modules, skids, vessels and others.

OFFSHORE

Executing EPC services for variousonshore construction plants (powerplant, LNG, gas terminal..) andjetty, port, yard, workshop andassociated facilities.

ONSHORE

§Manpower supply§ Equipment for rent§Production and manufacturing of

equipments and facilities

OTHERS

Page 6: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Organization

5 of 22

Director

Chairman

Deputy DirectorDeputy Director Deputy DirectorDeputy Director

Com

. Dep

t

BD D

ept.

Engr

. Dep

t

F&A

Dept

.

Plan

. Dep

t.

T&O

Dep

t.

HSE

Dept

HR D

ept.

Adm

in D

ept.

Cons

tr D

ept.

E & IWorkshop

StructureWorkshop 1

StructureWorkshop 2

Piping & Mec.Workshop

Services General

Workshop

Equipments General

Workshop

SecurityTeam

Page 7: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Human Resources

0

1000

2000

3000

4000

5000

6000

Indirect Direct

732

2187200

3000

Casual

Long term

6 of 22

People are our priority

Indirect Manpower Divide

53112

129

15141

326

Procurement T&OEngineering QAQCBusiness Development Others

Manpower ResoucesDec, 2011

Page 8: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

HSE Statistic

7 of 22

HSE mindset is a core value for our success

DescriptionYEAR

TOTAL2001 - 2005 2006 2007 2008 2009 2010 2011 Q1, 2012

Total ManhoursWorked 6,476,872 1,723,959 4,865,002 2,587,970 2,873,171 5,832,071 6,625,567 2,275,720 33,260,332

Lost Time Injuries 0 0 0 0 0 1 0 1 2

Lost Work day 0 0 0 0 0 30 0 11 41

Restricted Duty Injuries 0 0 0 0 0 0 0 0 0

Medical Treatment Injuries 1 1 1 0 1 1 1 0 6

First Aid 3 1 1 0 1 2 4 0 12

Near Miss 6 5 8 6 4 25 12 7 73

HAZOB Cards N/A 700 1,571 734 2,696 3,753 4,450 1,641 15,545

Fire/Explosion 1 0 3 0 0 0 0 0 4

Equipment Damage 1 2 2 0 0 0 1 1 7

Vehicle Incidents 0 0 0 0 0 0 0 0 0

No. of Fatality 0 0 0 0 0 0 0 0 0

Page 9: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Engineering Capabilityü Engineering Centre with more than 130 well educated in-house

engineers with experience from various national andinternational engineering environment and projects.

ü Secure and efficient engineering infrastructure with fullyequipped engineering softwares

üManagement teams with experience from approximately 40EPCIC projects in DE Execution, Construction Engineering andfollow-on/procurement engineering across all majordisciplines.

ü Extensive experience of in-house design process skids eg FuelGas Skids, Chemical Injection Skids, Pressure Vessels & Tanks..

ü Extensive experience of civil engineering for wharf, yardstrengthening, jetty upgrade, piling foundation

ü Partnership with leading international engineering houses

8 of 22

Page 10: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Procurement Capability

ü Extensive in-house experience and capacity in purchasing materials, equipments regionally and globally

ü Provide the most efficiency & competitive price in the shortest time with high quality

ü Actively promote and follow international trading practices terms and conditions

ü More than 50 qualified procurement employees with experience from major international EPCIC projects

ü Possess a rich Vendors database and unit prices database

ü Efficient in-house expediting team familiar with custom authorities and closely connected to regional and global forwarders and custom authorities

9 of 22

Page 11: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Construction Capability

10 of 22

Yard Facilities

ü Total area: 57 ha

ü Quay length: ~500 m

ü Quay width: 28 m

ü Water depth: 10 – 15 m.

ü Jetty distribution: 7 MT cargo/m2

ü Quayside designed for 20,000 DWTVessels

ü Dredging the sea bed toaccommodate CPP up to 25,000 MT

ü 3 Skidways (6,000 MT; 15,000MT &25,000MT)

• Subcontractors/ partners yard areas not included and able to utilise up to 180ha upon required.

Page 12: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Construction Capability

11 of 22

Manpower Resouces, Subcontractors, Tools & Equipments

Deversified and modern in-house fabrication facilitiesready for the work; chainsystem to increaseproductivity, minimize humanmistakes

Tools & Equipments

A skilful and hard-workingworkforce with over 2,100workers; qualified & familiarwith international standards;annual trained throughvarious courses; supervised byover 100 experiencedsupervisors at constructionyard.

Manpower Resources

Close partnership with various parties incooperating, supervising and managing productionquality & safety; verifying

3rd parties services

Co-operating with experienced and qualifiedconstruction subcontractors inside and outsideVietnam (maximizing local content, shareresources/workload and approach new potentialprojects)

Subcontractors

Page 13: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

T&I, HUC Capability

12 of 22

ü Provide complete delivery solutions for offshore transportation, installation, hook-up & commissioning projectsranging from marginal field developments to large integrated gas processing facilities

ü Extensive experience of offshore services through out various EPCIC projects implemented.

üWide range of global T&I, HUC partners

Page 14: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Major Projects

Bien Dong 1 Project

§ Client: Bien Dong POC

§ Project type: EPCIC

§ Duration: 02/2010 – tentatively 07/2012

§ Key Facilities: 01 CPP, 01 WHP, 01 CPP Jacket & Piles, Pipeline & subsea cables

§ Total weight: ~ 30,000 MT

Offshore EPCIC Projects

Su Tu Den NE Project

§ Client: CuuLong JOC

§ Project type: EPCIC

§ Duration: 02/2008 – 07/2010

§ Key Facilities: 01 WHP, 01 jacket, infield pipelines & submarine cable

§ Total weight: ~ 3,500 MT

Chim Sao Project

§ Client: Premier Oil Vietnam Offshore

§ Project type: EPCIC

§ Duration: 08/2008 – 10/2010

§ Key Facilities: 01 WHP, 01 jacket & piles, pipelines & submarine cable

§ Total weight: ~ 7,500 MT

14 of 22

Page 15: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Major Projects

Su Tu Trang Project

§ Client: CuuLong JOC

§ Project type: EPCIC

§ Duration: 03/2010 – tentatively 06/2012

§ Key Facilities: 01 WHP, 01 jacket, pipelines

§ Total weight: ~ 2,500 MT

Offshore EPCIC Projects

Bunga Orkid Project

§ Client: Talisman Malaysia Limited

§ Project type: EPC

§ Duration: 07/2006 – 03/2008

§ Key Facilities: 03 WHPs

§ Total weight: ~ 4,000 MT

Te Giac Trang Project

§ Client: Hoang Long JOC

§ Project type: EPCIC

§ Duration: 11/2009 – 08/2011

§ Key Facilities: 01 WHP, 02 jacket, 01 drilling deck, infield pipeline

§ Total weight: ~ 4,000 MT

15 of 22

Page 16: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Major Projects

Su Tu Den WHP-A Project

§ Client: CuuLong JOC

§ Project type: EPC

§ Duration: 05/2002 – 09/2003

§ Key Facilities: 01 WHP

§ Weight: 2,200 MT

Offshore E-P-C Projects

16 of 22

PLDP-A Project

§ Client: Petronas Caligali Vietnam

§ Project type: PCC

§ Duration: 01/2008 – 06/2009

§ Key Facilities: 01 WHP

§ Weight: 600 MT

Ruby-B Project

§ Client: Petronas Caligali Vietnam

§ Project type: EPC

§ Duration: 10/2004 – 09/2005

§ Key Facilities: 01 WHP

§ Weight: 1,300 MT

Page 17: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Major ProjectsOffshore E-P-C Projects

17 of 22

Topaz Project

§ Client: Petronas Caligali Vietnam

§ Project type: PCC

§ Duration: 10/2009 – 07/2010

§ Key Facilities: 01 WHP, 01 Jacket, Piles & Conductors

§ Total weight: ~ 4,000 MT

Song Doc WHP-A Project

§ Client: Truong Son JOC

§ Project type: PC

§ Duration: 06/2007 – 02/2008

§ Key Facilities: 01 WHP

§ Weight: 600 MT

Bunga Tulip A Project

§ Client: Talisman Malaysia Limited

§ Project type: C

§ Duration: 12/2005 – 07/2006

§ Key Facilities: 01 WHP, 01 Mono-pod Jacket

§ Total weight: 900 MT

Page 18: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Major ProjectsOffshore E-P-C Projects

18 of 22

WHP-C1/CLPP/NBR3 Project

§ Client: Japan Vietnam Petroleum Company

§ Project type: C

§ Duration: 10/2004 – 05/2005

§ Key Facilities: 02 WHPs, 01 bridge

§ Total weight: ~ 1,200 MT

JVPC S1 Project

§ Client: Japan Vietnam Petroleum Company

§ Project type: C

§ Duration: 02/2002 – 08/2002

§ Key Facilities: 01 WHP

§ Weight: 450 MT

BP Compression Module Project

§ Client: British Petroleum (BP) Vietnam

§ Project type: PC

§ Duration: 07/2006 – 10/2007

§ Key Facilities: 01 Compression Module

§ Weight: 2,000 MT

Page 19: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Major ProjectsOffshore E-P-C Projects

19 of 22

LQ-CPC/99 Project

§ Client: VietsovPetro JV

§ Project type: EPC

§ Duration: 12/1999 – 12/2000

§ Key Facilities: 02 LQs (70 men each)

§ Total weight: ~ 2,300 MT

Bunga Raya-A Project

§ Client: Talisman Malaysia Limited

§ Project type: EPC

§ Duration: 03/2002 – 07/2003

§ Key Facilities: 01 LQ (48 men), 01 Bridge

§ Total weight: 1,000 MT

JVPC NULQ Project

§ Client: Japan Vietnam Petroleum Company

§ Project type: EPC

§ Duration: 02/2002 – 08/2003

§ Key Facilities: 01 LQ (63 men), 02 bridges

§ Total weight: 1,400 MT

Page 20: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Major ProjectsOffshore E-P-C Projects

20 of 22

100 Men LQ Project

§ Client: Petrovietnam Marine Shipyard

§ Project type: C

§ Duration: 10/2010 – 03/2011

§ Key Facilities: 01 LQ (100 men) for 90m water depth jack-up rig

§ Total weight: 300 MT

PTSC-01 Project

§ Client: PTSC

§ Project type: EPC

§ Duration: 10/2008 – 11/2009

§ Key Facilities: 5,000DWT Ballast Barge for transporting topsides, jackets,..

§ Total weight: 2,400 MT

3509 TUG BOAT Project

§ Client: PTSC

§ Project type: PC

§ Duration: 12/2009 – 10/2010

§ Key Facilities: 02 tug boats with capacity 3,500 BHP and 4,750 BHP

§ Total weight: 1,000 MT

Page 21: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Major Projects

Dung Quat Refinery Harbor Project

§ Client: DungQuat Refinery PMT

§ Project type: PC

§ Duration: 06/2006 – 12/2007

§ Key Facilities: construct from Berth 1 to 6 of Product Export harbor for DungQuat Refinery Harbor Project.

Onshore Projects

GPPIC Project

§ Client: PetroVietnam Gas Company

§ Project type: EPC

§ Duration: 08/2001 – 02/2002

§ Key Facilities: Four (04) big compressors

NCS Condesate Storage Project

§ Client: Client: PetroVietnam Gas Company

§ Project type: EPC

§ Duration: 11/2001 –11/2003

§ Key Facilities: Two condensate tanks, condensate pumps, metering skid system, floating roofs

§ Capacity: 16,500 m3/each

21 of 22

Page 22: Ptsc m&c brief profile (may2012)

SOLUTIONS FOR THE OIL & GAS INDUSTRY

Clients & Partners

22 of 22