Top Banner
PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006
12

PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

Dec 19, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

PTC Update and Pro/ENGINEER RoadmapMichael M. CampbellVice President of Product Management, MCAD

November 2006

Page 2: PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

© 2006 PTC2 PTC Confidential

Great Products…

… define markets

… drive revenue growth

… generate profitability

… create competitive advantage

… build bonds with customers

… increase shareholder value

… energize employees

Page 3: PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

© 2006 PTC3 PTC Confidential

Product Development is Difficult

Out of every 100 development projects: 63 are cancelled, 25 are commercially successful, and 12 fail

(Booz Allen)

Up to 1/3 of Product Development time spent on unnecessary work or waiting for decisions/information

(McKinsey)

46% of product development resources are spent on products that fail

(Cooper, Product Development Institute)

90% of product launches capture 1% market share

(Boston Consulting Group)

cancelled fail

fail

Page 4: PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

© 2006 PTC4 PTC Confidential

Today’s Typical IT Infrastructure is a Barrier to Improvement

Email

FTP

Courier

ProposalsCustomer Requirements

Part DesignsBoMsChanges

CustomConfigurations

RequirementsDesign Feedback

Field Notices

ModelsDrawingsSimulations

ConceptsRequirements

Market RequirementsBrochures, Data Sheets

Preferred PartsApproved Vendors Feasibility

FeedbackTooling DesignsWork InstructionsNC Programs

Customer Concerns

Failure Reports

User, Service Manuals

SneakerNet

Distributed MfgDistributed Mfg

SupplierSupplierSupplierSupplier

SupplierSupplier

Distributed MfgDistributed Mfg

Distributed MfgDistributed Mfg

CustomersCustomers

CustomersCustomers

CustomersCustomersDesign PartnerDesign Partner

Design PartnerDesign Partner

Design PartnerDesign Partner

ManufacturingManufacturing

ServiceService

ProcurementProcurement

EngineeringEngineering

MarketingMarketing SalesSales

Page 5: PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

© 2006 PTC5 PTC Confidential

OUR VISION:

The Optimum Product Development System For Distributed Teams

ProposalsCustomer Requirements

Part DesignsBoMsChanges

CustomConfigurations

RequirementsDesign Feedback

Field Notices

ModelsDrawingsSimulations

ConceptsRequirements

Market RequirementsBrochures, Data Sheets

Preferred PartsApproved Vendors

Feasibility FeedbackTooling DesignsWork InstructionsNC Programs

Customer Concerns

Failure Reports

User, Service ManualsTraining guidesParts catalogs

CustomersCustomers

Distributed MfgDistributed MfgSupplierSupplier

ManufacturingManufacturing

ServiceService

ProcurementProcurement

EngineeringEngineering

MarketingMarketing SalesSales

Distributed MfgDistributed MfgDistributed MfgDistributed MfgSupplierSupplier

SupplierSupplier

Captive ODCCaptive ODC

Local Design PartnerLocal Design Partner

Offshore Design Partner

Offshore Design Partner

CustomersCustomers

Regulatory AuthoritiesRegulatory Authorities

Page 6: PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

© 2006 PTC6 PTC Confidential

How to Get from Here to There…

PTC Value Roadmap

IndustrialEquipment

Retail,Footwear,Apparel

Page 7: PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

© 2006 PTC7 PTC Confidential

How to Get from Here to There…

PTC Value Roadmap

Page 8: PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

© 2006 PTC8 PTC Confidential

PTC’s Product Development System

Windchill

Arbortext

ProductView

Pro/ENGINEER Mathcad

Page 9: PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

© 2006 PTC9 PTC Confidential

Only PTC…

Adoption

• Implementation

• Process & Technology Adoption

• Education

Process Optimization

• Process Expertise

• Best Practices

• Validated

Footprint• Create

• Collaborate

• Control

• Configure

• Communicate

Architecture

• Integral

• Internet

• Interoperable

Page 10: PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

Looking Back – The Last 8 Months

Page 11: PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

© 2006 PTC11 PTC Confidential

Pro/E

Pro/ENGINEER is the only truly scalable solution in the industry…

Pro/ENGINEER is the Market Leader

Source: 2004 and 2005 Wohler’s Associates

For Small Companies For Large Companies

24,246 customers with only ONE or TWO seats

Win

MoreBusiness

Top 20 customers average 2,800 active seats

Reduce

Costs &Time

FQ1'06 FQ2'06 FQ3'06 FQ4'06

ScalabilityLeadsTo …

RevitalizedPro/ENGINEERRevenue Growth

Page 12: PTC Update and Pro/ENGINEER Roadmap Michael M. Campbell Vice President of Product Management, MCAD November 2006.

© 2006 PTC12 PTC Confidential

Pro/ENGINEER Wildfire 3.0 ~ Work Faster!

Personal Productivity

Easier to use

–Modern, Consistent

–Instantly Familiar

Expanded Capabilities

Faster Response

–Optimized Algorithms

–Assembly Performance

Fast CAM

Fast Assembly

Fast Sketcher

Fast Sheetmetal

Fast Drawings