Top Banner
Motor Removal System Motor removal system includes davit arm(s) to facilitate motor replacement. PT2 COOLING TOWER COUNTERFLOW // INDUCED DRAFT // AXIAL FAN The Superior Counterflow Cooling Tower TriArmor ® Corrosion Protection System Unique triple layer protection (galvanized steel, thermosetting hybrid polymer, polyurethane barrier) form a completely seamless cold water basin, ensuring longevity and durability. BALTIDRIVE ® Power Train $7,500 Lifetime Savings Per Cell Unique corrosion resistant materials and state-of-the-art technology ensure reliable, year-round operation. It requires only periodic inspection of components and belt tensioning with a simple nut adjustment. BranchLok Removal System Allows faster cleaning to extend system life and sustain peak performance. Tool-less Inward Sliding Access Door Easy access to the motor and drive components simplifies service to increase system life and performance. EVERTOUGH Construction Combines the most corrosion resistant materials to withstand extremely adverse water conditions and is backed by a comprehensive 5-year warranty. Materials include a TriArmor ® Corrosion Protection System cold water basin, stainless steel submerged components, thermosetting hybrid polymer on wet/dry areas and a PVC water distribution system. InterLok System $500 Savings Per Cell Cells are easy to assemble and require no sealer tape. The PT2 Cooling Tower was designed with the end users in mind. Its design highlights BAC’s commitment to low installation costs, ease of maintenance, energy efficiency, and high reliability. Offering a compact footprint, the PT2 provides an efficient solution for installations with space constraints. Factory Assembled Platforms $1,200 Savings Per Cell Ideal for contractors and owners looking to reduce the cost of installation while ensuring on-time commissioning. Combined Air Inlet Shields Designed to block sunlight to prevent growth of algae on the fill and minimize splash. Four Sided Air Inlets Smaller footprint with additional layout flexibility when required. Single-Piece Lift to Final Placement $880 Installation Savings per Cell Assemble the unit on the ground then lift it into place.
2

PT2...2017/02/16  · Its design highlights BAC’s commitment to low installation costs, ease of maintenance, energy efficiency, and high reliability. Offering a compact footprint,

Feb 03, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Motor Removal System Motor removal system includes davit arm(s) to facilitate motor replacement.

    PT2 C O O L I N G T O W E R

    COUNTERFLOW // INDUCED DRAFT // AXIAL FAN

    The Superior Counterflow Cooling Tower

    TriArmor® Corrosion Protection SystemUnique triple layer protection (galvanized steel, thermosetting hybrid polymer, polyurethane barrier) form a completely seamless cold water basin, ensuring longevity and durability.

    BALTIDRIVE® Power Train $7,500 Lifetime Savings Per Cell Unique corrosion resistant materials and state-of-the-art technology ensure reliable, year-round operation. It requires only periodic inspection of components and belt tensioning with a simple nut adjustment.

    BranchLok™ Removal SystemAllows faster cleaning to extend system life and sustain peak performance.

    Tool-less Inward Sliding Access Door Easy access to the motor and drive components simplifies service to increase system life and performance.

    EVERTOUGH™ ConstructionCombines the most corrosion resistant materials to withstand extremely adverse water conditions and is backed by a comprehensive 5-year warranty. Materials include a TriArmor® Corrosion Protection System cold water basin, stainless steel submerged components, thermosetting hybrid polymer on wet/dry areas and a PVC water distribution system.

    InterLok™ System $500 Savings Per Cell Cells are easy to assemble and require no sealer tape.

    The PT2 Cooling Tower was designed with the end users in mind. Its design highlights BAC’s commitment to low installation

    costs, ease of maintenance, energy efficiency, and high reliability. Offering a compact footprint, the PT2 provides an efficient

    solution for installations with space constraints.

    Factory Assembled Platforms $1,200 Savings Per Cell Ideal for contractors and owners looking to reduce the cost of installation while ensuring on-time commissioning.

    Combined Air Inlet Shields Designed to block sunlight to prevent growth of algae on the fill and minimize splash.

    Four Sided Air Inlets Smaller footprint with additional layout flexibility when required.

    Single-Piece Lift to Final Placement $880 Installation Savings per Cell Assemble the unit on the ground then lift it into place.

  • POP152/1-A © 2017 › Baltimore Aircoil Company 7600 Dorsey Run Road, Jessup, MD 20794 › Telephone: (410) 799-6200 › Fax: (410) 799-6416

    THE BAC DIFFERENCEIndustry leading technology, the strength of our people and sales network, and the reliability of our products are reasons to partner with BAC. Let us create innovative

    value added custom solutions for your unique applications.

    PT2 C O O L I N G T O W E R

    103-827 Nominal Tons in a Single Cell

    Up to 3,100 USGPM for Process Applications

    EASE OF MAINTENANCEBranchLok™ Removal System

    Tool-less Inward Sliding Access Door

    HIGH RELIABILITYTriArmor® Corrosion Protection System

    EVERTOUGH™ Construction

    IBC Compliant // FM Approved

    LOW INSTALLED COST$Single Piece Lift

    Factory-Assembled Platforms

    InterLok™ System

    HIGHEFFICIENCYCTI Certified

    Meets or Exceeds ASHRAE Standard 90.1

    Easy Cleaning and Maintenance

    SMALL TO

    MEDIUMTONNAGE REQUIREMENTS

    BALTIMOREAIRCOIL.COM

    E X C L U S I V E F E A T U R E S

    IBC Compliant

    FMAPPROVED