` PT. PUMA JAYA UTAMA PT. PUMA JAYA UTAMA Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]Total Solution for Drill Rig HEAD OFFICE Jl. Ebony Raya D 1 / 11 Sumasang, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia Phone: (62-475) 322009 Fax: (62-475) 322009 E-mail: [email protected]Secondary Email: [email protected][email protected]COMPANY PROFILE PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services
10
Embed
PT. PUMA JAYA UTAMA. PJU Company... · Profile and History . 2 PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services PT. PUMA JAYA UTAMA Jl. Ebony Raya D 1 / 11, Soroako ...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
`
` 1
PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services
PT. PUMA JAYA UTAMA
Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]
Total Solution for Drill Rig
HEAD OFFICE
Jl. Ebony Raya D 1 / 11 Sumasang, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia Phone:
PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services
`
` 1
PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services
PT. PUMA JAYA UTAMA
Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]
Total Solution for Drill Rig
PT. PUMA JAYA UTAMA was formed in August 2008, which previously named CV. JAYA UTAMA performed in March 2003. PJU which was established to address drilling services, supply, and maintenance in Mines and Exploration. By the current of management representing are : Director : I Dewa Putu Mandra General Manager : Gede Sandhy I Operational Manager : Fickry Amier Baso Since established in 2008, management and all employees remain committed to providing the best service of total solutions in the sustainable drilling for customer satisfaction, so we can provide the best possible service to our clients. PJU was performed, with the aim to answer the needs of businesses in the drilling sector, particularly in the drilling and maintenance services and supply. The company is expected to grow and evolve as the company's operations and maintenance services of leading, and able to carry out drilling activities with international standards. We focus on continual improvement in safety, equipment, a variety of drilling services, training, customer service, for quality achievement and develop relationships on the ground with customers, through innovation, solid hard work, sheer determination and empowerment of our local employees, that resolve is a key element of our corporate culture. We will be united by our commitment to our core values of PJU stands for : Financial Discipline: Our decisions will be made to ensure long-term growth for the benefit of employees and customers. Integrity and Honesty: Our actions will be conducted following the highest standard of ethics, honesty and personal integrity. This will foster and maintain trust and confidence of our employees, customers and suppliers. Respect for Employees, Customers and Suppliers: Our employees will be developed and motivated to meet the challenges ahead. Individuality and diversity will be valued and performance recognized. We will provide our customers with unsurpassed value-added service. Our relationship with suppliers will reflect respect, understanding and sound business practice. Safety: Personal safety and employee health is our greatest responsibility, followed by the protection of our environment and company property. Technical Leadership: Our competitive advantage is based on continually improving our processes and finding innovative solutions to the technical challenges in meeting the needs of our customers. Risk management be applied in every business process will be undertaken PJU to predict, identify, and prevent potential risks that could hinder the achievement of targets that have been set.
Profile and History
2
PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services
PT. PUMA JAYA UTAMA
Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]
Total Solution for Drill Rig
Chart of Organization
BOARD OF DIRECTOR
GENERAL MANAGER
ADMINISTRATION
INFORMATION TECHNOLOGY
OPERATION
LOGISTIC & WORKSHOP
FIELD SUPERVISOR
HRD
FINANCE
SAFETY
PT. PUMA JAYA UTAMA
Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]
Total Solution for Drill Rig
3
PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services
We are committed to:
1. Ensure Occupational Health & Safety (OHS) for all employees including contractors, suppliers, and visitors in the
workplace.
2. Ensure control over the environmental impact of Company’s operations.
3. Meet all applicable laws and regulations relating to OHS.
4. Perform continues improvement in order to improve Company’s OHS performances.
Work within the scope of the mining / drilling, PJU realize the critical importance of health and safety for all workers, for these purpose our company created an integrated system in compliance with occupational safety and health with indonesian legislation and international code requirement. By considering the factors of health and safety of workers, we realize that they will be able to make a major contribution to all activities and companies. Safety is the most critical quality we provide to our customers. It is woven throughout every decision made at every job site. Safety is always at the forefront of all of our efforts. We have high expectations for our suppliers with the safety of our equipment. It is important for us to spend the time, resources and energy required to make sure that crews go home safely at the end of their shift.
Common goal: to create workers who have a full awareness of the meaning of health & safety, which contributes to self, family, companies, and countries, by providing maximum productivity capabilities and efficient in work.
Specific objectives: creating a workplace environment that provides security, comfort & safety for workers and guests in performing duties, with reference to the Zero accident.
To achieve our commitments, we shall:
1. Develop and maintain continuously Occupational Health and Safety Management System (OHSMS).
2. Arrange OHS Organization within Company’s Management.
3. Identify and control all hazard sources and environmental aspects of Company’s operation.
4. Provide OHS training for all employees in order to improve Company’s OHS behavior.
5. Encourage all employees to participate in improvement of Company’s OHS performance.
6. Promote and carry out operations that are responsible for the environment and benefit the stakeholders including
local communities based on the applicable legal norms.
Safety is everyone’s responsibility! No job is so important not is any task so difficult that it cannot or should not be performed safely!
HSE Commitment
PT. PUMA JAYA UTAMA
Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]
Total Solution for Drill Rig
4
PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services
Our Services Include : 1. Exploration and Development Core Drilling
Nickel
Coal
Mineral 2. Geotech Drilling
Piezometer Drilling
Monitoring Well
Down Hole Surveys
Environmental Drilling
SPT and UDS Sampling 3. Water Well
4. Blast Hole 5. Large Diameter Drilling (LDD) 6. Manpower Supply for Mining and Exploration 7. Manpower Supply for Sample Preparation:
Data Processing
Core Preparation
Pulp Preparation
Sample Analyzing 8. Exploration Equipment Supply and Maintenance
Services 9. Sales services for Drilling Equipment
Rig Equipment
Rig Unit Drill Rods Core Diameter (mm) Hole Size (mm)
PQ 85
122.6
HQ 63.5 96
NQ 47.6 75.7
PUMA 3500
PUMA 3000
PUMA 2500
PUMA 2300
PUMA 2200
2 units
12 units
13 units
11 units
4 units
150 meters
50 meters
20 meters
15 meters
12 meters
400 meters
150 meters
100 meters
80 meters
60 meters
800 meters
350 meters
200 meters
150 meters
100 meters
Depth are depend on lithology and other condition
Service, Equipment and Facilities
PT. PUMA JAYA UTAMA
Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]
Total Solution for Drill Rig
5
PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services
Workshop and Facilities PJU facilitate a full support for our project site operation with quality technology, along with complete mechanical, hydraulic and electrical assembly services and guarantee spare part availability to drilling operation on site. Support Facilities 1. Office and Workshop in Sorowako 2. Light Vehicles: