Top Banner
Providing Wireless Carriers Access to Progress Energy’s Utility Infrastructure 3 rd Quarter 201 SITE SHOWCASE A QUARTERLY LOOK AT SOME OF OUR BEST SITES
16
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PT Access Networks Showcase Sites 3rd quarter 2011

Providing Wireless Carriers Access to Progress Energy’s Utility Infrastructure

3rd Quarter 2011SITE

SHOWCASE

A QUARTERLY LOOK AT SOME OF OUR BEST SITES

Page 2: PT Access Networks Showcase Sites 3rd quarter 2011

Access in NC & SC to: 50,000 + Transmission Structures50 + Microwave Towers600 + Sub Stations

Our Carolinas Service Area

Page 3: PT Access Networks Showcase Sites 3rd quarter 2011

Carolina Country Club – Existing 100’ Transmission Structure

For More Information Call: David Hargrove (919) [email protected]

Page 4: PT Access Networks Showcase Sites 3rd quarter 2011

New 195’ Monopole - Raleigh, NC

10416 Ten Ten Rd, Raleigh, NCN 35 38’ 08.5 W 78 37’ 46.8

For More Information Call:

David Hargrove (919) [email protected]

• 182’; 172’ & 162’ RAD Centers Available•Power/Telco-Fiber on site•No Zoning Required •Immediate Coverage

Page 5: PT Access Networks Showcase Sites 3rd quarter 2011

I-40/Raleigh Oakdale Substation – Proposed 198’ Monopole

For More Information Call:

David Hargrove (919) [email protected]

Page 6: PT Access Networks Showcase Sites 3rd quarter 2011

I-540 & Creedmoor – Proposed 190’ Transmission Replacement

For More Information Call:

David Hargrove (919) [email protected]

Page 7: PT Access Networks Showcase Sites 3rd quarter 2011

NC State Fairgrounds – Top of 120’ Existing Transmission Structure

•125’ RAD Center Available•Power/Telco-Fiber on site•Immediate Coverage

For more information contact: David HargrovePT Access Networks(919) [email protected]

Page 8: PT Access Networks Showcase Sites 3rd quarter 2011

For more information contact: David HargrovePT Access Networks(919) [email protected]

Litchford Road Substation - New 180’ Monopole Build - 2012

•170’ & 160’ RAD Centers Available•Power/Telco-Fiber on site•Immediate Coverage

Page 9: PT Access Networks Showcase Sites 3rd quarter 2011

Cary Substation – 195’ Proposed Stealth Monopole

For More Information Call:

David Hargrove (919) [email protected]

In Development Now

Page 10: PT Access Networks Showcase Sites 3rd quarter 2011

Cary Substation – I-540 – 195’ Stealth Monopole

For More Information Call:

David Hargrove (919) [email protected]

Built in 2013

RAD Space

Available Now!

Page 11: PT Access Networks Showcase Sites 3rd quarter 2011

For more information contact: David HargrovePT Access Networks(919) [email protected]

I-85 & Falls Lake – Proposed 198’ Monopole

•195’ to 165’ RAD Centers Available•Power/Telco available•NCDOT 2010 ADT of 41,000 on I-85

Page 12: PT Access Networks Showcase Sites 3rd quarter 2011

New 300’ Microwave Tower2631 Gum Branch Rd., Jacksonville, NC

N 34 48’ 19.744 W 77 26’ 50.240 (NAD 83)

For More Information Call:

David Hargrove (919) [email protected]

• 180’ RAD Center• 45.3 feet AMSL•Power/Telco on site•No Zoning Required •Immediate Coverage

Page 13: PT Access Networks Showcase Sites 3rd quarter 2011

I-40 at Walters Dam – 128’ Mono Pine in Development - 2012

This site has been in development stage over 3 years…

• Haywood County approved site• Close to the border of NC and TN•125’ & 115’ RAD Centers Available• Ground Elevation 2,535’

For More Information Call:

David Hargrove (919) [email protected]

Under Construction

Now!

Page 14: PT Access Networks Showcase Sites 3rd quarter 2011

Carolina Beach Substation – Proposed 185’ Monopole

For More Information Call:

David Hargrove (919) [email protected]

Page 15: PT Access Networks Showcase Sites 3rd quarter 2011

Sumter, SC Substation, 275’ Existing Microwave Tower

For More Information Call:

David Hargrove (919) [email protected]

Page 16: PT Access Networks Showcase Sites 3rd quarter 2011

For More Information:

David Hargrove (919) [email protected]

We were working on and around Towers long before there was a Wireless Phone … after all, Towers are our Business!