PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone 22 th November 2012 LIU-PSB
17

PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

Jan 20, 2018

Download

Documents

BTM- BHZ 10 BTY-BVT 101 EQUIPMENT TO BE DISMANTLED DUMP
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

PSB DUMP REPLACEMENT: STRATEGY & STATUS

LIU-PSB Meeting 90A. Sarrió, F. Loprete, A. Perillo-Marcone

22th November 2012

LIU-PSB

Page 2: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

Pump BT-VPI23A

Pump BT-VPI23A

passage

BT-BHZ 10

Page 3: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

BT-BHZ 10BTM-

BHZ 10 BTM-BHZ 10BTY-BVT

101

EQUIPMENT TO BE DISMANTLED DUMP

Page 4: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

EQUIPMENT TO BE DISMANTLED

Elements to be disposed of and replacedEquipment to be temporarily dismantled

Page 5: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

STRATEGY: STEPS

‘Plug’ against

radiation

Page 6: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

STRATEGY: STEPS

Blocking system

‘Plug’ against

radiation

Clamping tool

Page 7: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

Clamping system to pull the old beam pipe + dump core

Page 8: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

STRATEGY: STEPS

Saw Container dump

Container beam pipe

Frame and adjustable support for

winch

Blocking system

‘Plug’ against

radiation

Clamping tool

Page 9: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

System to cut the beam pipe

Page 10: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

System to pull the beam pipe-dump core assembly: winch

Page 11: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

The necessary equipment will be brought through the shaft by crane Length: 2.6m to 2.9m

Width: 1.5mSWL PR: 10t

Page 12: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

BACK-UP

Page 13: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

Most outer shielding block must be blocked

Page 14: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

Shielded container for dump core

Page 15: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

Lifting support

Page 16: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…

Adjustable height table

Page 17: PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone…