Top Banner
1 PSERC T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006
25

PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

Jan 03, 2016

Download

Documents

Lewis Garrison
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

1

PSERC

T&D Technology Research Stem

Highlights of T&D Stem Activity(2000-2005)

Mladen KezunovicFormer Stem Leader

IAB Meeting Madison, June 1, 2006

Page 2: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

2

PSERCOutline

• History• Research Areas• Projects• Survey • Initiatives• Future interest

Page 3: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

3

PSERCHistory

• First meeting: Conference call on May 25, 2001

• Meetings and presentations: - 30 stem meetings (583 in attendance) - 10 IAB presentations• Membership: - 20 in 2000 - 35 in 2005 • Participation: - Conference calls, from 8 (L) to 19 (H) - IAB meetings, from 16 (L) to 42 (H) - Retreats/Workshops, from 28 (L) to 52 (H)

Page 4: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

4

PSERCOutline

• History• Research Areas• Projects• Survey • Initiatives• Future interest

Page 5: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

5

PSERCPSERC RESEARCH STEMS

Markets

Systems

T&D

Page 6: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

6

PSERCT&D Research Areas

I.  Substation Data Integration and Enhanced FunctionsII. Managing an Aging InfrastructureIII. Distribution and Transmission AutomationIV. New Devices and Related Control ConceptsV. New Monitoring, Control and Protection Paradigms

Page 7: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

7

PSERCOutline

• History• Research Areas• Projects• Survey • Initiatives• Future interest

Page 8: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

8

PSERCProjects

T-1 Corona Discharge Deterioration of ADSS Cable Karady May 2002

T-2 Differential GPS Measurement of Overhead Conductor Sag Heydt (ASU) Sep. 2002

T-3 On-Line Peak Loading of Substation Distribution Transformers Through Accurate Temperature Prediction

Tylavsky (ASU) Apr. 2002

T-4 Electrical Transmission Line Insulator Flashover Predictor Karady (ASU) May 2002

T-5 Intelligent Substation Shoureshi (CSM) Aug. 2004

T-6 Condition Monitoring for In-Service Non-ceramic Insulators and Underground Cables

Gorur (ASU) May 2002

T-7 Redesign and New Interpretation of Power Acceptability Curves for Three Phase Loads

Heydt (ASU) Feb. 2001

T-8 Investigation of Fuel Cell Operation and Interaction within the Surrounding Network

Karady (ASU) May 2002

T-9 State Estimation via Substation Monitoring Abur (TAMU) Feb. 2003

T-10 Accurate Fault Location in T&D Networks Kezunovic (TAMU) Feb. 2003

T-11 Monitoring Using Wireless Communications Kezunovic (TAMU) Apr. 2003

T-13 Grounding and Safety with OPGW Olsen (WSU) Oct. 2002

T-14 NCI Evaluation: Seals and Interfaces Gorur (ASU) Aug. 2004

T-15 GPS Measurement of Overhead Conductor Sag Heydt (ASU) April 2002

T-20 Smart Sensor Development for T&D Shoureshi (CSM) Aug. 2004

T-21 Distributed Electric Energy Storage and Generation Jewell (WState) July 2004

Page 9: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

9

PSERC Projects

Number Title Lead Researcher Status

T-16 Voltage Dip Effects Karady (ASU) October 05

T-17 Algorithms and IEDs for On-Line Monitoring Kezunovic (TAMU) January 2006

T-18 MicroGrid Protection and Control Lasseter (Wisconsin) January 2006

T-19 Optimized Maintenance Scheduler McCalley (Iowa State) February 2006

T-22Advanced Digital Measurement and Protection

SystemsKarady (ASU) Draft

T-23 Prioritizing Maintenance of Underground Cables Gorur (ASU) Work in progress

T-24 Distribution System Reliability Enhancement Jewell (Wichita State) Draft

T-25 Liquid Filled Power Transformers P. K. Sen (CSM) Work in progress

Page 10: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

10

PSERC Projects

Number Title Lead Researcher Status

T-26G Tool for Insulator Condition Assessment Gorur (ASU) Work In progress

T-27 Reliability Based Vegetation Management Russell (TAMU) Work in progress

T-28Satellite Imagery for the Identification of

InterferenceKarady (ASU) Works in progress

T-29 Evaluation of Digital Protection System Kezunovic (TAMU) Work in progress

T-30 Transient Testing of Protective Relays Kezunovic (TAMU) Work in progress

T-31 Massively Deployed Sensors Heydt (ASU) New Project

T-32 Integration of Substation IED Information Kezunovic (TAMU) New Project

Page 11: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

11

PSERCProject statistics

• Arizona state: 14• Texas A&M university: 8• Colorado school of Mines: 3• Wichita State: 2• GaTech: 1• Iowa State: 1• Washington State: 1• Wisconsin: 1

Page 12: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

12

PSERCAreas Covered

• Distribution: - Distributed energy storage and

generation - Microgrid protection and control - Performance of fuel cells - Diagnostics of cables and NCI - Power quality assessment - Transformer loading and diagnostics - System reliability enhancement - Vegetation interference with feeders

Page 13: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

13

PSERCAreas Covered

• Transmission: - Substation automation - Integration of IED data - Automated analysis of faults - Optical transformers - All-digital substation - Inclusion of IED data in EMS - Monitoring of conductor sags

Page 14: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

14

PSERCAreas Covered

• T&D: - Risk-based optimized maintenance - Wireless communications - Smart sensors - State estimation - Fault location - IED testing and evaluation - Grounding and safety

Page 15: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

15

PSERCOutline

• History• Research Areas• Projects• Survey • Initiatives• Future interest

Page 16: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

16

PSERCSurvey

• Lead investigators responded• 22 completed projects• 19 response• 11 questions• Purpose: explore opportunities for

continuation of funding• Samples of some answers

Page 17: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

17

PSERCSurvey

• Research characterization: - fundamental, 0 - applied, 14 - combination, 5• Deliverables (besides final report): - software, 7 - hardware, 1 - analytical tools, 10 - other, 2

Page 18: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

18

PSERCSurvey

• Additional funding to get practical solution: - $50k-$100k, 4 - $100k-$250k, 10 - $250k-500k, 2 - over $500k, 1• Source of funding: - PSerc, 5 - NSF, 2 - EPRI, 10 - DOE, 8 - Vendors, 3 - Other, 3

Page 19: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

19

PSERCSurvey

• Time required to create practical solution:

- six months, 1 - two years, 10 - one year, 4 - three (or more)

years, 2 • What are verification requirements: - testing with simulated data, 4 - testing with field data, 11 - In service installation, 9

Page 20: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

20

PSERCOutline

• History• Research Areas• Projects• Survey • Initiatives• Future interest

Page 21: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

21

PSERCActivities of interest

• Reviewing project progress in separate meetings (using distance conferencing or net facilities/services) that will take place in-between the IAB meetings (42)

• Making sure the final reports for completed PSerc projects are properly reviewed and advertised (37)

• Producing a list of research areas of interest for the solicitation of new proposals (37)

• Conducting the review process and ranking of the proposals (32)

• Initiating review of the Statement of Work (SOW) documents for the projects in similar research areas making sure the coordination of the research activities is optimized (18)

Page 22: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

22

PSERCCrosscutting issues

• State Estimation• Special Protection Systems• Distributed Processing• Phasor Measurements• Improved SCADA

Page 23: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

23

PSERCOutline

• History• Research Areas• Projects• Survey• Initiatives• Future interest

Page 24: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

24

PSERC Project classification• Proposed classification: - Exploratory projects (40% of funds, 1-2 years, $70k-$100k, fundamental research) - Demonstration projects (40% of funds, 2-3 years, $100k-$500k, field or simulation

cases) - Initiation projects (20% of funds, 1 year, $30k-$45k, eligible for renewal as

exploratory or demonstration projects)

Page 25: PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity (2000-2005) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.

25

PSERCNew Efforts

• Engaging experts from industry members

• Establishing field data repository for evaluation of new concepts

• Creating field demonstration site for PSerc “show-case”

• Providing financial means for moving from concepts to practice

• Branding and marketing PSerc T&D contributions