Top Banner
Pruneridge Avenue Complete Streets Plan Community Workshop Round 1 Thursday February 25, 2021 Saturday February 27, 2021
43

Pruneridge Avenue Complete Streets Plan

Dec 07, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Pruneridge Avenue Complete Streets Plan

Pruneridge AvenueComplete Streets Plan

Community Workshop Round 1

Thursday February 25, 2021 Saturday February 27, 2021

Page 2: Pruneridge Avenue Complete Streets Plan

Welcome

• Thank you for being here!

• Can’t stay the whole time? Connect with us via:

• Web: SantaClaraCa.gov/PruneridgeAvePlan

• Voicemail: (408) 320-7060

• Email: [email protected]

2

Page 3: Pruneridge Avenue Complete Streets Plan

Workshop Agenda1. Introductions2. Zoom meeting and PollEverywhere tutorial3. Question and Answers Session 14. Project Purpose5. Study Area Today6. Your Vision7. Question and Answer Session 28. Next Steps

3

Page 4: Pruneridge Avenue Complete Streets Plan

Introductions• City of Santa Clara Staff

– Michael Liw, Assistant Public Works Director

– Jonathan Yee, Transportation Manager

– Carol Shariat, Project Manager

• Alta Planning + Design– Jeff Knowles, Principal Planner

– Ryan Booth, Senior Designer

– Ben Frazier, Planner

4

Page 5: Pruneridge Avenue Complete Streets Plan

Why study Pruneridge?

• Included in the City’s General Plan and a high priority corridor in both City and County Bicycle Plans

• Implement the City’s Complete Streets Policy 18-8593– https://bit.ly/3bfkWO3

• Help achieve the goals of the City’s Climate Action Plan

• Enhance safety and comfort for all 5

Pruneridge Ave

Page 6: Pruneridge Avenue Complete Streets Plan

Plan Process

• Phase 1: Information Gathering and Community Survey – (YOU ARE HERE)

• Phase 2: Develop and Share Roadway Concepts– Community Workshops Round 2

• Phase 3: Public Draft Plan Review– Community Workshops Round 3

• Phase 4: City Council Review and Consideration

6

Page 7: Pruneridge Avenue Complete Streets Plan

Schedule

7

You are here

Page 8: Pruneridge Avenue Complete Streets Plan

Other ways to stay involved

1. WEB: SantaClaraCa.gov/PruneridgeAvePlan

2. SURVEY: www.surveymonkey.com/r/SCPruneridge

3. VOICEMAIL: (408) 320-7060

4. EMAIL: [email protected]

Page 9: Pruneridge Avenue Complete Streets Plan

How to use Zoom

9

Participants window allows you to change your name

When participating, rename yourself on the “participants tab.”(First name with last initial is okay)

Page 10: Pruneridge Avenue Complete Streets Plan

How to use Zoom

10

Question and Answer Open panel to ask question. Hosts will answer verbally or in the panel at scheduled times throughout the meeting.

Page 11: Pruneridge Avenue Complete Streets Plan

How to use ZoomRaise your hand if you would like to speak during the Q&A session. This will appear only during the Q&A session.

11

Raise Hand in the webinar if you want to make a comment or ask a question.

Page 12: Pruneridge Avenue Complete Streets Plan

PollEverywhere

Keep the page open – we will be turning on new polls throughout the presentation!Alternatively: Use your cell phone to text the word ALTAPLANNING107 to 22333

12

PollEv.com/altaplanning107

Page 13: Pruneridge Avenue Complete Streets Plan

How to access PollEverywhere

13

Page 14: Pruneridge Avenue Complete Streets Plan

How to access PollEverywhere

14

PollEv.com/altaplanning107

Page 15: Pruneridge Avenue Complete Streets Plan

15

PollEverywhere Test

This poll has closed.

To share your input, please take the online survey at: https://www.surveymonkey.com/r/SCPruneridge

Page 16: Pruneridge Avenue Complete Streets Plan

16

Poll 1

This poll has closed.

To share your input, please take the online survey at: https://www.surveymonkey.com/r/SCPruneridge

Page 17: Pruneridge Avenue Complete Streets Plan

17

Poll 2

This poll has closed.

To share your input, please take the online survey at: https://www.surveymonkey.com/r/SCPruneridge

Page 18: Pruneridge Avenue Complete Streets Plan

Question and Answer Session 1• Questions on Zoom or PollEverywhere?

18

Page 19: Pruneridge Avenue Complete Streets Plan

Why are we here?

1. The City has received grant funding from Caltrans to conduct atransportation study focused on ways to improve bicycle andpedestrian connections on Pruneridge Avenue.

2. The Plan will also look at ways to improve the comfort and safetyof drivers and local residents.

3. The Plan will collect data and conduct traffic, parking, andcollision analysis on the corridor.

4. The Plan will seek and record community input at multiple pointsin the process and share that feedback with City Council.

19

Page 20: Pruneridge Avenue Complete Streets Plan

Why are we here?

5. Community input and data will inform conceptual roadway designs.6. City Council will consider options and choose to move forward or not.7. No funding has been identified for any future phases

beyond this plan.

20

Page 21: Pruneridge Avenue Complete Streets Plan

How do we get there?• Consider a Complete Streets approach.• Complete Streets aim to promote:

– Safety

– Multiple modes of transportation

– Physical activity (more options to walk or bike)

– Cleaner air

– A more comfortable, inviting corridor21

Pruneridge Ave

Page 22: Pruneridge Avenue Complete Streets Plan

How do we get there?

22

• Complete Streets are streets for everyone, no matter whothey are or how they choose to travel.

• Complete Streets provide convenient, comfortable, andconnected transportation choices.

• Understanding context and community character areessential.

Page 23: Pruneridge Avenue Complete Streets Plan

How do we get there?

23

• Recommendations will be based on public input andtraffic analyses

• If bicycle lanes are recommended, we will evaluate

– Removing one (1) travel lane in each direction and install

center turn lane; or

– Removing on-street parking

Page 24: Pruneridge Avenue Complete Streets Plan

How will decisions be made?• The Plan will present to Council:

– Community input

– Technical analysis (traffic, parking, simulation modeling, etc.)

– Corridor improvements that meet the goals of the plan

• City Council will decide if and how the plan moves forward.• There is no funding dedicated to design or build any options right

now.

24

Page 25: Pruneridge Avenue Complete Streets Plan

Pruneridge Avenue 25

Study Area Today

Page 26: Pruneridge Avenue Complete Streets Plan

Pruneridge Avenue

• Roadway Characteristics– 3-mile east-west minor arterial street in south

Santa Clara

– 3 to 4 lane roadway

– Neighboring city connections:

• West Hedding in San Jose

• Apple Park in Cupertino

26

Page 27: Pruneridge Avenue Complete Streets Plan

Project Study AreaPomeroy Ave to Winchester Blvd

27

Study Area

Project Study Area

Page 28: Pruneridge Avenue Complete Streets Plan

West of Pomeroy Ave(Cities of Santa Clara and Cupertino)

28

• Completed in2012

• Converted 4-lanes to 2-lanes

• Retained parkingand stripedbicycle lanes

Pruneridge Ave

Page 29: Pruneridge Avenue Complete Streets Plan

East of Winchester Blvd(City of San Jose)

29

• Completed Fall2017

• Two vehicle lanesand a center turnlane

• Retained parkingand bicycle lanes

West Hedding Street

Page 30: Pruneridge Avenue Complete Streets Plan

Traffic Improvements on Pruneridge Avenue• 2012: Roadway reconfigured (shown on prior slide) by

removing travel lanes and using that space to create atwo-way center left-turn lane and bicycle lanes

• 2018: New traffic signal at Pruneridge/Cronin intersection• 2021: Bike improvements at Pruneridge/Lawrence

Expressway intersection (construction to start soon)30

Page 31: Pruneridge Avenue Complete Streets Plan

Your Vision

31

Page 32: Pruneridge Avenue Complete Streets Plan

32

Poll 3

This poll has closed.

To share your input, please take the online survey at: https://www.surveymonkey.com/r/SCPruneridge

Page 33: Pruneridge Avenue Complete Streets Plan

33

Poll 4

This poll has closed.

To share your input, please take the online survey at: https://www.surveymonkey.com/r/SCPruneridge

Page 34: Pruneridge Avenue Complete Streets Plan

34

Poll 5

This poll has closed.

To share your input, please take the online survey at: https://www.surveymonkey.com/r/SCPruneridge

Page 35: Pruneridge Avenue Complete Streets Plan

35

Poll 6

This poll has closed.

To share your input, please take the online survey at: https://www.surveymonkey.com/r/SCPruneridge

Page 36: Pruneridge Avenue Complete Streets Plan

36

Poll 7

This poll has closed.

To share your input, please take the online survey at: https://www.surveymonkey.com/r/SCPruneridge

Page 37: Pruneridge Avenue Complete Streets Plan

Question and Answer Session 2• Q&A on Plan elements, community engagement

opportunities, or anything else• Q&A rules• Have a comment not related to this project?

[email protected]

–(408) 615-3000 37

Page 38: Pruneridge Avenue Complete Streets Plan

Next Steps

38

• Corridor Traffic Analysis (Winter-Spring)

–Intersection delay analysis (adjusted for COVID)

–Parking study

• Conceptual Design Options (Spring-Summer)

– Can include parking or traffic lane removal

Page 39: Pruneridge Avenue Complete Streets Plan

Upcoming Events• Bicycle and Pedestrian Advisory Committee

(BPAC) Meeting – March 22nd at 4:00 PM• https://bit.ly/3k1z1mw

39

Page 40: Pruneridge Avenue Complete Streets Plan

Schedule

40

You are here

Page 41: Pruneridge Avenue Complete Streets Plan

Ways to stay involved1. Take the survey:

SantaClaraCa.gov/PruneridgeAvePlan2. Send us an email:

[email protected]. Call and leave a voice message: (408) 320-70604. Attend future community meetings

41

Page 42: Pruneridge Avenue Complete Streets Plan

Final Polls• Three question exit survey on PollEverywhere• We want to improve.

• Suggestions for future meetings? Email us at:

[email protected]

42

PollEv.com/altaplanning107

Page 43: Pruneridge Avenue Complete Streets Plan

Thank [email protected]

43(408) 320-7060 – voicemail only SantaClaraCA.gov/PruneridgeAveStudy

Pruneridge Ave