PROYEK PEMBANGUNAN GEDUNG MEDIK RS. ST. CAROLUS BORROMEUS JAKARTA PUSAT Tangerang, 19 Mei 2017
26
Embed
PROYEK PEMBANGUNAN GEDUNG MEDIK RS. ST. …sibima.pu.go.id/pluginfile.php/21958/mod_page/content/7/2017-02... · Kolom Pracetak Balok Pracetak Lantai Hollow Core Slab STRUKTUR ATAS
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PROYEK PEMBANGUNANGEDUNG MEDIK
RS. ST. CAROLUS BORROMEUSJAKARTA PUSAT
Tangerang, 19 Mei 2017
Basement 3 lapis
Lantai Podium 1 lapis
Lantai Tipikal 9 lapis
JUMLAH LANTAI
DATA TEKNIS
Kolom Pracetak
Balok Pracetak
Lantai Hollow Core Slab
STRUKTUR ATAS
Pondasi Inner Boring
Dinding Penahan Tanah PC Wall
STRUKTUR BAWAH
DATA TEKNIS
KOMPONEN PRACETAK
Kolom 368 buah
Balok 1038 buah
HCS (Hollow Core Slab) 2400 buah
JENIS DAN JUMLAH KOMPONEN PRACETAK
RS ST. CAROLUS (Elevation) - Original
RS ST. CAROLUS (Elevation) - Original
RS ST. CAROLUS (Elevation) - Pracetak
DATA PENYELIDIKAN TANAH
DATA PENYELIDIKAN TANAH
SISTEM PENAHAN TANAH
TAHAPAN PENGGALIAN
TAHAPAN PENGGALIAN
TAHAPAN PENGGALIAN
TAHAPAN PENGGALIAN
TAHAPAN PENGGALIAN
TAHAPAN PENGGALIAN
TAHAPAN PENGGALIAN
GALIAN BASEMENT
• Open Cut
RETAINING WALL SYSTEM
• PC Wall• Waller Beam• Diagonal Strutting
STRUKTUR BASEMENT
• Kolom pracetak• Balok pracetak• Sambungan kuat
LANTAI B1
Original Design Proposed Design (HCS)
MODIFIKASI SISTEM LANTAI
LANTAI 2
Original Design Proposed Design (HCS)
MODIFIKASI SISTEM LANTAI
STRUKTUR ATAS • Kolom pracetak• Balok pracetak• HCS• PRESSS