Top Banner
Provider Information Provider Information Verification Training Verification Training November 17, 2007 November 17, 2007 CDS Boardroom – 9am to CDS Boardroom – 9am to 11am 11am
23

Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Jan 04, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Provider Information Provider Information Verification TrainingVerification Training

November 17, 2007November 17, 2007CDS Boardroom – 9am to CDS Boardroom – 9am to

11am11am

Page 2: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Provider Kindergarten Readiness Rates

History:

The Florida Department of Education/State Board of Education is required by law (F.S. 1002.69(5)-(6)) to annually calculate a kindergarten provider readiness rate for EACH private or public school VPK provider for either the School-Year (540 hr.) or the Summer (300hr.) program.

Page 3: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

How it worksHow it works

The VPK Provider Kindergarten The VPK Provider Kindergarten Readiness Rate measures how well a Readiness Rate measures how well a provider prepares 4 year olds for provider prepares 4 year olds for kindergarten based on the Florida kindergarten based on the Florida VPK Education Standards.VPK Education Standards.

The Readiness Rate is based on the The Readiness Rate is based on the results of the statewide kindergarten results of the statewide kindergarten screening (FLKRS) for children screening (FLKRS) for children completing the VPK program.completing the VPK program.

Page 4: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

FLKRSFlorida

Kindergarten ReadinessScreener

• FLKRS is composed of two instruments:

1. A subset of the Early Childhood Observation System (ECHOS)

2. Two measurements of the Dynamic Indicators of Basic Early Literacy Skills (DIBELS)

Page 5: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Steps to achieving a Kindergarten Readiness

Rate 1. Become a certified VPK Provider2. Teach the child based on the VPK

Standards using your certified curriculum

3. Measure the effectiveness of what was taught to the child (FLKRS screening)

4. Verify the information is correct on the Kindergarten Readiness Rate Website

Page 6: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Verifying your information:

Beginning Beginning November 21, 2007November 21, 2007:: VPK Providers will be required VPK Providers will be required to confirm their 2006-2007 VPK to confirm their 2006-2007 VPK information on the Kindergarten information on the Kindergarten Readiness Rate WebsiteReadiness Rate Website

Providers will have until Providers will have until December 11, 2007December 11, 2007 to make to make any corrections neededany corrections needed

Page 7: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Getting Started…

1. Letters will go out from the Department of Education detailing instructions on how to access the Kindergarten Readiness Rate website and your username and password information.

2. Access the website:

https://vpk.fldoe.org3. Log in using your username and password4. Compare information in the Kindergarten Readiness

Rate website to your records for accuracy5. Submit any changes you make6. Contact the Early Learning Coalition with any questions

Page 8: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Step 1: Log in at https://vpk.fldoe.org. Use the four digit number on your letter as your username.

Input User Name and Password

* If you are a new VPK

Provider this year then

your password will

be: ready2008

Page 9: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Step 2: Click on ‘VPK Provider Verification of Children Served’

Select the VPK Provider Verification of Children Served

Page 10: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

STATUS

When you sign on - will be NOT STARTED .

Will change to SAVED as you save your changes.

Will change to SUBMITTED when you complete your review.

Click on VPK Provider Verification of Children Served 10

Step 3:Click on VPK Provider Verification of Children Served

Page 11: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Click - the button to accept the security agreement “Yes, I agree.”

11

Step 4: Click ‘Yes, I agree” to accept the security agreement

Page 12: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Enter the information to identify yourself.

Select the Next button to continue.

12

Step 5: Enter information requested

Page 13: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Note the Progress Bar - Step 1 of the verification (25% complete).

Enter the information requested.

13

Page 14: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

OPTIONAL FEATURES

You can assign children to a specific classroom (A, B, C…).

You can choose from the drop- down menu if you have information regarding the whereabouts of your VPK graduates.

15

Page 15: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Total Hours Enrolled = Paid and unpaid absences

Total Hours Absent = Paid and unpaid absences

Total Hours Attended = Total hours child was in class

% Completion - Automatically Calculated

Meeting Substantial Completion (70%) - Yes or No will appear

16

Page 16: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

When you complete your review and changes, select Submit.

17

Step 6: Submit your changes if you have any. If you made no changes still submit your information

Page 17: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

100% Complete!

18

Page 18: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Changes are complete.

Next Administrative Review

19

Page 19: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

What’s next?

After you are finished confirming your VPK information, the Coalition will review the changes made to ensure our records are accurate.

The Coalition will ‘Accept’ or ‘Decline’ the change you made based on our records

If we decline your change we will notify you to discuss options

Once the Coalition review is complete the Department of Education will also ‘Accept’ or ‘Decline’ the submitted changes

Page 20: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Each coalition reviews and either “Accepts” or “Declines” the changes submitted.

23

Page 21: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Other Information listed on site:

Yes / No indicators will be provided for child screenings.

Page 22: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

When will I get my Readiness Rates? Preliminary Rates Released:

January – February 2008

Providers will have 14 days to dispute their rates (ELCMC will keep providers updated)

State Board will adopt the minimum Readiness Rate: February 19, 2008 (Tentative)

Final rates released in late February (Tentative)

Page 23: Provider Information Verification Training November 17, 2007 CDS Boardroom – 9am to 11am.

Contact Information:Contact Information:

ELCMC: ELCMC: Michelle Roberts, VPK Michelle Roberts, VPK Provider Coordinator orProvider Coordinator or

Sherry Doyle, Finance Sherry Doyle, Finance DirectorDirector

Office: (352) 369-2315Office: (352) 369-2315

Fax: (352) 620-2519Fax: (352) 620-2519

Office of Early Learning Office of Early Learning Provider Help-Line:Provider Help-Line:

1-866-447-11591-866-447-1159

In partnership with: