EV S Protection and Substation Control Datum 09/97 Bearbeiter f. meisberger Dateinamel Landau.ppt Seite 1 von 14 Your Partner for Protection Systems Protection Technology
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 1 von 14
Your Partner for Protection Systems
Protection Technology
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 2 von 14
Your Partner for Protection Systems
The Purpose of Protection
but it can:Limit the damage caused by
short circuits
while: Protecting people and plant from
damage
Selectively clearing faults in miliseconds
Protecting plant from overload conditions
The protection can not prevent system faults,
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 3 von 14
Your Partner for Protection Systems
Tasks
Fast fast means, recognising and removing the fault in milliseconds
Safe safe means, always switching-off, when a fault appeares
Selectivity selectivity means, switching-off only the system elements,where the fault
had accoured.
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 4 von 14
Your Partner for Protection Systems
History
1950 1960 1970 1980 1990 2000
MOVING-COIL TECHNOLOGYANALOG TECHNOLOGY
DIGITAL TECHNOLOGY
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 5 von 14
Your Partner for Protection Systems
Why digital Protection?
Integration of the Protection functions for one feeder:
Feeder Protection Device
Example: Overhead line in medium voltage Distance Protection with I>> or U</I>-exitation
Three-pole reclosure
Wattmetric earth fault direction detection
Fault location
Event protocol
Fault recording
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 6 von 14
Your Partner for Protection Systems
Why digital Protection?
Self-supervision
Raising of the Availability
Plausibility control of the input values
Supervision of the A/D-Conversion
Internal Testing of the Computer systems (Watch-Dog)
Supervision of the memory chips
Testing the TRIP-Relay-coil
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 7 von 14
Your Partner for Protection Systems
Self-supervision Plausibility test of the input values e.g.:
IL1+IL2+IL3=k1xIE
UL1+UL2+UL3=k2xUE
Rotating-field control of the measurements Control of the Analog-Digital-
Conversion by comparison with conversed reference values
Hard- and Software supervision of the Microprocessor systems
Supervision of the two-canaled command-Relay
Direction testing with operational-values, test-TRIP, test- TRIP/CLOSE (not automatic)
x
A D
uP
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 8 von 14
Your Partner for Protection Systems
Why digital Protection?
Higher Information offer
Transparence of the incident history
Event protocol and fault recording give break-down
What has happened ?
What are the short circuit values (Transformer saturation) ?
When did the protection gave his Off-command ?
How long time needed the circuit-breaker ?
How big was the breaking current ?
How did the Network recover after switching-off ?
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 9 von 14
Your Partner for Protection Systems
Princip metod of operation
Analog input values
Analog-Digital-Conversion
Exitation
Protection programm Routine programm
Command- and Information outputs
yes no
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 10 von 14
Your Partner for Protection Systems
Analog measurement-values forming
Analog: the stability limits will be formed by comparison with analog reference values. These reference values can change themselves by component drifts.(Ageing).
Possible changing of set-values (Ageing)
analog
1I1U
U2
U1<U2 no exitation
U1>U2 exitation
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 11 von 14
Your Partner for Protection Systems
Digital measurement-values forming
Digital: the measurement value in one number will be conversed and with one number from the memory store compared.
Not possible changing of the set values (no Ageing)
digital
U1I1
A
D0 0 0 1 0 1 0 0 1 0 0 1
0 0 0 1 0 1 0 0 1 0 1 1
Mom.current 1,05A no exitationSet-value 1,10A
Mom.current 1,65A exitationSet-value 1,10A
Set values from EEprom
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 12 von 14
Your Partner for Protection Systems
Analog Device design
All functions, like exitation or timeing, will be processed from discrete, permanent madnetised single elements. The results will be converted as electric values from other elements.
The General function is the summ of few single functions with permanent magnetised Hardware. By testing each single function must be tested.
I
U
LEDI>>
I>/U<
inputs
Zones
Timing
Direction
Trip/close
Alarm
Lo
gic
in
str
uc
t io
n
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 13 von 14
Your Partner for Protection Systems
Digital Device design
All functions will be software moderated and processed on one hardware. With the results of the total operating time the output elements are directly controled.
The General function is the summ of the Software-single functions on one Hardware. Hard- and Software are supervisioned.
Port
Port
A
DI
U
Ari
thm
eti
c-l
og
ic u
nit
LED
.
Trip/close
Alarminputs
Single-board system
EV SProtection and Substation Control
Datum 09/97Bearbeiter f. meisbergerDateinamel Landau.pptSeite 14 von 14
Your Partner for Protection Systems
Protection System
The System is as strong as the weakest element!
Circuit breakerTransformer
Protection device Battery
Supply conducters
back to table of contents
Distance Protection