INTRODUCTION AND BACKGROUND
¨ On March 12, 2013, Trustees approved the 2013-2014, 2014-2015 and 2015-2016 calendars
¨ On April 29th, 2014, the 2015-2016 calendar was amended to align the School District’s Spring Break with other metro districts’ spring breaks
¨ At that meeting, staff indicated that Non-Instructional Days could change (Red Days)
SD35 Board of Educa/on Mee/ng April 28, 2015
BILL 36: SCHOOL AMENDMENT ACT
Section 87.02
£ A Board may, in accordance with the regulations of the Minister, amend a school calendar made available to the public by the Board under section 87.01(9) or (10) if, in the opinion of the Board an amendment is necessary
£ A school calendar amended under subsection (1) must comply with section 87.01(3) and the regulations of the Minister
SD35 Board of Educa/on Mee/ng April 28, 2015
If approved, the amended calendars would be made public by April 30, 2015 as per Bill 36 section 87.02(3)
87.02
£ The Board must, as soon as practicable and, in any event, within 30 days of amending a school calendar under subsection(1) make available to the public the amended school calendar
BILL 36: SCHOOL AMENDMENT ACT
SD35 Board of Educa/on Mee/ng April 28, 2015
APPENDIX A
SD35 Board of Educa/on Mee/ng April 28, 2015
RECOMMENDING CHANGES TO DAYS NOT IN SESSION
In the 2015-2016 calendar presentation on April 29, 2014:
£ Day not in session October 2 (School Improvement Day)
£ Day not in session November 2 (Design and Assessment/Report Card Prep)
£ Day not in session February 26 (Design and Assessment/Report Card Prep)
The days above have been redistributed to provide common collaborative time to school communities
SD35 Board of Educa/on Mee/ng April 28, 2015
RECOMMENDING CHANGES TO DAYS NOT IN SESSION
¨ In all proposed calendars except LEC, one full day Design and Assessment Day and one half-day School Improvement Day have been redistributed to create common collaboration times that are 75 minutes in length and occur six times throughout the school year
¨ Shareholders were consulted regarding the impact of late start times, including DPAC. As a result, collaboration time has moved to the end of the school day
SD35 Board of Educa/on Mee/ng April 28, 2015
APPENDIX B
SD35 Board of Educa/on Mee/ng April 28, 2015
CALENDARS TO BE REVIEWED APPENDIX C
£ Aldergrove Region
£ Elementary/Middle
£ Langley Fine Arts
£ Langley Fundamental Middle Secondary
£ Lochiel
£ Secondary Linear
£ Secondary Semester
SD35 Board of Educa/on Mee/ng April 28, 2015
PREVIOUS LIST OF PROPOSED CALENDARS
¨ Have common collaboration time
¨ Unified report card days
¨ Unified professional development days
¨ Unified 1 hour early dismissal days for Parent- Teacher Interviews
SD35 Board of Educa/on Mee/ng April 28, 2015
CALENDARS TO BE REVIEWED APPENDIX C
SD35 Board of Educa/on Mee/ng April 28, 2015
CALENDARS TO BE REVIEWED APPENDIX C (cont’d)
SD35 Board of Educa/on Mee/ng April 28, 2015
CALENDARS TO BE REVIEWED APPENDIX C (cont’d)
SD35 Board of Educa/on Mee/ng April 28, 2015
CALENDARS TO BE REVIEWED APPENDIX C (cont’d)
SD35 Board of Educa/on Mee/ng April 28, 2015
CALENDARS TO BE REVIEWED APPENDIX C (cont’d)
SD35 Board of Educa/on Mee/ng April 28, 2015
CALENDARS TO BE REVIEWED APPENDIX C (cont’d)
SD35 Board of Educa/on Mee/ng April 28, 2015
CALENDARS TO BE REVIEWED APPENDIX C (cont’d)
SD35 Board of Educa/on Mee/ng April 28, 2015
CALENDARS TO BE REVIEWED APPENDIX C (cont’d)
Douglas Park Community School
School community was consulted regarding an altered calendar
£ Reduced nine week summer vacation to seven weeks
£ Redistributed the two weeks into “intersessions”
£ Used the intersessions to provide recreational and learning opportunities for students
£ Collaboration days aligned with the rest of the District
£ School Improvement Day and Design and Assessment Day were used in the same way as previous calendars discussed
SD35 Board of Educa/on Mee/ng April 28, 2015
CALENDARS TO BE REVIEWED APPENDIX C (cont’d)
SD35 Board of Educa/on Mee/ng April 28, 2015
Langley Education Centre ¨ School timetable is a linear trimester model
¨ Traditional five day school week is redistributed to four days per week
¨ Collaboration time is embedded in the calendar but not at the same time as other schools in the District
¨ Traditional start and end times are shifted to a later start and end time to accommodate students that work during the day
CALENDARS TO BE REVIEWED APPENDIX C (cont’d)
SD35 Board of Educa/on Mee/ng April 28, 2015
CALENDARS TO BE REVIEWED APPENDIX C (cont’d)
SD35 Board of Educa/on Mee/ng April 28, 2015
¨ All school calendars have all been checked to make sure they comply with all relevant school calendar regulations
¨ All calendars meet the minimum hours of instruction per year:
K 853 1-7 878 8-12 952
MINISTRY REQUIREMENTS
SD35 Board of Educa/on Mee/ng April 28, 2015
¨ That the Board approves the school calendars for the 2015/2016 school year, as presented.
RECOMMENDED MOTION