Top Banner
PROPOSED RESIDENTIAL DEVELOPMENT 35-41 Dalgety Street, Oakleigh SUSTAINABLE MANAGEMENT PLAN & WATER SENSITIVE URBAN DESIGN RESPONSE FOR DALGETY PROPERTIES PTY LTD 19 March 2018 File 527CG
37

PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

Jul 22, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

PROPOSED RESIDENTIAL DEVELOPMENT

35-41 Dalgety Street, Oakleigh

SUSTAINABLE MANAGEMENT PLAN

&

WATER SENSITIVE URBAN DESIGN RESPONSE

FOR

DALGETY PROPERTIES PTY LTD

19 March 2018

File 527CG

Page 2: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 2 ©Ark Resources

CONTENTS

1. EXECUTIVE SUMMARY ................................................................................................................... 4

2. INTRODUCTION ............................................................................................................................... 4

3. RELEVANT POLICY REQUIREMENTS ............................................................................................ 5

4. SITE DESCRIPTION ......................................................................................................................... 7

5. SUMMARY OF KEY ESD INITIATIVES ............................................................................................ 8

6. GREEN STAR................................................................................................................................... 8

6.1. Green Star Criteria ............................................................................................................................ 9

6.2. Green Star Preliminary Design Rating ............................................................................................. 18

7. CONCLUSION ................................................................................................................................ 23

APPENDICES

APPENDIX 1: NATHERS ENERGY RATINGS ............................................................................................ 24

APPENDIX 2: STORM REPORT ................................................................................................................. 32

APPENDIX 3: WSUD MAINTENANCE MANUAL ........................................................................................ 34

APPENDIX 4: SOLAR PHOTOVOLTAIC SYSTEM ..................................................................................... 35

APPENDIX 5: SITE MANAGEMENT PLAN ................................................................................................. 37

Page 3: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 3 ©Ark Resources

Issue Date Prepared Approved Status

A 19 March 2018 KK / JS JT TP Issue

© Ark Resources 2018

The information contained in this document that has been produced by Ark Resources Pty Ltd is solely for the use of Ark Resources’ Client for the purpose for which it has been prepared and Ark Resources undertakes no duty to or accepts any responsibility to any third party who may rely upon this document.

All material contained in this report is subject to Australian copyright law. Copyright in the document is owned by Ark Resources Pty Ltd. No material from this document may, in any form or by any means, be reproduced, stored in a retrieval system or transmitted, without prior written permission from Ark Resources.

Any enquiries regarding the use of this report should be directed to:

ARK RESOURCES PTY LTD ABN 29 086 461 369 Suite 8, 10 Northumberland Street South Melbourne VIC 3205 Australia

P: +61 3 9636 0280 W: arkresources.com.au E: [email protected]

Page 4: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 4 ©Ark Resources

1. Executive Summary

The proposed mixed-use development at 35-41 Dalgety Street, Oakleigh has been designed to meet the

objectives of the City of Monash’s Environmentally Sustainable Development Policy (Clause 22.13 of the

Planning Scheme).

This report confirms that a combination of sustainable building management practices, design initiatives,

fixtures, systems, appliances, materials and finishes will be integrated into the building in order to attain a

4 star Green Star Design & As Built performance standard. The standard achieved is defined as Australian

Best Practice in terms of environmental design.

The development also meets the Best Practice standard for Urban Stormwater Quality and is therefore also

consistent with the City of Monash’s Water Sensitive Urban Design objectives.

The performance outcomes achieved by the proposed development demonstrate that the proposed

development meets the sustainable design objectives of Clause 22.13 of the Monash Planning Scheme.

2. Introduction

Ark Resources has been engaged by Dalgety Properties Pty Ltd to provide advice in relation to environmentally

sustainable development outcomes from the proposed mixed-use development at 35-41 Dalgety Street,

Oakleigh.

This report contains a summary of:

• Environmental objectives adopted for the development; and

• Sustainable design initiatives integrated into the design of the project.

Performance outcomes in this report are based on:

• Discussions and correspondence with:

o Ivana Avram – Senior Project Lead, Rothelowman

• Architectural plans prepared by Rothelowman set out below:

Description Drawing No. Revision Date

Basement 2 TP01.00 P1 19/02/2018

Basement 1 TP01.01 P1 19/02/2018

Ground Plan TP01.02 P1 19/02/2018

Level 1 TP01.03 P1 19/02/2018

Level 2 TP01.04 P1 19/02/2018

Level 3 TP01.05 P1 19/02/2018

Level 4 TP01.06 P1 19/02/2018

Level 5 TP01.07 P1 19/02/2018

Level 6 TP01.08 P1 19/02/2018

Level 7 TP01.09 P1 19/02/2018

South Elevation TP02.01 P2 19/02/2018

East Elevation TP02.02 P2 19/02/2018

Page 5: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 5 ©Ark Resources

Description Drawing No. Revision Date

West elevation TP02.03 P2 19/02/2018

North elevation TP02.04 P2 19/02/2018

Section A TP03.01 P1 19/02/2018

Section B TP03.02 P1 19/02/2018

Residential Development TP010.01 P1 19/02/2018

3. Relevant Policy Requirements Clause 22.13 Environmentally Sustainable Development of the Monash Planning Scheme is applicable to new

residential and non-residential developments.

The overarching objective of the policy is that development should achieve best practice in environmentally

sustainable development from the design stage through to construction and operation.

Clause 22.13-2 cites the following relevant policy objectives in relation to specific elements of sustainable

design:

Energy performance

o To improve the efficient use of energy, by ensuring development demonstrates design potential for ESD

initiatives at the planning stage.

o To reduce total operating greenhouse gas emissions.

o To reduce energy peak demand through particular design measures (e.g. Appropriate building orientation,

shading to glazed surfaces, optimise glazing to exposed surfaces, space allocation for solar panels and

external heating and cooling systems).

Water resources

o To improve water efficiency.

o To reduce total operating potable water use.

o To encourage the collection and reuse of stormwater.

o To encourage the appropriate use of alternative water sources (e.g. greywater).

Indoor Environment Quality

o To achieve a healthy indoor environment quality for the wellbeing of building occupants, including

the provision of fresh air intake, cross ventilation, and natural daylight.

o To achieve thermal comfort levels with minimised need for mechanical heating, ventilation and cooling.

o To reduce indoor air pollutants by encouraging use of materials with low toxic chemicals.

o To reduce reliance on mechanical heating, ventilation, cooling and lighting systems.

o To minimise noise levels and noise transfer within and between buildings and associated external

areas.

Page 6: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 6 ©Ark Resources

Stormwater Management

o To reduce the impact of stormwater run-off.

o To improve the water quality of stormwater run-off.

o To achieve best practice stormwater quality outcomes.

o To incorporate the use of water sensitive urban design, including stormwater re-use.

Transport

o To ensure that the built environment is designed to promote the use of walking, cycling and public transport,

in that order.

o To minimise car dependency.

o To promote the use of low emissions vehicle technologies and supporting infrastructure.

Waste management

o To promote waste avoidance, reuse and recycling during the design, construction and operation stages of

development.

o To ensure durability and long-term reusability of building materials.

o To ensure sufficient space is allocated for future change in waste management needs, including (where

possible) composting and green waste facilities.

Urban Ecology

o To protect and enhance biodiversity within the municipality.

o To provide environmentally sustainable landscapes and natural habitats, and minimise the urban heat

island effect

o To encourage the retention of significant trees.

o To encourage the planting of indigenous vegetation.

o To encourage the provision of space for productive gardens, particularly in larger residential developments

Page 7: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 7 ©Ark Resources

4. Site Description

The proposed development comprises:

• 96 apartments with 218 bedrooms

• 9 townhouses with 27 bedrooms

• Communal space on ground level

The building comprises the following uses:

Level Use

Basement 2 • Car parking

Basement 1 • Car parking, storage facilities, services, and bin store

Ground Floor • Main lobby, sub-station, bike parking, town houses (bedrooms), and residential apartments

Level 1 • Town houses (living areas), and residential apartments

Level 2 • Town houses (bedrooms), and residential apartments

Levels 3 – 7 • Residential apartments

Roof • Plant, and solar photovoltaic system

The site is located within the City of Monash.

The development site has an area of approximately 3,501m2 and currently contains a warehouse, two level

office space and associated carparking area. The surrounding buildings are a mix of residential and commercial

uses.

An image of the site and the surrounding locale is shown below.

Image ©Google Earth™ (accessed March 2018)

Page 8: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 8 ©Ark Resources

5. Summary of Key ESD Initiatives

The following key sustainable design initiatives have been incorporated into this project:

• Rainwater harvesting system for toilet flushing, bin washdown, and irrigation;

• A 16kWp solar photovoltaic system each tower rooftop;

• Integrated planter boxes and landscape zones;

• Communal residents’ space on ground level;

• High-performance glazing and energy efficient building services, appliances and fixtures; and

• Environmentally preferable internal finishes.

An assessment of sustainable design outcomes of the proposed development has been undertaken with Green Star Design & As Built and FirstRate (Version 5) benchmarking tools based on the proposed architectural design and the building services and materials initiatives considered feasible at this stage of the design process. The information presented in this report demonstrates that:

• The development will achieve a 4 star Green Star Design & As Built rating;

• The development will achieve a minimum average NatHERS energy rating of 6.5 stars;

• The development meets the Best Practice standard for stormwater quality – refer to Appendix 2 for

STORM Results.

6. Green Star

The Green Star Design & As Built (Version 1.2) tool has been used as a benchmarking framework for the

proposed scheme and demonstrates that the development has the preliminary design potential to achieve a 4

star standard1.

A detailed Green Star assessment has been undertaken to confirm the credits achievable by the proposed

scheme.

Please note that this analysis is based on the best information currently available in relation to the technical

and commercial feasibility of the initiatives proposed. Further investigation will be undertaken during design

development which may result in change to the package of initiatives specified in order to meet the 4 star Green

Star standard.

A certified Green Star Rating may be obtained by registering the project with the Green Building Council of

Australia (GBCA) immediately after practical completion. The Green Star certification process involves a

detailed independent review of design and as built documentation to confirm that the development is

constructed in accordance with the specific technical requirements of individual targeted Green Star credits.

The initiatives which contribute to the 4 star Green Star rating are detailed in Section 6.1 below.

1 Note that a minimum of 45 points must be achieved for a 4 star Green Star rating to be achieved. The development will attain a 4 star Green Star

standard however certification of the rating with the Green Building Council will not be undertaken.

Page 9: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 9 ©Ark Resources

6.1. Green Star Criteria

The key design elements and processes which underpin the preliminary Green Star rating are summarised in the table below. The design attributes will be incorporated

into the design in accordance with the technical criteria for each credit set out in the Green Star Design & As Built v1.2 Technical Manual.

Further information in relation to key performance outcomes is provided in the Appendices to this report as referenced in the right-hand column of the table.

Issue Performance Commitments / Description Comments

Indoor Environmental Quality

Passive Solar Design & Natural Ventilation

The following passive solar design strategies and building design features will be incorporated into the proposed design:

• Apartment layout design has been developed with regard to achieving adequate daylight amenity to all living spaces and bedrooms (i.e. shallow floorplates).

• The building form has been configured to ensure that majority of apartments have a north, east, or west orientation and therefore receive direct solar access.

• All living rooms and bedrooms have access to adequate daylight and natural ventilation through sufficient façade glazing and a combination of openable windows and sliding doors.

• Majority of the apartments will have effective cross flow ventilation within the dwellings.

• Common area corridors have been designed to extend to the façade to facilitate natural ventilation via operable windows.

These features above will improve internal amenity and maximise comfort for residents, reduce peak cooling demand and greenhouse gas emissions arising from mechanical cooling.

All apartments have annual NatHERS cooling loads below 21MJ/m2 which confirms that summer thermal comfort conditions are achieved.

Thermal Comfort Thermal comfort for occupants will be enhanced by the specification of high performance glazing.

Note that many apartments will receive direct sunlight due to the arrangement of apartments within each floor plate.

Page 10: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 10 ©Ark Resources

Issue Performance Commitments / Description Comments

Reduction of pollutants All interior paints, adhesives and sealants will be Low VOC type to improve indoor environmental quality for residents.

50% of paints by volume will be ultra-low VOC emission (maximum TVOC content of 5g/litre or less).

All engineered wood products will contain no or low levels of formaldehyde.

All refrigerants in the proposed development shall have a GWP of 10 or less, and an ODP of zero.

Low VOC paints, adhesives, and sealants will be specified to meet the requirements of Credit 13.1 of the Green Star Design & As Built tool, Version 1.2

The ultra-low VOC paint specification meets the innovation requirements of Credit 13.1 of the Green Star Design & As Built tool, Version 1.2

Formaldehyde emissions for engineered wood products will be specified to meet the requirements of Credit 13.2 of the Green Star Design & As Built tool, Version 1.2

Refrigerants will be specified to meet the requirements of Credit 29.0 of the Green Star Design & As Built tool, Version 1.2

Acoustic Comfort Internal noise levels in living and sleeping areas shall be <5dB above the lower figure in the range recommended in Table 1 of AS/NZS2107:2016.

These initiatives are in accordance with the requirements of Credit 10.1 of the Green Star Design & As Built tool, Version 1.2.

Building Energy Management

Energy Efficient Appliances All installed appliances will have an energy efficiency rating within 1 star of the best available at the time of tender.

Appliances will be specified during design development in order to meet nominated performance standards.

Energy Ratings The development is expected to achieve an average energy rating of 6.5 stars and a minimum 5.5 stars for each apartment and therefore meets the following Green Star Conditional Requirement:

Attain a development NatHERS area-weighted energy rating average of 6.5 stars and a minimum individual NatHERS energy rating of 5.5 stars for each apartment.

All townhouses will achieve an energy rating of 6.0 stars and above.

The development energy rating achieved exceeds the NCC 2016 energy efficiency requirements for Class 2 dwellings by 10% (based on total energy loads).

The development thus attains the minimum mandatory requirements for Green Star credit 15B.0 and also meets the Clause 55.07-1 standard for energy efficiency.

Refer to Appendix 1 for details of building fabric assumptions.

Page 11: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 11 ©Ark Resources

Issue Performance Commitments / Description Comments

Renewable Energy System The following renewable energy system will be installed:

• A total 16-kW peak solar photovoltaic system on the roof providing renewable energy to offset greenhouse emissions arising from common area energy usage of the development.

• Embodied ecological impacts of PV array and support racking will be reduced by over 20% through use of 300Wp 60-cell modules with efficiency over 20% greater than standard PV modules.

• Embodied impacts of PV modules will be further reduced by procurement from a manufacturer with an above average rating on the current version Silicon Valley Toxics Coalition Solar Scorecard.

The system is predicted to result in equivalent avoided greenhouse emissions of approximately 24 tonnes CO2-e each year.

Refer to Appendix 4 for details of proposed system capacity and panel numbers.

Heating & Cooling Space heating and cooling for living areas will be provided by reverse cycle heat pumps with a minimum energy star rating (heating mode) within 1 star of the best available at the time of tender.

Efficient reverse cycle units in conjunction with a thermally efficient building envelope are considered to be an environmentally acceptable method of conditioning apartments.

All installed air-conditioning equipment will be specified to meet the requirements of Credit 15B.1 of the Green Star Design & As Built tool, Version 1.2.

Domestic Hot Water Domestic hot water will be provided by an efficient central gas hot water system with a minimum appliance efficiency of 86% and a highly insulated circulating loop to reduce parasitic heat losses.

Car Park Ventilation To reduce greenhouse gas emissions from the apartment’s car park mechanical ventilation system energy use will be minimised by the use of a variable speed fan motor and appropriate controls including CO monitoring.

Page 12: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 12 ©Ark Resources

Issue Performance Commitments / Description Comments

Lighting Energy efficient lighting systems will be installed throughout the development including:

• LED lighting generally to apartments designed to achieve a maximum lighting power density 10% better than NCC requirements.

• LED or Compact fluorescent lights controlled with occupancy sensors and daylight sensors (as appropriate) to corridors and public areas.

• LED or compact fluorescent external lighting.

• An energy efficient car park lighting system comprising T5 fluorescent lamps with most lighting controlled according to motion sensors. The remaining lights will act as a “skeleton” lighting circuit and will be permanently lit.

• Lighting systems comprise flicker free luminaires and a Colour Rendering Index (CRI) greater than 80

• All outdoor lighting to comply with AS4282:1997 for light spill to inhabited boundaries. Note that external lighting for the development will be designed with the objective of preventing light spill to the night sky by ensuring that all external luminaires have an Upward Light Output Ratio of less than 5% (relative to its actual mounted orientation).

• Additionally, strategies to reduce glare to be incorporated into the design.

The lighting systems will be designed to meet the requirements set out in Credit 11.0, 27.0 and 27.1 of the Green Star Design & As Built tool, Version 1.2.

The glare reduction strategies will be designed to meet the requirements set out in Credit 12.0 of the Green Star Design & As Built tool, Version 1.2.

Water Management

Fire System Water Temporary storage for a minimum of at least 80% of the routine fire protection system test water and maintenance drain downs will be provided for re-use on site.

System to meet requirements for Credit 18B.5 of the Green Star Design & As Built tool, Version 1.2.

Rainwater Harvesting A rainwater harvesting system will be installed comprising:

• Rainwater harvesting from all roof areas (see Appendix 2 to for a mark-up of the rainwater collection areas)

• A total storage volume of 65,000 litres in tanks located in the basement levels:

o Apartment block – 50kL

o Townhouse block – 15kL

• Re-use of water for toilet flushing in all townhouses

• Re-use of water for toilet flushing in apartments with a combined total of 80 bedrooms

• Re-use of water for sub-soil landscape irrigation

• Re-use of water for bin wash down

Please refer to Appendix 2 for STORM rating report, and Appendix 3 for the preliminary WSUD maintenance program.

Page 13: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 13 ©Ark Resources

Issue Performance Commitments / Description Comments

Water Efficient Landscaping Where appropriate, water sensitive landscape design will be incorporated into the development by specifying a combination of the following:

• Drought tolerant and/or indigenous plant species that are best suited to local climate

• Water efficient sub-soil drip irrigation system with moisture sensors

• Re-use of harvested rainwater or third pipe supply for irrigation

These initiatives will ensure efficient use of water and also reduce the total potable water used for landscape works.

Irrigation systems will be specified to meet the requirements of Credit 18B.4 of the Green Star Design & As Built tool, Version 1.2.

Water Efficient fixtures Fixtures and appliances installed by the applicant will be within 1 star of the WELS ratings scheduled below:

Fixture/Equipment Type WELS Rating

Taps 6 Star

Urinals 6 Star

Toilet 5 Star

Showers 3 Star (>4.5 but <=6.0 L/min)

Clothes Washing Machines 5 Star

Dishwashers 6 Star

Water using fixtures will be specified during design development in accordance with this water efficiency performance standard.

Heat Rejection Water consumption in the proposed building will be reduced by nominating waterless heat rejection systems.

Heat rejection systems will be specified to meet the requirements of Credit 18B.3 of the Green Star Design & As Built tool, Version 1.2.

Stormwater Management

Stormwater Quality The development achieves a STORM score of 101% as a result of:

• The rainwater harvesting, and re-use system described in this report

• Onsite landscape areas that promote infiltration during storm events

Refer to Appendix 2 for the STORM rating results, Appendix 3 for the WSUD Maintenance Manual, and Appendix 5 for the preliminary Site Management Plan.

The STORM rating attained demonstrates that the development attains the Best Practice Standard for Urban Stormwater.

These results demonstrate how the project complies with the requirements set out in Standard B39 of the Planning Scheme (Clause 55.07).

Page 14: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 14 ©Ark Resources

Issue Performance Commitments / Description Comments

Reduced Peak Discharge Post-development peak discharge will not exceed pre-development peak discharge using either 1-year or 5-year ARI as appropriate – details to be provided during design development.

This initiative is in accordance with the requirements of Credit 26.1 of the Green Star Design & As Built tool, Version 1.2.

Sustainable Transport

Bicycle Facilities Readily accessible bicycle storage facilities have been provided to encourage bicycle use by residents, staff and visitors to the development by including:

• A total of 40 bike parking spaces allocated as follows:

o 30 bike spaces for residents; and

o 10 bike spaces for visitors

The bike parking facilities provided meet the ratios set out in Clause 52.34 of the City of Monash Planning Scheme and will encourage cycling by residents.

Walkability & Public Transport Access

The site attains a Walk Score® of 75 out of 100 which is defined as ‘Very Walkable’.

The development is within the vicinity of several amenities including restaurants, cafés, shops, Scotchmans Creek bike trail, and parks. Building occupants will accomplish most daily errands on foot.

The site in proximity to several public transit options:

• Train station: Oakleigh Railway Station (within 1000m)

• Bus routes: 624, 693, 802, 862 and 969 (within 500m)

The location of the development will facilitate walking and public transport in lieu of private vehicle use.

Building Materials

Environmentally Preferable Materials

The following environmentally preferable materials will be specified with the objective of reducing off-site environmental impacts and improving indoor environmental quality for residents:

• All interior paints, floor coverings, adhesives and sealants will be low VOC type

• All engineered wood products will be low formaldehyde type.

• Concrete mixes to incorporate reclaimed water, and a 30% reduction in Portland cement content (subject to structural constraints)

• Environmentally responsible steel design and procurement

• Specification of sustainable sourced timber (FSC or PEFC)

• Specification of common use PVC products that meet Best Practice Guidelines for PVC in the Built Environment

Low VOC paints, adhesives and sealants will be specified in accordance with the VOC limits set out in Credit 13.1 of the Green Star Design & As Built tool, Version 1.2.

Engineered wood and PVC products will be specified in accordance with the requirements of Credit 13.2 and 20.3 of the Green Star Design & As Built tool, Version 1.2.

Concrete, Steel and Timber products will be specified in accordance with the requirements of Credit 19B.1, 20.1 and 20.2 of the Green Star Design & As Built tool, Version 1.2.

Page 15: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 15 ©Ark Resources

Issue Performance Commitments / Description Comments

Waste Management

Operational Waste Management

The following waste management facilities will be provided in the development:

Enclosed bin store in basement 1 containing:

• 5 x 1,100 litre bins for residential general waste

• 5 x 1,100 litre bins for residential commingled recyclables

For details of waste management logistics and collection facilities, refer to the Waste Management Plan prepared by SALT.

This initiative is in accordance with the requirements of Credit 8A of the Green Star Design & As Built tool, Version 1.2.

Construction Waste Minimisation

A target recycling rate of 90% of construction and demolition waste has been adopted for the construction phase of the development to minimise the volume of waste to landfill. This will be achieved by the development of a comprehensive waste minimisation strategy including:

• Separation of all commercially viable recyclable waste streams

• Training in waste minimisation for all site staff and contractors to form part of site induction training.

• Record keeping of landfill waste and recyclable stream volumes to track performance against the 90% recyclable target.

• Quarterly reporting of volumes and percentages for each waste stream.

A dedicated recycling contractor will be engaged to facilitate separation of commercially viable recyclable waste streams in accordance with the target adopted.

The Construction & Demolition waste management plan will be in accordance with the requirements of Credit 22A of the Green Star Design & As Built tool, Version 1.2.

Land Use and Ecology

Sustainable Sites At least 75% of the total project site area was previous developed – the development site currently contains a single storey commercial building as shown in the image provided in Section 4 of this report, therefore Credit 24.1 point awarded.

Heat Island Effect Reduction

to meet the objectives of Credit 25.0, at least 75% of the entire site area will comprise of building or landscaping elements that reduce the impact of urban heat island effect. These objectives will be achieved by a combination of:

• Vegetation;

• Rooftop solar photovoltaic array

• Roofs and unshaded hard-scaping elements to have complaint Solar Reflectance Indices (SRI) as per the Credit criteria:

o SRI of 82 or more for roof <15o pitch

o SRI of 39 or more for unshaded hard-scaping elements

Page 16: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 16 ©Ark Resources

Issue Performance Commitments / Description Comments

Construction & Building Management

Green Star Accredited Professional

A registered Green Star Accredited Professional shall be involved in the project – from design through to practical completion. The GSAP will certify that the Green Star Benchmarking and ESD related targets have been achieved upon project completion.

This initiative is in accordance with the requirements of Credit 1.0 of the Green Star Design & As Built tool, Version 1.2and is achieved due to Ark Resources’ involvement in the project.

Conditional Requirements A comprehensive Design Intent Report will be prepared and will describe Building Operations and Maintenance of nominated building systems; and the metering and monitoring strategies incorporated into the development.

Provide floor-by-floor metering; plus, independent metering for all loads >5% of annual building energy use or 100kW; and metering for common water use consuming 10% of development’s water use

Comprehensive project-specific environmental management plan implemented during construction

These initiatives are in accordance with the requirements of Credit 2.0, 6.0 and 7.0 of the Green Star Design & As Built tool, Version 1.2.

Building Users Guide A Building Users Guide will be prepared and will provide details regarding the everyday operation of the building to enable building users to minimise energy and water consumption and optimise internal comfort and amenity.

In addition to the Building Users Guide, a detailed Design Intent Report shall be prepared including an overview of the Service and Maintainability Review of the proposed building systems.

The building users’ guide will be prepared in accordance with the requirements of Credit 4.2 of the Green Star Design & As Built tool, Version 1.2.

The Design Intent Report will be prepared in accordance with the requirements of Credit 2.0 and 2.1 of the Green Star Design & As Built tool, Version 1.2.

Air Tightness Testing Prior to handover, air tightness testing of 10% of apartments will be undertaken.

Microbial Control Legionella impacts from cooling systems will be minimised by incorporating appropriate strategies such nominating waterless heat-rejection systems.

This initiative is in accordance with the requirements of Credit 28.0 of the Green Star Design & As Built tool, Version 1.2.

Page 17: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 17 ©Ark Resources

Issue Performance Commitments / Description Comments

Metering In addition to individual apartment and commercial tenancy meters for utilities, the following meters will be installed to provide information to the owners’ corporation in relation to centralised building systems and common area energy consumption:

• Harvested rainwater supply line

• Gas meter for hot water plant

• Photovoltaic system generation meter

• Common area lift and lighting meter

• Car park lighting & power meter

The information collected from these meters will be used by the Owner’s Corporation manager to assess the function and efficacy of central systems during commissioning and ongoing operation.

The metering systems shall be installed in accordance with the requirements of Credit 6.0 of the Green Star Design & As Built tool, Version 1.2.

Environmental Management Plan

Prior to construction works, a project specific environmental management plan (EMP) shall be prepared by the Head Contractor.

The EMP shall comply with the NSW Environmental Management Systems Guidelines.

The EMP shall be prepared in accordance with the requirements of Credit 7.0 of the Green Star Design & As Built tool, Version 1.2.

Commissioning & Maintenance

All energy and water management systems set out in this report will be commissioned in accordance with the manufacturer’s specifications.

Ongoing maintenance and regular monitoring of building systems will be undertaken by building management staff to ensure effective and efficient ongoing operation of all centralised building systems set out in this report including the rainwater harvesting system.

Furthermore, an independent commissioning agent shall be appointed to provide commissioning advice, monitor and verify the commissioning of all building systems.

It is anticipated that the building manager will provide regular reports to the Owner’s Corporation members in relation to resource consumption and cost.

The commissioning and tuning process shall be conducted in accordance with the requirements of Credit 2.2, 2.3 and 2.4 of the Green Star Design & As Built tool, Version 1.2.

Green Star Innovation Credits

Credit 30B: Market Transformation – The objective of this initiative is to stimulate transformation of PV market through incentivising best-practice manufacturing practices, marketing and CSR reporting and promoting procurement of higher-efficiency modules. Embodied ecological impacts of PV array and support racking will be reduced by 20% through use of 300Wp 60-cell modules with efficiency 20% or greater than conventional PV modules.

Credit 30C: Exceeding Green Star Benchmarks – 50% of internal paints to be ultra-low VOC type (<5g/litre)

Page 18: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 18 ©Ark Resources

6.2. Green Star Preliminary Design Rating

Based on the design attributes and performance outcomes set out above, the following Green Star pathway

has been prepared which confirms that the development has the preliminary design potential to achieve a

4 star Green Star standard.

Project:Core Points

Available

Total Score

Targeted

Targeted Rating: TP Stage - Preliminary 100 45.1

CATEGORY / CREDIT AIM OF THE CREDIT / SELECTION CODE CREDIT CRITERIAPOINTS

AVAILABLE

POINTS

TARGETED

Management 14

Green Star Accredited

Professional

To recognise the appointment and active involvement of a

Green Star Accredited Professional in order to ensure that

the rating tool is applied effectively and as intended.

1.0 Accredited Professional 1 1

2.0 Environmental Performance Targets - Complies

2.1 Services and Maintainability Review 1 1

2.2 Building Commissioning 1 1

2.3 Building Systems Tuning 1 1

2.4 Independent Commissioning Agent 1

Adaptation and ResilienceTo encourage and recognise projects that are resilient to

the impacts of a changing climate and natural disasters.3.1 Implementation of a Climate Adaptation Plan 2

Building Information

To recognise the development and provision of building

information that facilitates understanding of a building's

systems, operation and maintenance requirements, and

environmental targets to enable the optimised

performance.

4.1 Building Information 1 1

5.1 Environmental Building Performance 1

5.2 End of Life Waste Performance 1

6.0 Metering - Complies

6.1 Monitoring Systems 1 1

7.0 Environmental Management Plan - Complies

7.1 Formalised Environmental Management System 1 1

7.2 High Quality Staff Support 1

8A Performance Pathway - Specialist Plan 1 1

8B Prescriptive Pathway - Facilities -

Total 14 8

Commissioning and

Tuning

To encourage and recognise commissioning, handover

and tuning initiatives that ensure all building services

operate to their full potential.

Green Star - Design & As Built v1.2 Scorecard

35-41 Dalgety Street, Oakleigh

4 Star - Best Practice

Commitment to

Performance

To recognise practices that encourage building owners,

building occupants and facilities management teams to

set targets and monitor environmental performance in a

collaborative way.

Metering and MonitoringTo recognise the implementation of effective energy and

water metering and monitoring systems.

Responsible Building

Practices

To reward projects that use best practice formal

environmental management procedures during

construction.

Operational Waste Performance Pathway

Page 19: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 19 ©Ark Resources

17

9.1 Ventilation System Attributes 1 1

9.2 Provision of Outdoor Air 2

9.3 Exhaust or Elimination of Pollutants 1 1

10.1 Internal Noise Levels 1 1

10.2 Reverberation 1

10.3 Acoustic Separation 1

11.0 Minimum Lighting Comfort - Complies

11.1 General Illuminance and Glare Reduction 1 1

11.2 Surface Illuminance 1 1

11.3 Localised Lighting Control 1 1

12.0 Glare Reduction - Complies

12.1 Daylight 2

12.2 Views 1 1

13.1 Paints, Adhesives, Sealants and Carpets 1 1

13.2 Engineered Wood Products 1 1

14.1 Thermal Comfort 1

14.2 Advanced Thermal Comfort 1

Total 17 9

Acoustic ComfortTo reward projects that provide appropriate and

comfortable acoustic conditions for occupants.

Indoor Environment Quality

Indoor Air QualityTo recognise projects that provide high air quality to

occupants.

Thermal ComfortTo encourage and recognise projects that achieve high

levels of thermal comfort.

Lighting ComfortTo encourage and recognise well-lit spaces that provide a

high degree of comfort to users.

Visual ComfortTo recognise the delivery of well-lit spaces that provide

high levels of visual comfort to building occupants.

Indoor PollutantsTo recognise projects that safeguard occupant health

through the reduction in internal air pollutant levels.

Page 20: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 20 ©Ark Resources

22

15A.0 Conditional Requirement: Prescriptive Pathway -

15A.1 Building Envelope -

15A.2 Glazing -

15A.3 Lighting -

15A.4 Ventilation and Air-conditioning -

15A.5 Domestic Hot Water Systems -

15A.6 Accredited GreenPower -

15B.0 Conditional Requirement: NatHERS Pathway - Complies

15B.1 NatHERS Pathway 16 5.5

15C.0 Conditional Requirement: BASIX Pathway -

15C.1 BASIX Pathway -

15D.0 Conditional Requirement: NABERS Pathway -

15D.1 NABERS Energy Commitment Agreement Pathway -

15E.0Conditional Requirement: Reference Building

Pathway-

15E.1 Comparison to a Reference Building Pathway -

16A Prescriptive Pathway - On-site Energy Generation -

16B Performance Pathway - Reference Building 2

Total 18 5.5

Transport 10

17A.1 Performance Pathway 0

17B.1 Access by Public Transport 3 1

17B.2 Reduced Car Parking Provision 1

17B.3 Low Emission Vehicle Infrastructure 1

17B.4 Active Transport Facilities 1

17B.5 Walkable Neighbourhoods 1

Total 7 1

Energy

Greenhouse Gas

EmissionsB. NatHERS Pathway

Peak Electricity Demand

ReductionPerformance Pathway

Sustainable Transport Prescriptive Pathway

Page 21: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 21 ©Ark Resources

Water 12

18A.1 Potable Water - Performance Pathway 0

18B.1 Sanitary Fixture Efficiency 1 1

18B.2 Rainwater Reuse 1 1

18B.3 Heat Rejection 2 2

18B.4 Landscape Irrigation 1 1

18B.5 Fire System Test Water 1 1

Total 6 6

Materials 14

19A.1 Comparative Life Cycle Assessment 0

19A.2 Additional Life Cycle Impact Reporting 4

19B.1 Concrete 3 1.5

19B.2 Steel 1

19B.3 Building Reuse 4

19B.4 Structural Timber 4

20.1 Structural and Reinforcing Steel 1 1

20.2 Timber Products 1 1

20.3Permanent Formwork, Pipes, Flooring, Blinds and

Cables1 1

Sustainable ProductsTo encourage sustainability and transparency in product

specification. 21.1 Product Transparency and Sustainability 3

22A Fixed Benchmark -

22B Percentage Benchmark 1 1

Total 12 5.5

Life Cycle Impacts Prescriptive Pathway - Life Cycle Impacts

Potable Water Prescriptive Pathway

Responsible Building

Materials

To reward projects that include materials that are

responsibly sourced or have a sustainable supply chain.

Construction and

Demolition WastePercentage Benchmark

Page 22: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 22 ©Ark Resources

6

23.0 Endangered, Threatened or Vulnerable Species - Complies

23.1 Ecological Value 3 1.1

24.0 Conditional Requirement - Complies

24.1 Reuse of Land 1 1

24.2 Contamination and Hazardous Materials 1 1

Heat Island EffectTo encourage and recognise projects that reduce the

contribution of the project site to the heat island effect.25.0 Heat Island Effect Reduction 1 1

Total 6 4.1

5

26.1 Stormwater Peak Discharge 1 1

26.2 Stormwater Pollution Targets 1

27.0 Light Pollution to Neighbouring Bodies - Complies

27.1 Light Pollution to Night Sky 1 1

Microbial Control

To recognise projects that implement systems to

minimise the impacts associated with harmful microbes in

building systems.

28.0 Legionella Impacts from Cooling Systems 1 1

Refrigerant ImpactsTo encourage operational practices that minimise the

environmental impacts of refrigeration equipment.29.0 Refrigerants Impacts 1 1

Total 5 4

10

Innovative Technology or

Process

The project meets the aims of an existing credit using a

technology or process that is considered innovative in

Australia or the world.

30A Innovative Technology or Process

Market Transformation

The project has undertaken a sustainability initiative that

substantially contributes to the broader market

transformation towards sustainable development in

Australia or in the world.

30B Market Transformation 1

Improving on Green Star

Benchmarks

The project has achieved full points in a Green Star credit

and demonstrates a substantial improvement on the

benchmark required to achieve full points.30C Improving on Green Star Benchmarks 1

Innovation Challenge

Where the project addresses an sustainability issue not

included within any of the Credits in the existing Green

Star rating tools. 30D Innovation Challenge

Global Sustainability

Project teams may adopt an approved credit from a Global

Green Building Rating tool that addresses a sustainability

issue that is currently outside the scope of this Green Star

rating tools.

30E Global Sustainability

Total 10 2

TOTALS AVAILABLE TARGETED

CORE POINTS 100 43.1

CATEGORY PERCENTAGE SCORE 43.1

INNOVATION POINTS 10 2.0

TOTAL SCORE TARGETED 45.1

Land Use & Ecology

Ecological ValueTo reward projects that improve the ecological value of

their site.

Sustainable Sites

To reward projects that choose to develop sites that have

limited ecological value, re-use previously developed land

and remediate contaminate land.

10

Emissions

StormwaterTo reward projects that minimise peak stormwater flows

and reduce pollutants entering public sewer infrastructure.

Light Pollution To reward projects that minimise light pollution.

Innovation

Page 23: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 23 ©Ark Resources

7. Conclusion This report provides details of a comprehensive package of sustainable design features which will be integrated

into the design and specification of the proposed development in order to improve environmental outcomes

during occupation.

In terms of performance outcomes, the analysis presented in this report demonstrates that the proposed

development:

• Will attain a 4 star Green Star standard based on the Design & As Built v1.2 rating tool

• Will attain the Best Practice standard for urban stormwater quality

• Will achieve an average NatHERS energy rating of 6.5 stars

In addition, all apartments:

• Will have cooling loads of less than 21MJ/m2.

The performance outcomes set out above confirm that the proposed development meets the relevant

performance measures set out in Clauses 22.13 of the Monash Planning Scheme.

Accordingly, the sustainable design outcomes from the proposed development are consistent with the

objectives of the City of Monash’s Environmentally Sustainable Development and Water Sensitive Urban

Design Policies (Clauses 22.12 and 55.07-5 of the Monash Planning Scheme).

Jan Talacko

Director

Page 24: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 24 ©Ark Resources

Appendix 1: NatHERS Energy Ratings

Bers Pro v4.3.0.2b (3.13) energy ratings have been undertaken for a representative sample of the apartments

and are summarised in the table below.

Apartment Star Rating Energy Demand (MJ/m2)

Total Heating Cooling

G04 6.2 118.5 108.6 9.9

G05 5.7 138.9 118.4 20.5

G07 5.7 137.5 124.3 13.3

G08 6.6 105.1 98.1 7.1

G10 7.1 88.0 68.2 19.8

G12 6.4 113.6 94.5 19.1

G16 5.9 130.8 110.9 19.8

105 7.8 66.3 56.0 10.3

106 6.3 115.6 103.3 12.3

109 5.8 133.6 117.9 15.7

110 7.7 71.2 61.5 9.7

205 7.8 67.7 57.6 10.1

206 7.3 82.9 69.2 13.7

214 6.7 103.7 87.8 15.9

216 6.4 108.7 93.0 15.7

314 6.4 112.3 93.2 19.1

404 7.2 87.1 75.7 11.4

406 7.1 89.8 69.0 20.8

412 6.6 106.5 85.7 20.7

602 5.6 141.5 125.4 16.1

603 5.9 125.1 108.8 16.3

605 7.6 73.6 64.5 9.1

608 6.2 121.6 100.6 20.9

609 5.5 143.9 126.3 17.5

Estimated Development Average

6.5 107.6 92.4 15.3

Page 25: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 25 ©Ark Resources

Townhouse Star Rating Energy Demand (MJ/m2)

Total Heating Cooling

TH1 6.2 119.3 100.0 19.3

TH 2 6.3 116.3 97.9 18.3

TH 6 6.1 124.0 105.4 18.6

TH 9 6.0 124.5 106.1 18.4

Please note that the sample of dwellings in the thermal performance analysis presented include all apartments

which are exposed to significant thermal loads.

The results of the modelling confirm that all apartments have a cooling load less than 21MJ/m2 (NaTHERS

Climate Zone 62 Moorabbin). All other apartments in the development are expected to have similar or lower

cooling loads.

Page 26: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 26 ©Ark Resources

BUILDING MATERIALS ASSUMPTIONS

APARTMENTS

Element Description Added R Value

Floor Type Suspended concrete slab

Floor Insulation 0mm Kingspan Kooltherm:

Underside of ground floor 40mm Kingspan K10 R1.9 R 1.9

50mm ISO Board:

Underside of suspended concrete floors shared with outside below

R1.66

Wall Insulation Precast concrete Lift & stairwell walls:

65mm bulk insulation R1.5 R 1.5

Lightweight party walls:

65mm Bulk insulation R1.5 R 1.5

Lightweight corridor walls:

90mm Bulk insulation R2.0 R 2.0

Precast concrete external walls:

Green 40 Foil Board with single air spaces (28mm battens)

R TOTAL

R 2.4

Lightweight external walls:

90mm HD Bulk insulation R2.5 R 2.5

Roof Insulation Concrete ceiling/roof

80mm Kingspan K10 R 4.0

All apartment concrete ceilings shared with terraces above:

75mm ISO Board R2.5 R 2.5

Window Frames Aluminium frames to all windows and glazed doors

Sky Lights Nil

External Blinds Screens and shading as per elevations

Page 27: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 27 ©Ark Resources

TOWNHOUSES 1-9

Element Description Added R Value

Floor Type Suspended timber

Floor Insulation TH 9 garage soffit

Bulk insulation R4.0 R 4.0

TH 1,2 and 6 garage soffits

Bulk insulation R3.5 R3.5

Wall Insulation Lightweight party walls:

65mm Bulk insulation R1.5 R 1.5

Precast concrete external walls:

Green 40 Foil Board with dual air spaces (15 and 28mm battens)

R TOTAL

R 2.8

Lightweight external walls – level 2

90mm HD Bulk insulation R2.5 R 2.5

Garage walls adjacent to stairs

90mm bulk insulation R2.5 R2.5

Roof Insulation Townhouse 9

Metal sheet deck

R5.0 bulk insulation + Anticon 60 reflective blanket under roof sheeting

Ceiling R5.0

Roof R 1.3

Townhouse 1, 2 and 6

Metal sheet deck

R4.0 bulk insulation + Anticon 60 reflective blanket under roof sheeting

Ceiling R4.0

Roof R 1.3

All ceilings shared with terraces above:

Bulk insulation R3.5 R3.5

Window Frames Aluminium and thermally broken frames to all windows and glazed doors – see specifications below

Sky Lights Nil

External Blinds Screens and shading as per elevations

Page 28: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 28 ©Ark Resources

GLAZING VALUES

The energy rating software accredited by the Australian Building Codes Board contains a relatively limited

library of window systems. When the glazing systems specified are not available in the software, the protocol

requires that the glazing type which most closely matches the specified glazing is selected for the purpose of

calculating the energy rating.

The table below sets out the glazing specified on the architectural drawings together with the glazing input for

the purposes of calculating the energy rating.

The whole of window U – Value must be equal or lower than the energy rating software value and the whole of

window SHGC – Value must be within +/-5% of the energy rating software value.

Glazing Type Whole of Window Value Location

Capral – 419 Flushline Series Fixed U SHGC

CAP-055-52 Double glazed LowE

6mm Clear/12mm Argon gap/6mm Energy Advantage

2.71 0.58

All assessed apartments as specified

TH2 Ground and Level1

Capral – 35 Series Awning U SHGC

CAP-051-06 Double glazed

6mm Energy Advantage/12mm Argon gap/6mm Clear

4.42 0.41

All assessed apartments as specified

TH2 Ground and Level1

Capral – 900 Series Sliding U SHGC

CAP-057-13 Double glazed

6mm Energy Advantage/12mm Argon gap/6mm Clear

3.19 0.48

All assessed apartments as specified - except G16

TH2 Ground only

Glazing Type Whole of Window Value Location

Capral – 419 Flushline Series Fixed U SHGC

CAP-055-20 Double glazed

6mm Grey/12mm Air gap/6mm Energy Advantage 2.91 0.35

All assessed apartments as specified

Capral – 35 Series Awning U SHGC

CAP-051-13 Double glazed

6mm Energy Advantage Grey/12mm Air gap/6mm Clear

4.61 0.24

All assessed apartments as specified

Capral – 900 Series Sliding U SHGC

CAP-057-25 Double glazed

6mm Energy Advantage Grey/12mm Air gap/6mm Clear

3.36 0.27

All assessed apartments as specified

Page 29: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 29 ©Ark Resources

Glazing Type Description Whole of Window Value Location

Capral – Thermally Broken Futureline 440 Series Fixed

U SHGC

Specified Glazing

CAP-113-04 Double glazed

6mm EnergyTech Clear/12mm Argon/6mm Clear

2.00 0.55 TH 1,6 and 9 all specified glazing

Apartment 603

Energy Rating Software Equivalent

THC-040-10 Thermeco EC400FL Double glazed

5mm EnergyTech/20mm Argon gap/5mm Clear

2.01 0.55

Capral – Thermally Broken Futureline 54W Series Awning

U SHGC

CAP-116-04 Double glazed

6mm EnergyTech Clear/12mm Argon/6mm Clear 2.87 0.39

TH 1,6 and 9 all specified glazing

Apartment 603

Capral – Thermally Broken Futureline Lift & Slide Door

U SHGC

Specified Glazing

CAP-133-07 Double glazed

6mm EnergyTech Clear/12mm Argon/6mm Clear

2.40 0.46 TH 1,6 and 9 all specified glazing

TH2 Level 1

Apartment 603

Apartment G16

Energy Rating Software Equivalent

AWS-037-28 731 TH Sliding door DG

6.38mm Comfortplus Clear/12mm Argon gap/6mm Clear

2.48 0.45

Glazing Type Description Whole of Window Value Location

Capral – Thermally Broken Futureline 440 Series Fixed

U SHGC

Specified Glazing

CAP-113-14 Double glazed

6mm Comfortplus Grey/12mm Air/6mm Clear

2.20 0.38

TH 1, 2, 6 And 9 Level 2

Apartment 603 Energy Rating Software Equivalent

G2D-003-04 PW96 TB Fixed DG

6mm Grey/9mm Argon gap/6mm Low e

2.28 0.38

Capral – Thermally Broken Futureline 54W Series Awning

U SHGC

Specified Glazing

CAP-116-13 Double glazed

6mm EVantage Grey/12mm Air/6mm Clear

3.10 0.22

TH 1, 2, 6 And 9 Level 2

Apartment 603 Energy Rating Software Equivalent

AWS-035-29 TH Awning DG

6mm Evan Grey/12mm Air gap/6mm Clear

3.10 0.23

Page 30: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 30 ©Ark Resources

Glazing Type Description Whole of Window Value Location

Capral – Thermally Broken Futureline Lift & Slide Door

U SHGC

Specified Glazing

CAP-133 Double glazed

6mm EnergyTech Grey/12mm Air/6mm Clear

2.70 0.30

TH 1,2 ,6 and 9 level 2 Energy

Rating Software Equivalent

AWS-037-04 731 TH Sliding door DG

4mm Az/12mm Air gap/4mm EnergyTech

2.74 0.30

AUTOMATED CORRIDOR VENTILATION

All apartment corridors incorporate a source of natural light and ventilation in accordance with the Victorian

Better Apartment Design Standards 2017. Operable glazing in corridors will be automatically actuated so as to

optimise thermal conditions and indoor air quality in accordance with the following control logic.

Page 31: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 31 ©Ark Resources

GENERAL RATING ASSUMPTIONS

Item Details

Floor Coverings • Tiles to bathrooms,

• Carpet to bedrooms,

• Timber boards to all other areas

Window Coverings

• Holland blinds to all windows. (Regulation Mode)2

Draught Proofing • Weather strips to all entry & external doors and windows.

• Seal all exhaust fans.

Down lights • Recessed down lights in ceiling /roof space to be fitted with fire proof unvented down light covers (external roof areas only) to provide air tightness and contact with insulation

General • All party walls are classed as neighbour walls.

Shading • Overshadowing from adjoining buildings has been incorporated into the energy ratings

Ceiling Calculation

• Calculation for loss of ceiling insulation due to down lights, exhaust fans, ceiling speakers etc. have been incorporated into the energy rating where applicable

NOTES

Apartments: Class 2 Dwellings

1. Changes to any of the above stated specifications may affect energy performance and invalidate the

energy ratings detailed in this report.

2. Sealing of gaps and cracks: inadequate sealing of gaps and cracks can negatively affect the energy

performance of a dwelling. Provide sealing in accordance with NCC 2016 Part J3.

Townhouses 1 – 9: Class 1 Dwellings

1. Changes to any of the above stated specifications may affect energy performance and invalidate the

energy ratings detailed in this report.

2. Sealing of gaps and cracks: inadequate sealing of gaps and cracks can negatively affect the energy performance of a dwelling

NCC 2016 vol. 2 Part 3.12.3 requires that seals are to be provided to:

a) Chimneys and flues b) Roof lights i.e. skylights or windows installed in a roof c) Around external doors and windows and d) Exhaust fans

3. Changes to any of the above stated specifications may affect energy performance and invalidate the energy

ratings detailed in this report.

4. Sealing of gaps and cracks: inadequate sealing of gaps and cracks can negatively affect the energy

performance of a dwelling. Provide sealing in accordance with NCC 2016 Part J3.

2 Holland blinds are assumed as required by VBA Practice Note 55 (Clause 5.2). This assumption is for regulatory purposes only.

Page 32: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 32 ©Ark Resources

Appendix 2: STORM Report

Page 33: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 33 ©Ark Resources

RAINWATER CATCHMENT AREAS

Page 34: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 34 ©Ark Resources

Appendix 3: WSUD Maintenance Manual

Rainwater Harvesting System Maintenance Program

Once installed, the owners’ corporation maintenance contractor will implement a systematic maintenance

program to ensure the rainwater harvesting system operates as designed and water quality is maintained. The

scope of the maintenance program will include inspection and rectification of issues associated with:

• Roof gutters and downpipes

• First flush screens and filtration devices

• Pumps

• Distribution pipework and reticulation systems

• Overflow systems

Inspections of the system and any maintenance works required will be undertaken on a quarterly basis.

The rainwater harvesting system will be installed in accordance with the guidelines set out in the Rainwater

Design & Installation Handbook published by the National Water Commission3. A schematic diagram of the

rainwater tank installation is provided below.

3 Rainwater Design & Installation Handbook, National Water Commission, 2008

Page 35: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 35 ©Ark Resources

Appendix 4: Solar Photovoltaic System

35-41 Dalgety Street, Oakleigh Input

Calculated

Step Control

Data

Total number of bedrooms 219

Average number of people per bedroom 1.1

Total occupants 241

Photovoltaic System

Electricity gas emissions factor, NG [2] kg_CO2-e/kWh 1.19 Scope 2 and 3

PV Melbourne energy delivery MWh/y per kWe 1.23 at 10° tilt

PV capacity required kWe 16.7

Proposed PV module rating Wp 300

Efficiency improvement over traditional

250W module 20.0%

Typical dimensions for 60-cell module Width (m) x length (m) 1.0 x 1.6

Number of panels required rounded up 56

Expected electricity produced KWh/day 61.1

Annual expected electricity produced KWh/yr 22,298

Equivalent Solar Hot Water System

Required solar contribution % 29% 29 variable by 5% steps

To be supplied by solar water heaters MJ / day 905

Solar radiation, Melbourne, optimum angle MJ / day / m2 annual ave. 17.2

Collector Type: Flat Plate Evac. Tube

Solar water heater efficiency annual average 55% 70%

Delivered energy into water MJ / day / m2 annual ave. 9.5 12.0

Solar water heater collector area required m2_aperture area 95.7 75.2

Solar water heater area / panel m2_aperture area / panel 1.86 1.67

Number of panels required rounded up 52 45

Typical collector dimensionswidth (m) x length (m)width = along header direct ion 1.0 x 2.0 1.1 x 2.2

Indicative water storage volume req'd litres 4,780

Supplementary Heat Input to DHW

From supplementary source(s) MJ / day 2,271

Expected performance eff'y annual average 75%

Energy input to supplementary source(s) MJ / day 3,028

Annual expected solar energy contribution GJ/y 330.4

Natural gas use reduction from solar GJ/y 440.6

Greenhouse gas emissions factor, NG [1] kg_CO2-e/GJ 55.3 Scope 1 and 3

Greenhouse gas emissions reduction tonnes_CO2-e/yr 24.36

[1] National Greenhouse Accounts (NGA) Factors, August 2016, tables 2 and 38

[2] National Greenhouse Accounts (NGA) Factors, August 2016, table 41 "Latest", "Victoria"

Page 36: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 36 ©Ark Resources

INDICATIVE SOLAR PHOTOVOLTAIC ARRAY LAYOUT

High-efficiency solar PV modules with a total capacity of 16kWp per Tower will be installed at roof level as per

the preliminary layout indicated below.

Each PV module will be oriented northwards at 10-15° tilt and have at least 300Wp capacity (i.e. 20% more

efficient than traditional 250Wp 60-cell modules) – mounted on the roof with a minimum 600mm row spacing.

High-efficiency modules deliver more compact arrays and this dematerialisation results in inherently lower

embodied ecological impact per unit of generation than standard efficiency modules. The solar PV modules will

further be procured from a manufacturer with an above average rating in the SVTC Solar Scorecard.

Indicative solar photovoltaic array layout

The estimated total yield of this array will be 22MWh per annum equating to an annual carbon emissions

abatement of approximately 24 tonnes CO2-e per annum.

Page 37: PROPOSED RESIDENTIAL DEVELOPMENT · Section A TP03.01 P1 19/02/2018 Section B TP03.02 P1 19/02/2018 Residential Development TP010.01 P1 19/02/2018 3. Relevant Policy Requirements

35-41 Dalgety Street, Oakleigh Sustainable Management Plan 19 March 2018

File: 527CG 37 ©Ark Resources

Appendix 5: Site Management Plan

The objective of this Site Management Plan is to minimise the risks and impacts of stormwater pollution on

nearby waterways during construction works.

The key pollutants at risk of entering the stormwater system during the construction phase include:

• Sediments such as soil, sand, gravel, mud and concrete washings;

• Oil, foam, scum, grease, and other chemicals; and

• Litter, stones, debris etc.

These pollutants arise from several factors such as dirt from construction vehicles, erodible stockpiles located

close to surface runoff flow paths, and surface runoff from disturbed areas during earthmoving and construction

works. It is therefore important to integrate measures that minimise the pollutant loads entering stormwater

system during construction.

The following stormwater management strategies will be implemented during the construction phase to mitigate

the impacts of the pollutants above on the stormwater system:

• A project specific Erosion and Sediment control plan will be prepared in accordance with the guidelines set out in:

o Best Practice Erosion and Sediment Control (International Erosion Control Association Australasia, 2008); and

o Reducing Stormwater Pollution from Construction Sites (EPA Victoria, 2005).

• The Erosion and Sediment plan will form part of the Environmental Management Plan described in Section 6.1 of this report. This initiative will reduce the impacts of sediments on the stormwater system during construction works upon implementation.

• Installation of appropriate onsite erosion and sediment control measures. All installed control measures shall be regularly inspected & maintained to ensure their effectiveness. Such measures may include (but not limited to):

o Silt fences

o sediment traps

o hay bales

o geotextile fabrics

• Where possible, waste bins or skips with a lid or cover will be used to prevent litter from getting blown away and potentially entering stormwater drains.

Additionally, the following work practices shall be adopted to reduce stormwater pollution:

• Site induction to make personnel aware of stormwater management measures in place;

• Employ measures to reduce mud being carried off-site into the roadways such as installing a rumble grid/ gravel/ crushed-rock driveway (or equivalent measure) to provide clean access for delivery vehicles, removing mud from vehicle tyres with a shovel etc.;

• Safe handling and storage of chemicals, paints, oils and other elements that could wash off site to prevent them from entering stormwater drains; and

• Where practicable, stockpiles will be covered, located within the site’s fence and away from the lowest point of the site where surface runoff will drain to. This initiative will minimise erosion.

Accordingly, the measures presented above are considered appropriate for the proposed development at this stage of the project. The measures will reduce the pollutants entering stormwater system from the site during construction works thereby protecting waterways.

Furthermore, the initiatives above are consistent with the Application Requirements set out in the WSUD Policy

of the Monash Planning Scheme.