I H G F E D C B A -3,080 Upper Basement ±0 Ground Floor +3,155 Level 1 +6,115 Level 2 +9,075 Level 3 +12,035 Level 4 +14,995 Level 5 +17,955 Level 6 +20,915 Level 7 +23,875 Level 8 +26,835 Level 9 +29,795 Level 10 +32,755 Level 11 +35,715 Level 12 +38,895 Roof 2.02.11 Existing Balustrade Demolition 2.02.22 Existing ACM Parapet Capping Demolition 2.02.06 Existing Upper Storey Joinery Demolition 2.02.22 Existing ACM Parapet Capping Demolition 2.02.11 Existing Balustrade Demolition 2.02.07 Existing Podium Level Joinery Demolition 2.02.07 Existing Podium Level Joinery Demolition 2.02.21 Existing ACM Cladding Demolition 2.02.22 Existing ACM Parapet Capping Demolition 2.02.22 Existing ACM Parapet Capping Demolition Approximate outline of existing neighbouring builiding dashed Approximate outline of existing neighbouring builiding dashed Approximate outline of existing neighbouring builiding dashed Approximate existing Volcanic Viewshaft infringement hatched. Refer proposed Elevations for extent of proposed minor change. HOBSON STREET E10 Volcanic Viewshaft 06 E10 Volcanic Viewshaft 05 E10 Volcanic Viewshaft 05 E10 Volcanic Viewshaft 04 E10 Volcanic Viewshaft 03 E10 Volcanic Viewshaft 06 Notes 2 SITE 2.02.06 Existing Upper Storey Joinery Demolition Remove existing aluminium joinery from level 1 to level 12 to Eastern Elevation (Hobson Street façade), Western Elevation (Podium façade), Northern Elevation (Podium façade) and dispose off site. Including steel wall framing and linings over to the underside of the floor above. 2.02.07 Existing Podium Level Joinery Demolition Remove all existing podium level aluminium joinery, where affected by the new podium membrane works and dispose off site. 2.02.11 Existing Balustrade Demolition Remove existing aluminium and glass infill handrails to decks on level 1 to level 12 to Eastern Elevation (Hobson Street façade), Western Elevation (Podium façade), Northern Elevation (Podium façade) and dispose off site. 2.02.21 Existing ACM Cladding Demolition Remove existing ACM alucobond cladding from level 1 to level 12 to Eastern Elevation (Hobson Street façade), Western Elevation (Podium façade), Northern Elevation (Podium façade) and dispose off site. 2.02.22 Existing ACM Parapet Capping Demolition Remove existing ACM cladding at roof level, forming the parapet roof capping, to Eastern Elevation (Hobson Street façade), Western Elevation (Podium façade), Northern Elevation (Podium façade) and dispose off site. 02-1 Ex1 North Elevation - Existing 1:100 Note: Refer RC-30 for Plan View of Volcanic View Shafts crossing over building RevID Issue ChID Comments Date 01 02 Resource Consent Issue Resource Consent Issue 02-1 Existing Roof Height Adjusted to Survey 08-Nov-18 22-May-19 rev n#: dwg n#: drawn: checked: job n#: date created: date plotted: issue: scale: @A1 NOTE: Drawings are ½ scale @ A3 RC 22-May-19 22-May-19 RA187 MB RC-22 CAD ref: MarkBZ:\Projects\100-1000\187 - BBCL 3488047 Imperial Gardens\3. RC\RA187 Imperial Gardens_ RC.pln sheet title: North Elevation - Existing project title: Proposed Remedial Works for: Imperial Gardens Apartments for: Body Corporate 348047 135 Hobson Street Auckland CBD, Auckland DESIGN AND DRAWINGS ARE COPYRIGHT OF CREATIVE ARCH LTD CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK ALL RESTRICTED BUILDING WORK TO BE CARRIED OUT BY LICENSED BUILDING PRACTITIONERS LBP# BP101470 Level 2, 33 Sale Street Freemans Bay PO Box 78 282 Grey Lynn Auckland p:+64 9 368 2130 f: +64 9 309 6035 [email protected] www.resolutionarch.co.nz 02 MC RESOURCE CONSENT ISSUE ONLY