N Sutton New Hall Cemetery LINDRIDGE ROAD LINDRIDGE ROAD Proposed Contractors site entrance. Existing Cemetery entrance . Existing storm water drain approx. invert 950mm below ground level. C90/60 Existing storm water drain approx. invert 950mm below ground level. C90/60 Assumed foul drainage. Location of foul drainage manhole. x 108.5 x 108.5 x 108.25 x 108.25 x 108.25 x 108.0 x 107.5 x 107.85 x 105.75 x 109.0 x 111.5 x 110.5 x 112.16 x 111.65 x 113.10 x 113.25 x 114.35 x 117.25 x 120.0 x 114.35 x 110.6 x 116.35 x 117.25 x 116.85 x 117.15 x 117.0 x 117.15 x 116.85 x 117.0 x 117.0 x 125.65 x 124.85 x 123.8 x 122.75 x 122.29 x 120.87 x 118.84 x 122.75 x 125.9 x 126.65 10 CR2 x 117.2 x 116.85 x 116.9 x 113.75 5 4 2 3 6 7 1 8 CR1 9 CR3 11 12 13 14 15 16 19 17 18 20 54 21 52 53 51 49 22 23 24 26 25 27 28 29 30 32 31 33 34 35 36 37 38 39 40 41 42 43 44 46 45 48 47 50 x 119.89 x 124.75 Existing storm water culvert from drainage ditch to pool. Existing drainage ditch. Existing drainage ditch. EP EP EP EP EP EP EP EP EP EP Existing Swale Enlarged Proposed Future Swale for Phase 4 Swale Fenced soil storage area, see Landscape Drawing 80156de1. Sections 6 & 7. C90/7 Sections 4 & 5. C90/7 New road. C90/7 Widened road. C90/7 Cemeteries future soil storage area. Height of spoil not to exceed height of hedgerow approx. 2 metres. Swales service access road required until Phase 4 roads built. x 112.25 KEY Indicates proposed Levels ("x" = spot point) Cemetery Boundary Phase 1 Boundary Phase 2 Boundary (Muslim) Phase 3 Boundary Phase 4 Boundary Overhead wires Indicates future Roads (not in this contract). Phase 1 foul drainage crossing new phase New post and rail fencing. Tap, gully and Bin Position Indicates road re-alignment Proposed Drainage crossing Phase 4 New tarmac paving construction with surface dressing. Q22/115C New tarmac road construction. Q22/110A Block paving. Q24/111A New tarmac road construction with resin bonded chippings overlay. Q22/110D Indicates Grave header Indicates Grave Liner @A1 73170-021_Project Master Plan PROJECT CHKD CHECKED O:\73170\Architectural\Drawings\Working Drawings REV DESCRIPTION DATE DRN CLIENT SCALE DRAWING DRAWN JOB NUMBER DATE FILE NAME DRAWING NUMBER REVISION COPYRIGHT ALL DIMENSIONS TO BE CHECKED ON SITE NO DIMENSIONS TO BE SCALED FROM THIS DRAWING RELEVANT CONSULTANTS DRAWINGS THIS DRAWING IS TO BE READ IN CONJUNCTION WITH NOTE Crown Copyright and database right 2013. Ordnance Survey 100021326 (2013). You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form. CHECK GUIDANCE BEFORE ISSUING O.S. DATA IN DWG FORMAT PLANNING BEREAVEMENT SERVICES SUTTON NEW HALL CEMETERY EXTENSION 73170 04 APR 2012 1:1000 RSM PROJECT MASTERPLAN PHASES 2 & 3 WITH PHASE 1 WORKS 73170\A\021 A A 27MAY15 Option 3 - Sections 6/7 turned to suit trenching machine.