April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1- 2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California, San Diego Laila El-Guebaly University of Wisconsin, Madison ARIES Project Meeting University of Wisconsin, Madison April 23-24, 2009
6

Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL

Jan 14, 2016

Download

Documents

Shalom

Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL. A. René Raffray, Siegfried Malang, Xueren Wang University of California, San Diego Laila El-Guebaly University of Wisconsin, Madison. ARIES Project Meeting University of Wisconsin, Madison April 23-24, 2009. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL

April 23-24, 2009/ARR1

Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL

A. René Raffray, Siegfried Malang, Xueren WangUniversity of California, San Diego

Laila El-GuebalyUniversity of Wisconsin, Madison

ARIES Project MeetingUniversity of Wisconsin, Madison

April 23-24, 2009

Page 2: Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL

April 23-24, 2009/ARR2

Proposed Effort on ARIES-DB DCLL Blanket

• Three-part effort over next year to develop DCLL blanket design for ARIES-DB and Integrate it with Sector Maintenance

1. Develop blanket layout for sector maintenance based on example plasma shape from system code including updated radial build from neutronics analysis + integration in system code (~ 6 months)

2. Develop details of blanket configuration including supporting analysis (~ 6 months)

3. Integrate He-cooled divertor design in overall ARIES-DB (~ 6 months)

Page 3: Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL

April 23-24, 2009/ARR3

Power Core Maintenance in ARIES-RS

• ARIES-RS utilizes self-cooled lithium/vanadium blankets, segmented toroidally into 16 sectors. The divertor plates are cooled by lithium.

• ARIES-RS is designed for quick replacement of the power core components, which are inserted and withdrawn horizontally through ports.

• The hardback structure consists of the inboard reflector, upper and lower divertor structure and outboard reflector to withstand the large loads caused by gravity and disruption forces.

Overall layout of the ARIES-RS power core

Removable sector

Withdrawal of removable sector

Page 4: Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL

April 23-24, 2009/ARR4

Power Core Maintenance in ARIES-AT

• ARIES-AT blanket and divertor designs are based on Pb-17Li as coolant and breeder, and low-activation SiCf/SiC as structural material.

• The removable sector contains the first wall, inboard/outboard blankets, upper/lower divertor plates and structure, and inboard/outboard HT shield.

• The removable sector is withdrawn as a single unit through the corresponding maintenance port between TF coils.

Withdrawal of removable sector

Layout of ARIES-AT power core

Removable sector

Page 5: Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL

April 23-24, 2009/ARR5

Some Initial Ideas to Start our Effort(initiated by Siegfried)

• All the blankets and divertor elements are enclosed by a stable skeleton ring which serves as a permanent HT shield. This ring is supported at the bottom only by the VV, and all coolant access pipes are connected close to the mechanical support point to IB blanket, OB blanket, and lower divertor region. For the upper divertor coolant access pipes are routed through the outer part of the skeleton ring.

• All connections between coolant access pipes and the individual components are made at the outer side of the skeleton ring where the He-generation should be low enough to allow for re-welding.

• At the IB region the blanket and the replaceable shield are combined to one component which extends over the entire height of the power core. This component has its geometrical fix point at the bottom, and sliding bearings at the top to transfer for example disruption forces to the skeleton ring.

• The same principles are employed for the OB blanket.

• Upper and lower divertor targets as well as the "dome" there are attached to a cassette-like strong structure which can be replaced in the hot cell without dissembling blankets.

• As in ARIES-RS it is suggested to use hydraulic lifts between the sector and the VV for a precise alignment of the sector in the VV, and to use a “meltable” metal between the sector and the VV support for a strong attachment after the alignment.

INITIAL EXCHANGE OF IDEAS STARTED. DRAWINGS WILL FOLLOW.

Page 6: Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL

April 23-24, 2009/ARR6

Questions to be Addressed through First-Part Effort1. How should the vertical cross section through the VV look like to allow for a

replacement of entire power core sectors through large maintenance ports arranged between each pair of TF coils?

- Subdivision into breeding blankets, divertor targets, replaceable shields, permanent shields.

2. Where and how can the coolant access pipes be connected to the in-vessel components without the need for in-vessel tools on long articulated booms for the replacement of power core components? - This includes estimates for the number and diameters of the access pipes.

3. Where and how can sufficiently large ducts for vacuums pumping in the divertor region be arranged?

4. Where and how can the replacement components be attached to the permanent sector structure?

5. Where and how can the sectors be attached and supported by the VV?6. How can the entire sector and especially the divertor targets be aligned after a

replacement?