    Plan for Transitions in

    Office/Workroom/Storage Areas

    Rivermont Evangelical Presbyterian Church July 2, 2007

    Prepared by: Morgan Allen, Ellen Geisert, Vi c Fleet

    OverviewAfter careful consideration, the office staff has prepared a plan of transition and reorganization of office

    space, workrooms, and storage areas throughout the church building. Three key points were used in

    developing this plan: a. maximizing the space to its fullest potential while, b. raising workflow and office

    efficiency to a higher level and c. working to provide all staff with adequate space while housing all staff

    offices within the main building. This plan (attached) has been outlined in a room by room analysis of

    those areas affected.

  • 8/9/2019 Proposal for Transitions in Office

    2/13

    Room by Room Outline

    Front Office

    Current Use

    Main church office, reception area for guests and members, and office for church secretary

    Proposed Use and Plans

    Continue in same uses and functions;

    however, as part of the short range

    needs project, restructure and realign

    the layout of the office. After visiting

    several other reception offices, including

    another area church as well as a medical

    office, to gain ideas, a plan has been

    developed. As previewed in the attached

    diagram, the plan calls for construction

    of a custom counter and cabinet unit that

    will allow ample workspace as well as

    two workstations in the main office (allowing Janet to remain in her own space when others are

    working in the office). In addition, two wall cabinets and file cabinets will be added on the other

    side of the room. If funds allow, the window that faces the entry way will be converted into a

    sliding window to allow for easier interaction with guests and members.

    Action Steps

    1. Contract to build custom counter/cabinet unit Cliff Harrison2. Contract to convert window to sliding window Cliff Harrison3. Purchase and Install wall cabinets Vic Fleet4. Purchase and install file cabinets Staff

    Costs Associated

    1. To be determinedSEE DIAGRAM A

  • 8/9/2019 Proposal for Transitions in Office

    3/13

    Current Back / Office Hallway

    Current Use

    Hallway and entrance to the Chapel

    Proposed Use and Plans

    Alter current use from hallway to

    Office / staff copy-room and

    workroom. To accomplish this, the

    primary entrance to the chapel will

    need to be reestablished, which is the

    entrance from the hallway off the

    Cheatham room next to the John Knox

    Room. Using glass doors from Country

    Gardens, the hallway will be closed off

    to create a room while still allowinga pass-through to the back entrance to

    the chapel and the back stairway. The doors will contain noise from the printing machines

    and prevent unnecessary cutting though to the chapel through this workroom. For

    storage and workspace needs, wall cabinets, base cabinets, and counter top will be

    purchased and installed as outlined in the attached diagram. The newer Konica copier will

    be relocated to this room. Vic Fleet can complete this work and Mark Smith has approved

    the project to be funded from the Building and Grounds budget.

    Action Steps

    1. Purchase and install wall cabinets, base cabinets, and countertop Vic Fleet2. Purchase supplies and build doorframe Vic Fleet3. Install glass doors Vic Fleet4. Relocate copier and supplies from the current workroom Staff

    Costs Associated

    1. Total cost estimate for project: $1048.00SEE DIAGRAM B

  • 8/9/2019 Proposal for Transitions in Office

    4/13

    Riso / Printing Room

    Current Use

    Houses Risograph copier and folding machine.

    Proposed Use and PlansContinue to house riso and folder, but expanding

    the rooms usability. Rearrange layout of room.

    Purchase and install countertop. Relocate staff

    mailboxes to this room.

    Action Steps

    1. Purchase and Install Counter Vic Fleet2. Relocate staff mailboxes Vic Fleet

    Costs Associated

    1. Counter - $TBDSEE DIAGRAM C

  • 8/9/2019 Proposal for Transitions in Office

    5/13

    Current Work/Copy Room

    Current Use

    Workroom / Copy Room / Houses Storage Closet for Deacon Keys, etc

    Proposed Use and Plans

    Office for Morgan. The current workroom would be

    advantageous to Morgan, enhancing some of the needs of his

    position, and providing some benefit to the front office. The

    server can be relocated from Ellens office to this room to allow

    easier access as maintenance needs arise.

    Another support staff person in the church office area will

    provide additional assistance for greeting visitors or answering

    the phone. Additionally, Morgan has a need to work from the

    main floor on Sunday mornings. This room also needs to be

    open every Sunday morning and remain accessible to the on-

    duty deacons since the key cabinet and money drop box are

    bolted to the wall and their money bags are kept in the closet in

    this room. With Morgan as the staff person supporting/assisting

    the deacons on Sundays, it seems logical for him to house those

    items.

    Action Steps

    1. Relocate supplies and copier to new work room Staff2. Relocate older Konica to Childrens areaStaff3. Paint room Vic Fleet / Morgan4. Relocate Morgans items to roomStaff

    Costs Associated

    5. Paint - $TBD

  • 8/9/2019 Proposal for Transitions in Office

    6/13

    Current Custodial Storage Closet

    Current Use

    Storage closet for Custodial Service

    Proposed Use and PlansStorage closet for tables and chairs used on the main

    floor. In order to clear out and reopen the main entrance

    hallway to the chapel, the chairs and tables currently

    stored there will be relocated to this room. The custodial

    service will be relocated to the first floor in large the

    storage room that houses the round tables.

    Action Steps

    1. Relocate tables and chairs Staff2. Move cleaning equipment and supplies to

    basement Staff/Cleaning Service

    Costs Associated

    1. None estimated

  • 8/9/2019 Proposal for Transitions in Office

    7/13

    Current WOC Closet

    Current Use

    Houses music ministry instruments (chimes) and church historical records.

    Proposed Use and Plans

    Continue to house music ministry

    items. In addition, relocate the AV

    equipment and carts to this room. Sort

    through and repack the historical

    records, possibly transferring them to

    another storage location. Put up a

    plantation blind on window that faces

    Rivermont Avenue.

    Action Steps

    1. Sort-thru and repack historicalrecords Staff

    2. Relocate AV equipment Morgan3. Purchase and Install plantation blind Ken Dunn

    Costs Associated

    1. Plantation Blind - $TBD

  • 8/9/2019 Proposal for Transitions in Office

    8/13

    Downstairs Storage Room (Table Storage)

    Current Use

    Storage for round tables and AV equipment

    Proposed Use and Plans

    Continue as storage for the round tables.

    Relocate the AV equipment to WOC closet.

    Relocate the custodial service equipment

    and storage to this room. Relocate shelving

    from existing custodial closet and install any

    additional shelving needed for the custodial

    service.

    Action Steps

    1. Relocate custodial serviceequipment and supplies to this

    room Staff

    2. Relocate AV equipment from this room Morgan3. Relocate shelving from current custodial closet to this room Vic Fleet4. Install any additional shelving Vic Fleet

    Costs Associated

    6. Any additional shelving - $TBD

  • 8/9/2019 Proposal for Transitions in Office

    9/13

    Current Office for Morgan

    Current Use

    Office for Morgan

    Proposed Use and Plans

    Office for Shane, thereby relocating

    Shane to the main building. Provides

    Shane with a larger office, with nice

    counter and cabinetry, and a space

    suitable for work and small meetings.

    Also, perhaps, will help to alleviate the

    problem of the youth gathering on the

    main floor by encouraging them to

    move upstairs to the youth office

    area.

    Action Steps

    1. Relocate Morgans items from room Staff2. Relocate Shanes items to room Staff

    Costs Associated

    1. None estimated

  • 8/9/2019 Proposal for Transitions in Office

    10/13

    Room 301 Storage Closet

    Current Use

    Storage closet

    Proposed Use and Plans

    Christian Education storage room.

    Organize items in room utilizing existing

    shelving. Relocate choir robes to choir

    area.

    Action Steps

    1. Organize items in room usingexisting shelving CE/Childrens

    Ministry Staff

    2. Relocate Choir robes to choir areaStaff

    Costs Associated

    1. None estimated

  • 8/9/2019 Proposal for Transitions in Office

    11/13

    Choir Office

    Current Use

    Choir Directors Office

    Proposed Use and Plans

    Continue to be used as music ministry

    room. Relocate choir robes from 301 to this

    room. Maintain a work area / desk set-up

    for music ministry needs.

    Action Steps

    1. Relocate choir robes to this room Staff

    Costs Associated1. None estimated

  • 8/9/2019 Proposal for Transitions in Office

    12/13

    Room 308

    Current Use

    Christian Education class room

    Proposed Use and Plans

    Continue with use as a classroom with

    added storage / cabinet units along side

    of classroom as previewed in the attached

    diagram. Mark Smith has also reviewed

    the plan for these storage units.

    Action Steps

    1. Purchase and install wall cabinets,base cabinets, and countertop

    Vic Fleet

    2. Construct customcabinets/closetsVic Fleet

    Costs Associated

    1. Total cost estimate for project: $3747.00SEE DIAGRAM D

  • 8/9/2019 Proposal for Transitions in Office

    13/13

    Concluding Priorities and Action StepsBased on the above plan this following is a list of action steps for completion, in order of highest to

    lowest priority.

    PRIORITY LEVEL ACTION COST

    1 Completion of New Workroom and Riso Room $1348.00

    1 Realignment of Shanes / Morgan Offices TBD

    1 Completion of Front Office TBD

    1 Realignment of Storage Areas (Cleaning, WOC, Downstairs, 301) None Estimated

    2 Room 308 Storage Units $3747.00