55 FRANKLIN STREET PROPERTY HIGHLIGHTS 3,138 SF SPEC SUITE 55 FRANKLIN STREET BOSTON • Premier location one block from Millennium Tower • Adjacent to the city’s busiest subway station, Downtown Crossing (MBTA Orange and Red Lines) • Abundance of nearby restaurants and retail • Walking distance to Financial District, Theatre District, Waterfront, historic Boston Common & its Public Garden
4
Embed
PROPERTY HIGHLIGHTS€¦ · RENOVATIONS TO 3RD FLOOR TENANT SPACE 3RD FLOOR, 55 FRANKLIN STREET, BOSTON MA CONSTRUCTION PLAN AP AR 67003.03 1/8"=1'-0" 11-16-18 A101 DRAFT 2018 3RD
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
55 FRANKLIN STREET
PROPERTY HIGHLIGHTS
3,138 SFSPEC SUITE55 FRANKLIN STREET
BOSTON
• Premier location one block from
Millennium Tower
• Adjacent to the city’s busiest subway
station, Downtown Crossing (MBTA
Orange and Red Lines)
• Abundance of nearby restaurants and
retail
• Walking distance to Financial District,
Theatre District, Waterfront, historic
Boston Common & its Public Garden
INTERCONTINENTAL
OFFICE 2
OFFICE 1
CLOS. PANTRY
CL.
MENWOMEN
OPEN OFFICE
F2
F1
F1 F3F3F2
F2
F2
A-1A200
NOTE 1
NOTE 2
NOTE 3
NOTE 4
CONFERENCEROOM1'-0"
NUMBERED NOTES:
NOTE 1: EXISTING ELEVATOR LOBBYAND ALL RELATED FINISHES EXCEPTFOR FLOORING ARE EXISTING TOREMAIN. LIGHTING, GLAZING ANDHARDWARE ARE EXISTING TO REMAIN.PROTECT FROM DAMAGE DURINGCONSTRUCTION, ASSUME MINORPATCHING OF WALL FINISHES, AND FULLCLEANING.NOTE 2: GC TO REMOVE EXISTINGDECALS FROM GLAZING AND CLEANGLASS. NEW GLAZING FILM/SIGNAGE ISBY TENANT.NOTE 3: NEW PANTRY CABINETS,DISHWASHER AND REFRIGERATOR.NOTE 4: NEW FRAMELESS TEMPEREDGLASS WALL AND DOOR.
GENERAL CONSTRUCTION NOTES:
G1. PROTECT ALL EXISTING TOREMAIN ELEMENTS FROM DAMAGE.PROVIDE GENERAL PATCHING OFSURFACES AND FINISHES ASREQUIRED BY DEMOLITION ANDNEW CONSTRUCTION.G2. TYP. THROUGHOUT EXTENDEXISTING GWB WALL FINISHES UPTO UNDERSIDE OF DECK WHEREFRAMING IF FRAMING OR MASONRYIS EXPOSED AT NEW OPEN CEILINGAREAS. TRANSITION TO BE ASSEAMLESS AS POSSIBLE. SEE RCPFOR ADDITIONAL NOTES.G3. SEE REFLECTED CEILINGPLAN FOR ADDITIONAL GWBSOFFIT, UPPER WALL AND CEILINGCONSTRUCTION NOTES.
LVT, PATCRAFTF1
F2
F3
FLOOR FINISH:
FLOORS:PREP EXISTING FLOORS AS REQUIRED TORECIEVE NEW FINISHES. PATCH, REPAIR ANDLEVEL TO PROVIDE SMOOTH CLEAN SURFACEAS REQUIRED AND PER MANUFACTURERRECOMMENDATIONS FOR NEW FINISH.
ADJUST FLOOR LEVELS AND PROVIDETRANSITION STRIPS FOR SMOOTHTRANSITION BETWEEN FLOOR FINISHES.
FINISH NOTES:
ALL PAINTS, PRIMERS, MASTICS ANDADHESIVES TO BE LOW- OR NO-VOC.
WALLS:ALL NEW AND EXISTING GWB WALLS TORECEIVE PRIMER AND TWO COATS OFFINISH PAINT, BENJAMIN MOORE COLOR No.:ONE TRIM COLOR No.:AND ONE ACCENT COLOR No.:PROVIDE NEW VINYL AT GWB WALLS, TYP.COVE AT RESILIENT FLOOR, STRAIGHT ATCARPETJOHNSONITE COLOR:NO BASE AT EXPOSED MASONRY WALLS
CARPET TILE, PATCRAFT
CERAMIC TILE, DALTILE
DOORS:PAINT EXISTING AND NEW METAL DOORFRAMES THROUGHOUT. PAINT EXISTINGPAINTED DOORS.
CEILINGS:PAINT SOFFITS AND OTHER PAINTEDCEILING SURFACES THROUGHOUT, SEERCP / CEILING NOTES.
Cop
yrig
ht
Dav
is S
quar
e Ar
chite
cts,
Inc.
c
Des
igne
d
Che
cked
Dat
e
Proj
ect N
o.
Scal
e
Drawing No.
Proj
ect
Title
C:\A
CAD
Save
s\Ac
Publ
ish_
8620
\55
Fran
klin
_JSt
one_
Plan
s.dw
g
REN
OVA
TIO
NS
TO
3RD
FLO
OR
TEN
ANT
SPAC
E3R
D F
LOO
R, 5
5 FR
ANKL
IN S
TREE
T, B
OST
ON
MA
CO
NST
RU
CTI
ON
PLA
N
AP AR 6700
3.03
1/8"
=1'-0
"
11-1
6-18
A101
DRAFT
2018
3RD FLOOR3,138 SF
• High Ceilings
• Exposed brick
• Built-out kitchen area
• Open office area
• Glass walled conference room with modern lighting