Top Banner
ÚSTŘEDNÍ KONTROLNÍ A ZKUŠEBNÍ ÚSTAV ZEMĚDĚLSKÝ www.ukzuz.cz ISO 9001: 2008 Proper use and CZ risk mitigation measures CEUREG Forum XX, Brno 2016 Pavel Minář, ÚKZÚZ, Czech Republic
14

Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

Jun 05, 2018

Download

Documents

hathuan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

ÚSTŘEDNÍ KONTROLNÍ A ZKUŠEBNÍ ÚSTAV ZEMĚDĚLSKÝ

www.ukzuz.czISO 9001: 2008

Proper use and CZ risk mitigation measures

CEUREG Forum XX, Brno 2016

Pavel Minář, ÚKZÚZ, Czech Republic

Page 2: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

O

ÚSTŘEDNÍ KONTROLNÍ A ZKUŠEBNÍ ÚSTAV ZEMĚDĚLSKÝw

ww

.ukz

uz.

czISO 9001: 2008

Obsah

• Proper use, GPPP, IPM

• Role of risk mitigation measures

• How to establish them + harmonisation

• Závěry

Page 3: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

O

ÚSTŘEDNÍ KONTROLNÍ A ZKUŠEBNÍ ÚSTAV ZEMĚDĚLSKÝw

ww

.ukz

uz.

czISO 9001: 2008

Directive EP and Council (EC) 2009/128/ES,

establishing a framework for Community action to

achieve the sustainable use of pesticides

- Support of low pesticides input, esp. IOR

- IPM implementation

- Preference of non-chemical methods

- National action plans

Page 4: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

O

ÚSTŘEDNÍ KONTROLNÍ A ZKUŠEBNÍ ÚSTAV ZEMĚDĚLSKÝw

ww

.ukz

uz.

czISO 9001: 2008

Combination of obligations and recommendations:

• …all necessary measures to support…

• …give wherever possible priority…

• …support the establishment of necessary

conditions …

• …establish appropriate incentives to encourage

professional users to implement …

Page 5: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

Integrated Pest Management

Optimal growthUtilisation of natural

mechanisms

Prognosis, forecast, thresholds

Page 6: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

1

Taking into accountnon-chemical methods

Risks of availableproducts + local

conditions + choiceof PPP

PPP application according to the label + further specific

requirements

Good Plant Protection Practice

Page 7: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

O

ÚSTŘEDNÍ KONTROLNÍ A ZKUŠEBNÍ ÚSTAV ZEMĚDĚLSKÝw

ww

.ukz

uz.

czISO 9001: 2008

Proper use of PPP:

Application following the label:

• Crop

• Pest

• Maximum dose, method of treatment, water

• Maximum number of treatment

• Growth stages (limits)

• Buffer zones (surface water, non target plants and

arthropods, residential areas)

• Protection of sources of drinking water

• Protection of honeybees and game

• Protection of human health

Page 8: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

O

ÚSTŘEDNÍ KONTROLNÍ A ZKUŠEBNÍ ÚSTAV ZEMĚDĚLSKÝw

ww

.ukz

uz.

czISO 9001: 2008

Use of risk mitigation measures:

If the proposed use does not meet safety criteria (= for authorisation), the possible risk mitigationmeasures are checked:

Dose reductionReduction of number of treatmentsBuffer zonesExclusion from some areasPersonal protective equipment, safety intervals etc.

Page 9: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

O

ÚSTŘEDNÍ KONTROLNÍ A ZKUŠEBNÍ ÚSTAV ZEMĚDĚLSKÝw

ww

.ukz

uz.

czISO 9001: 2008

Some examples - CZ

Assessment of risk on railway and permeablesurfacesPavements, roads ?Areas used by general publics – exclusion possibleBuffer zones from residential areasExclusion from water protective areasBuffers from surface waterBuffers from „small“ sources of drinking water

Page 10: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

O

ÚSTŘEDNÍ KONTROLNÍ A ZKUŠEBNÍ ÚSTAV ZEMĚDĚLSKÝw

ww

.ukz

uz.

czISO 9001: 2008

Choice of the product

It is necessary to prioritise biological, physical and

other non-chemical methods, pif they satisfactorily

ensure protection against harmful organisms

Pesticides used should be the most specific to the

pest and should have the lowest possible side effectsto human health and environment

Page 11: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

1

Page 12: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

Authorisation

Risk Communication

InspectionMonitoring

Analysis ofinformations

Page 13: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

O

ÚSTŘEDNÍ KONTROLNÍ A ZKUŠEBNÍ ÚSTAV ZEMĚDĚLSKÝw

ww

.ukz

uz.

czISO 9001: 2008

Conclusions

• Risk mitigation measures shall be realistic

• Feedback from inspectors and monitoring

necessary

• Harmonisation of risk mitigation measures is

important for mutual recognition

Page 14: Proper use and CZ risk mitigation measures - CEUREG 2016 - Mi… · ÚSTŘEDNÍ KONTROLNÍ A ZKUŠENÍ ÚSTAV ZEMĚDĚLSKÝ ISO 9001: 2008 Proper use and CZ risk mitigation measures

Thank you for your attention!

Pavel Minář[email protected]