PROJECTS Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description T S S U R A W P H E T C S B I A E R E I N R V R N D E G H H HE E EA A AL L LT T TH H H A A AN N ND D D H H HU U UM M MA A AN N N S S SE E ER R RV V VI I IC C CE E ES S S C C CO O OM M MM M MI I IS S SS S SI I IO O ON N N Border Regions FY2007 - HHSC Colonias 9/1/2006 8/31/2010 Completed $2,563,704.00 FY2010 Initiative Initiative Abbreviations: WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08/31/2010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 1 of 81 Rev. 01/21/2010
81
Embed
PROJECTS - Texas Secretary of State - 10 pdn Foundation TAMU/CHUD TXDF06 - 03-C CorpNatl Ser TAMU/CHUD TXDF06 - 04-D VIS-PERF ARTS TAMU/CHUD TXFD08 - 01 TEXLEG2008 TAMU/CHUD TXFD08
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PROJECTS
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 1 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 2 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912007 8312008 Completed
In Progress
In Progress
912007 8312008 Completed
912007 8312008 Completed
912007 8312008 Completed
912007 8312008 Completed
912008 8312009 Completed
912007 8312008 Completed
912006 8312007 Completed
912007 8312008 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
education outreach
educationoutreach
educoutreach
borderwide
outreach
survey
borderwide
borderwide
health outreach
educationoutreach
educationoutreach
As of Page 3 of 81 Rev
$7000000
$13733400
$500000
$83429500
$9463000
$2524800
$16480000
$83429500
$500000
$6300000
$1000000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912007 8312008 Completed
912007 8312008 Completed
1012006 8312007 Completed
In Progress
In Progress
912007 8312008 Completed
912006 8312007 Completed
1012007 8312008 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
educationoutreach
outreach
educationoutreach
educoutreach
educationoutreach
health outreach
educationoutreach
survey-outreach
borderwide
survey
housing
As of Page 4 of 81 Rev
$18387500
$20259400
$15106600
$500000
$4241700
$3600000
$7498500
$500000
$83429500
$14999900
$1090000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912006 8312007 Completed
912006 8312007 Completed
In Progress
912006 8312007 Completed
In Progress
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912008 8312009 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
borderwide
health outreach
educationoutreach
education outreach
educationoutreach
educationoutreach
educationoutreach
educationoutreach
educationoutreach
outreach
outreach
As of Page 5 of 81 Rev
$16480000
$3000000
$723500
$3800000
$800000
$700000
$499200
$18387500
$6000000
$13500000
$18300000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912006 8312007 Completed
912009 8312010 Completed
In Progress
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
health outreach
outreach
educationoutreach
outreach
healthoutreach
educationoutreach
outreach
educationoutreach
outreach
outreach
borderwide
As of Page 6 of 81 Rev
$500000
$900000
$500000
$20200000
$734100
$1634900
$6400000
$29900000
$15000000
$11173900
$8300000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 9 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 10 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso 8982 710013 CSHC 5122010 5122014 In Progress
CameronWillacy 7723 728013 CSHC 11132008 11132012 In Progress
Hidalgo 3573 728003 CSHC 6262008 6252012 In Progress
Maverick 5184 727023 CSHC 4122007 4122011 In Progress
Maverick 5184 727043 CSHC 5172007 4122011 In Progress
Starr 8024 727013 CSHC 4122007 4122011 In Progress
Starr 8024 727033 CSHC 5172007 4122011 In Progress
Val Verde 5923 710003 CSHC 5122010 5122014 In Progress
Val Verde 5560 726003 CSHC 8302006 512010 Completed
Val Verde 5560 727003 CSHC 8302006 5312010 Completed
Webb 1212 728023 CSHC 12182008 12182012 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$119382826
$120000000
$120000000
$68611200
$51388800
$68611200
$51388800
$120000000
$38978400
$46021600
$120000000
As of 08312010 Page 11 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 12 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 2 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912007 8312008 Completed
In Progress
In Progress
912007 8312008 Completed
912007 8312008 Completed
912007 8312008 Completed
912007 8312008 Completed
912008 8312009 Completed
912007 8312008 Completed
912006 8312007 Completed
912007 8312008 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
education outreach
educationoutreach
educoutreach
borderwide
outreach
survey
borderwide
borderwide
health outreach
educationoutreach
educationoutreach
As of Page 3 of 81 Rev
$7000000
$13733400
$500000
$83429500
$9463000
$2524800
$16480000
$83429500
$500000
$6300000
$1000000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912007 8312008 Completed
912007 8312008 Completed
1012006 8312007 Completed
In Progress
In Progress
912007 8312008 Completed
912006 8312007 Completed
1012007 8312008 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
educationoutreach
outreach
educationoutreach
educoutreach
educationoutreach
health outreach
educationoutreach
survey-outreach
borderwide
survey
housing
As of Page 4 of 81 Rev
$18387500
$20259400
$15106600
$500000
$4241700
$3600000
$7498500
$500000
$83429500
$14999900
$1090000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912006 8312007 Completed
912006 8312007 Completed
In Progress
912006 8312007 Completed
In Progress
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912008 8312009 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
borderwide
health outreach
educationoutreach
education outreach
educationoutreach
educationoutreach
educationoutreach
educationoutreach
educationoutreach
outreach
outreach
As of Page 5 of 81 Rev
$16480000
$3000000
$723500
$3800000
$800000
$700000
$499200
$18387500
$6000000
$13500000
$18300000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912006 8312007 Completed
912009 8312010 Completed
In Progress
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
health outreach
outreach
educationoutreach
outreach
healthoutreach
educationoutreach
outreach
educationoutreach
outreach
outreach
borderwide
As of Page 6 of 81 Rev
$500000
$900000
$500000
$20200000
$734100
$1634900
$6400000
$29900000
$15000000
$11173900
$8300000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 9 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 10 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso 8982 710013 CSHC 5122010 5122014 In Progress
CameronWillacy 7723 728013 CSHC 11132008 11132012 In Progress
Hidalgo 3573 728003 CSHC 6262008 6252012 In Progress
Maverick 5184 727023 CSHC 4122007 4122011 In Progress
Maverick 5184 727043 CSHC 5172007 4122011 In Progress
Starr 8024 727013 CSHC 4122007 4122011 In Progress
Starr 8024 727033 CSHC 5172007 4122011 In Progress
Val Verde 5923 710003 CSHC 5122010 5122014 In Progress
Val Verde 5560 726003 CSHC 8302006 512010 Completed
Val Verde 5560 727003 CSHC 8302006 5312010 Completed
Webb 1212 728023 CSHC 12182008 12182012 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$119382826
$120000000
$120000000
$68611200
$51388800
$68611200
$51388800
$120000000
$38978400
$46021600
$120000000
As of 08312010 Page 11 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 12 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912007 8312008 Completed
In Progress
In Progress
912007 8312008 Completed
912007 8312008 Completed
912007 8312008 Completed
912007 8312008 Completed
912008 8312009 Completed
912007 8312008 Completed
912006 8312007 Completed
912007 8312008 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
education outreach
educationoutreach
educoutreach
borderwide
outreach
survey
borderwide
borderwide
health outreach
educationoutreach
educationoutreach
As of Page 3 of 81 Rev
$7000000
$13733400
$500000
$83429500
$9463000
$2524800
$16480000
$83429500
$500000
$6300000
$1000000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912007 8312008 Completed
912007 8312008 Completed
1012006 8312007 Completed
In Progress
In Progress
912007 8312008 Completed
912006 8312007 Completed
1012007 8312008 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
educationoutreach
outreach
educationoutreach
educoutreach
educationoutreach
health outreach
educationoutreach
survey-outreach
borderwide
survey
housing
As of Page 4 of 81 Rev
$18387500
$20259400
$15106600
$500000
$4241700
$3600000
$7498500
$500000
$83429500
$14999900
$1090000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912006 8312007 Completed
912006 8312007 Completed
In Progress
912006 8312007 Completed
In Progress
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912008 8312009 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
borderwide
health outreach
educationoutreach
education outreach
educationoutreach
educationoutreach
educationoutreach
educationoutreach
educationoutreach
outreach
outreach
As of Page 5 of 81 Rev
$16480000
$3000000
$723500
$3800000
$800000
$700000
$499200
$18387500
$6000000
$13500000
$18300000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912006 8312007 Completed
912009 8312010 Completed
In Progress
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
health outreach
outreach
educationoutreach
outreach
healthoutreach
educationoutreach
outreach
educationoutreach
outreach
outreach
borderwide
As of Page 6 of 81 Rev
$500000
$900000
$500000
$20200000
$734100
$1634900
$6400000
$29900000
$15000000
$11173900
$8300000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 9 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 10 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso 8982 710013 CSHC 5122010 5122014 In Progress
CameronWillacy 7723 728013 CSHC 11132008 11132012 In Progress
Hidalgo 3573 728003 CSHC 6262008 6252012 In Progress
Maverick 5184 727023 CSHC 4122007 4122011 In Progress
Maverick 5184 727043 CSHC 5172007 4122011 In Progress
Starr 8024 727013 CSHC 4122007 4122011 In Progress
Starr 8024 727033 CSHC 5172007 4122011 In Progress
Val Verde 5923 710003 CSHC 5122010 5122014 In Progress
Val Verde 5560 726003 CSHC 8302006 512010 Completed
Val Verde 5560 727003 CSHC 8302006 5312010 Completed
Webb 1212 728023 CSHC 12182008 12182012 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$119382826
$120000000
$120000000
$68611200
$51388800
$68611200
$51388800
$120000000
$38978400
$46021600
$120000000
As of 08312010 Page 11 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 12 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912007 8312008 Completed
912007 8312008 Completed
1012006 8312007 Completed
In Progress
In Progress
912007 8312008 Completed
912006 8312007 Completed
1012007 8312008 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
educationoutreach
outreach
educationoutreach
educoutreach
educationoutreach
health outreach
educationoutreach
survey-outreach
borderwide
survey
housing
As of Page 4 of 81 Rev
$18387500
$20259400
$15106600
$500000
$4241700
$3600000
$7498500
$500000
$83429500
$14999900
$1090000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912006 8312007 Completed
912006 8312007 Completed
In Progress
912006 8312007 Completed
In Progress
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912008 8312009 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
borderwide
health outreach
educationoutreach
education outreach
educationoutreach
educationoutreach
educationoutreach
educationoutreach
educationoutreach
outreach
outreach
As of Page 5 of 81 Rev
$16480000
$3000000
$723500
$3800000
$800000
$700000
$499200
$18387500
$6000000
$13500000
$18300000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912006 8312007 Completed
912009 8312010 Completed
In Progress
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
health outreach
outreach
educationoutreach
outreach
healthoutreach
educationoutreach
outreach
educationoutreach
outreach
outreach
borderwide
As of Page 6 of 81 Rev
$500000
$900000
$500000
$20200000
$734100
$1634900
$6400000
$29900000
$15000000
$11173900
$8300000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 9 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 10 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso 8982 710013 CSHC 5122010 5122014 In Progress
CameronWillacy 7723 728013 CSHC 11132008 11132012 In Progress
Hidalgo 3573 728003 CSHC 6262008 6252012 In Progress
Maverick 5184 727023 CSHC 4122007 4122011 In Progress
Maverick 5184 727043 CSHC 5172007 4122011 In Progress
Starr 8024 727013 CSHC 4122007 4122011 In Progress
Starr 8024 727033 CSHC 5172007 4122011 In Progress
Val Verde 5923 710003 CSHC 5122010 5122014 In Progress
Val Verde 5560 726003 CSHC 8302006 512010 Completed
Val Verde 5560 727003 CSHC 8302006 5312010 Completed
Webb 1212 728023 CSHC 12182008 12182012 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$119382826
$120000000
$120000000
$68611200
$51388800
$68611200
$51388800
$120000000
$38978400
$46021600
$120000000
As of 08312010 Page 11 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 12 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912006 8312007 Completed
912006 8312007 Completed
In Progress
912006 8312007 Completed
In Progress
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912006 8312007 Completed
912008 8312009 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
borderwide
health outreach
educationoutreach
education outreach
educationoutreach
educationoutreach
educationoutreach
educationoutreach
educationoutreach
outreach
outreach
As of Page 5 of 81 Rev
$16480000
$3000000
$723500
$3800000
$800000
$700000
$499200
$18387500
$6000000
$13500000
$18300000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912006 8312007 Completed
912009 8312010 Completed
In Progress
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
health outreach
outreach
educationoutreach
outreach
healthoutreach
educationoutreach
outreach
educationoutreach
outreach
outreach
borderwide
As of Page 6 of 81 Rev
$500000
$900000
$500000
$20200000
$734100
$1634900
$6400000
$29900000
$15000000
$11173900
$8300000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 9 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 10 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso 8982 710013 CSHC 5122010 5122014 In Progress
CameronWillacy 7723 728013 CSHC 11132008 11132012 In Progress
Hidalgo 3573 728003 CSHC 6262008 6252012 In Progress
Maverick 5184 727023 CSHC 4122007 4122011 In Progress
Maverick 5184 727043 CSHC 5172007 4122011 In Progress
Starr 8024 727013 CSHC 4122007 4122011 In Progress
Starr 8024 727033 CSHC 5172007 4122011 In Progress
Val Verde 5923 710003 CSHC 5122010 5122014 In Progress
Val Verde 5560 726003 CSHC 8302006 512010 Completed
Val Verde 5560 727003 CSHC 8302006 5312010 Completed
Webb 1212 728023 CSHC 12182008 12182012 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$119382826
$120000000
$120000000
$68611200
$51388800
$68611200
$51388800
$120000000
$38978400
$46021600
$120000000
As of 08312010 Page 11 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 12 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads
912006 8312007 Completed
912009 8312010 Completed
In Progress
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
912009 8312010 Completed
CURB = Curb and Gutter Initiatives REPAVE = Repaving of New Roads
health outreach
outreach
educationoutreach
outreach
healthoutreach
educationoutreach
outreach
educationoutreach
outreach
outreach
borderwide
As of Page 6 of 81 Rev
$500000
$900000
$500000
$20200000
$734100
$1634900
$6400000
$29900000
$15000000
$11173900
$8300000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 9 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 10 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso 8982 710013 CSHC 5122010 5122014 In Progress
CameronWillacy 7723 728013 CSHC 11132008 11132012 In Progress
Hidalgo 3573 728003 CSHC 6262008 6252012 In Progress
Maverick 5184 727023 CSHC 4122007 4122011 In Progress
Maverick 5184 727043 CSHC 5172007 4122011 In Progress
Starr 8024 727013 CSHC 4122007 4122011 In Progress
Starr 8024 727033 CSHC 5172007 4122011 In Progress
Val Verde 5923 710003 CSHC 5122010 5122014 In Progress
Val Verde 5560 726003 CSHC 8302006 512010 Completed
Val Verde 5560 727003 CSHC 8302006 5312010 Completed
Webb 1212 728023 CSHC 12182008 12182012 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$119382826
$120000000
$120000000
$68611200
$51388800
$68611200
$51388800
$120000000
$38978400
$46021600
$120000000
As of 08312010 Page 11 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 12 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 9 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 10 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso 8982 710013 CSHC 5122010 5122014 In Progress
CameronWillacy 7723 728013 CSHC 11132008 11132012 In Progress
Hidalgo 3573 728003 CSHC 6262008 6252012 In Progress
Maverick 5184 727023 CSHC 4122007 4122011 In Progress
Maverick 5184 727043 CSHC 5172007 4122011 In Progress
Starr 8024 727013 CSHC 4122007 4122011 In Progress
Starr 8024 727033 CSHC 5172007 4122011 In Progress
Val Verde 5923 710003 CSHC 5122010 5122014 In Progress
Val Verde 5560 726003 CSHC 8302006 512010 Completed
Val Verde 5560 727003 CSHC 8302006 5312010 Completed
Webb 1212 728023 CSHC 12182008 12182012 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$119382826
$120000000
$120000000
$68611200
$51388800
$68611200
$51388800
$120000000
$38978400
$46021600
$120000000
As of 08312010 Page 11 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 12 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 9 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 10 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso 8982 710013 CSHC 5122010 5122014 In Progress
CameronWillacy 7723 728013 CSHC 11132008 11132012 In Progress
Hidalgo 3573 728003 CSHC 6262008 6252012 In Progress
Maverick 5184 727023 CSHC 4122007 4122011 In Progress
Maverick 5184 727043 CSHC 5172007 4122011 In Progress
Starr 8024 727013 CSHC 4122007 4122011 In Progress
Starr 8024 727033 CSHC 5172007 4122011 In Progress
Val Verde 5923 710003 CSHC 5122010 5122014 In Progress
Val Verde 5560 726003 CSHC 8302006 512010 Completed
Val Verde 5560 727003 CSHC 8302006 5312010 Completed
Webb 1212 728023 CSHC 12182008 12182012 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$119382826
$120000000
$120000000
$68611200
$51388800
$68611200
$51388800
$120000000
$38978400
$46021600
$120000000
As of 08312010 Page 11 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 12 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 9 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 10 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso 8982 710013 CSHC 5122010 5122014 In Progress
CameronWillacy 7723 728013 CSHC 11132008 11132012 In Progress
Hidalgo 3573 728003 CSHC 6262008 6252012 In Progress
Maverick 5184 727023 CSHC 4122007 4122011 In Progress
Maverick 5184 727043 CSHC 5172007 4122011 In Progress
Starr 8024 727013 CSHC 4122007 4122011 In Progress
Starr 8024 727033 CSHC 5172007 4122011 In Progress
Val Verde 5923 710003 CSHC 5122010 5122014 In Progress
Val Verde 5560 726003 CSHC 8302006 512010 Completed
Val Verde 5560 727003 CSHC 8302006 5312010 Completed
Webb 1212 728023 CSHC 12182008 12182012 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$119382826
$120000000
$120000000
$68611200
$51388800
$68611200
$51388800
$120000000
$38978400
$46021600
$120000000
As of 08312010 Page 11 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 12 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 10 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso 8982 710013 CSHC 5122010 5122014 In Progress
CameronWillacy 7723 728013 CSHC 11132008 11132012 In Progress
Hidalgo 3573 728003 CSHC 6262008 6252012 In Progress
Maverick 5184 727023 CSHC 4122007 4122011 In Progress
Maverick 5184 727043 CSHC 5172007 4122011 In Progress
Starr 8024 727013 CSHC 4122007 4122011 In Progress
Starr 8024 727033 CSHC 5172007 4122011 In Progress
Val Verde 5923 710003 CSHC 5122010 5122014 In Progress
Val Verde 5560 726003 CSHC 8302006 512010 Completed
Val Verde 5560 727003 CSHC 8302006 5312010 Completed
Webb 1212 728023 CSHC 12182008 12182012 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$119382826
$120000000
$120000000
$68611200
$51388800
$68611200
$51388800
$120000000
$38978400
$46021600
$120000000
As of 08312010 Page 11 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 12 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso 8982 710013 CSHC 5122010 5122014 In Progress
CameronWillacy 7723 728013 CSHC 11132008 11132012 In Progress
Hidalgo 3573 728003 CSHC 6262008 6252012 In Progress
Maverick 5184 727023 CSHC 4122007 4122011 In Progress
Maverick 5184 727043 CSHC 5172007 4122011 In Progress
Starr 8024 727013 CSHC 4122007 4122011 In Progress
Starr 8024 727033 CSHC 5172007 4122011 In Progress
Val Verde 5923 710003 CSHC 5122010 5122014 In Progress
Val Verde 5560 726003 CSHC 8302006 512010 Completed
Val Verde 5560 727003 CSHC 8302006 5312010 Completed
Webb 1212 728023 CSHC 12182008 12182012 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$119382826
$120000000
$120000000
$68611200
$51388800
$68611200
$51388800
$120000000
$38978400
$46021600
$120000000
As of 08312010 Page 11 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 12 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 12 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 21 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 22 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C0710029 Brinkman 612005 5312007 Completed Addition
El Paso District 2C0710260 Sylvia Andrea 612005 5312007 Completed Subdivision
El Paso District 2C0710068 Cuna Del Valle 612005 5312007 Completed
El Paso District 2C0710109 Gonzalez 612005 5312007 Completed Subdivision
El Paso District 2C0719999 Colonia 612005 5312007 Completed Revolucion
El Paso District 2C0710087 El Paso Hills 1-4 612005 5312007 Completed
El Paso District 2C0710205 Nu-Way 612005 5312007 Completed Addition
El Paso District 2C0710272 Village of 612005 5312007 Completed Vinton
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$17149713
$32193708
$49349178
$15703170
$160550000
$126508361
$19801453
$23353775
As of 08312010 Page 23 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 3D1890009 Presidio 812008 812010 Completed
El Paso District 2C1220001 Valentine 612005 5312007 Completed
El Paso District 3C0550002 Van Horn 812008 8312010 Completed
El Paso District 3C0710251 Sparks Addition 812008 512011 In Progress 3C0710252 1 amp 2
El Paso District 3C0710107 Gloria Elena 812008 8312010 Completed
El Paso District 3C0710259 Sunshine Acres 812008 8312010 Completed
El Paso District 3C0710096 Eubanks Unit 3 812008 912010 In Progress
El Paso District 3C0710254 Sparks Addition 812008 512011 In Progress 4
El Paso District 3C1220001 Valentine 812008 512011 In Progress
El Paso District 3C0710200 Morning Glory 812008 912010 In Progress Manor
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$170846500
$60941600
$33245200
$34114744
$21073184
$24832479
$29918982
$36275804
$86425200
$82700877
As of 08312010 Page 25 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
El Paso District 2C1890004 Pueblo Nuevo 612005 5312007 Completed
El Paso District 3C1150004 Loma Linda 812008 912011 In Progress Estates
El Paso District 2C1890001 Candelaria 612005 5312007 Completed
Laredo District 3C1620041 Las Hacienditas 812008 8312010 Completed
Laredo District 3C1620064 Siesta Acres 812008 3112011 In Progress
Laredo District 3C1620072 Loma Bonita 812008 6112011 In Progress
Laredo District 2C2330001 Amistad Acres 612005 5312007 Completed
Laredo District 3D1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620042 Las Quintas 812008 6112011 In Progress Fronterizas
Laredo District 3C1620057 Radar Base 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$62059500
$98352700
$12350000
$20628000
$67220000
$565323100
$15550000
$328719700
$25523000
$20058400
As of 08312010 Page 27 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C1620034 Hopedale 812008 312011 In Progress
Laredo District 3C1620008 Cedar Ridge 812008 1112011 In Progress
Laredo District 3C1620006 Big River Park 812008 8312010 Completed
Laredo District 92220012 City of Encinal 812008 312011 In Progress
Laredo District 3C1360001 Spofford 812008 8312010 Completed
Laredo District 3C1360002 Brackettville 812008 612011 In Progress
Laredo District 2C2330004 Lakeview estates 612005 5312007 Completed
Laredo District 2C1620020 Eagle Heights 1shy 612005 5312007 Completed 4
Laredo District 3C2330018 Rancho del Rio 812008 6112011 Completed
Laredo District 2C2330009 Rio Bravo 612005 5312007 Completed
Laredo District 2C1620015 Deer Run 1-5 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$61184000
$44579300
$4726300
$16341000
$85503000
$10679200
$100147200
$132200000
$47293200
$18125000
$224970000
As of 08312010 Page 28 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C1620065 South Elm Creek 612005 5312007 Completed 1-4
Laredo District 2C1620006 Big River Park 612005 5312007 Completed
Laredo District 2C1620026 Elm Creek 1 amp 2 612005 5312007 Completed
Laredo District 2C1620050 Los Guajillos 612005 5312007 Completed
Laredo District 2C1620030 Green Acres 612005 5312007 Completed
Laredo District 2C1620014 Chula Vista 612005 5312007 Completed School Blocks
Laredo District 2C1360001 Spofford 612005 5312007 Completed
Laredo District 3C1620025 El Pueblo Nuevo 812008 6112011 In Progress
Laredo District 3C2330019 Rise Estates 812008 6112011 Completed
Laredo District 3C2330001 Amistad Acres 812008 812010 Completed
Laredo District 3C2400009 D-5 Acres 812008 6112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23775000
$7945000
$52775000
$50150000
$30625000
$7789600
$60332300
$337839471
$98472100
$77487600
$7971100
As of 08312010 Page 29 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C2400048 Ranchitos 812008 6112011 In Progress Penitas West
Laredo District 3C2400058 Rio Bravo Annex 812008 8112011 In Progress
Laredo District 3C2540008 La Pryor 812008 2112011 In Progress
Laredo District 3C2540002 Batesville 812008 2112011 In Progress
Laredo District 3C2540006 Chula Vista 812008 8312010 Completed
Laredo District 2C1420002 Encinal 612005 5312007 Completed
Laredo District 2C0660015 Mi Tierra 612005 5312007 Completed
Laredo District 2C2330003 Cienegas Terrace 612005 5312007 Completed
Laredo District 3C0640004 Carrizo Hills 812008 8312010 Completed
Laredo District 3C0640001 Asherton 812008 8312010 Completed
Laredo District 3C0660003 Cadena 812008 3112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$157520200
$62973490
$20202805
$10440121
$11857074
$14189400
$4494600
$90210263
$10008800
$28800000
$29975600
As of 08312010 Page 30 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 3C0660001 Benavides 812008 7312011 In Progress
Laredo District 2C0660012 La Masa 612005 5312007 Completed
Laredo District 2C0660016 North Buena 612005 5312007 Completed Vista
Laredo District 2C0660008 Four As 612005 5312007 Completed
Laredo District 2C0640005 Caterina 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2540006 Chula Vista 612005 5312007 Completed
Laredo District 2C2540002 Batesville 612005 5312007 Completed
Laredo District 2C2400039 Ranchitos 359 612005 5312007 Completed East
Laredo District 2C2400048 Ranchos Penitas 612005 5312007 Completed West
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$269500000
$6483000
$3224000
$8996200
$28925000
$13431120
$2600168
$8639520
$37703500
$112732000
As of 08312010 Page 31 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Laredo District 2C2400024 Los Altos 612005 5312007 Completed
Laredo District 2C2540008 La Pryor 612005 5312007 Completed
Laredo District 2C2400009 D-5 Acres 612005 5312007 Completed
Laredo District 2C2400054 Tanquecitos S 612005 5312007 Completed Acres 1-2
Laredo District 2C2400051 San Carlos 1-2 612005 5312007 Completed
Laredo District 2C2400034 Old 612005 5312007 Completed Milwaukee East amp West
Odessa District 2C2220002 Sanderson 612005 5312007 Completed
Odessa District 2C2220001 Dryden 612005 5312007 Completed
Odessa District 3C0240006 Sanderson 812008 1012011 In Progress
Odessa District 2C2220003 Sanderson amp 612005 5312007 Completed Dryden
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$56930600
$20221760
$24108300
$123001500
$144200200
$42378600
$12675000
$7645200
$93650300
$37340000
As of 08312010 Page 32 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310026 Cameron Park 812008 512011 In Progress
Pharr District 3C0310058 El Camino 812008 812010 Completed Angosto
Pharr District 3C0310034 Laureles 812008 8312010 Completed
Pharr District 3C0310093 Leal 812008 212011 In Progress
Pharr District 3C0310141 Santa Rosa 812008 8312010 Completed Annex
Pharr District 3C0310157 Tierra Bonita 3 812008 8312010 Completed
Pharr District 3C0310173 Yznaga 1 812008 8312010 Completed
Pharr District 2C2140049 El Quiote 612005 5312007 Completed
Pharr District 2C2140061 Falcon Heights 612005 5312007 Completed
Pharr District 3C0310121 Ranchito 812008 812010 Completed
Pharr District 3C0310006 Alto Real 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$661766700
$24338600
$11363500
$22984600
$11106200
$54120900
$21278700
$3250000
$3668960
$92725600
$6092500
As of 08312010 Page 33 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140108 Lago Vista 612005 5312007 Completed
Pharr District 2C2140030 De Los Santos 612005 5312007 Completed
Pharr District 2C1080495 North Capisallo 612005 2112011 In Progress
Pharr District 2C2140184 Rivera 612005 5312007 Completed
Pharr District 3C0310081 La Paloma 812008 8312010 Completed Townsite
Pharr District 2C2140170 Pena 1 612005 5312007 Completed
Pharr District 2C2140069 Francisco 612005 5312007 Completed Rodriguez
Pharr District 2C2140124 Los Morenos 612005 5312007 Completed
Pharr District 2C2450007 Lisa 612005 5312007 Completed
Pharr District 2C2450003 Colonia Los 612005 5312007 Completed Angeles
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11053006
$8467293
$6512691
$7097828
$47502700
$5512568
$2201359
$4022916
$24784000
$2965700
As of 08312010 Page 34 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2530020 Medina Addition 612005 5312007 Completed
Pharr District 2C2530032 Siesta Shores 1 612005 5312007 Completed
Pharr District 3C0240006 Flowella 812008 8312010 Completed
Pharr District 3C0310168 Villa Pancho 812008 8312010 Completed
Pharr District 3C0310062 Grande Acres 812008 8312010 Completed
Pharr District 3C0310089 Las Yescas 812008 8312010 Completed
Pharr District 3C0310084 Laguna 812008 8312010 Completed Escondida Heights 2
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 3C0310127 Reid Hope King 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$93950496
$43584404
$24127640
$20496300
$20565300
$11824700
$3323500
$32649400
$5260652
$32225500
As of 08312010 Page 35 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C0310087 Las Palmas 812008 812010 Completed
Pharr District 2C2140131 Margarita 612005 5312007 Completed
Pharr District 2C2140011 BampE 612005 5312007 Completed
Pharr District 2C2140150 Moraida 612005 5312007 Completed
Pharr District 2C2140057 Escobar 1 612005 5312007 Completed
Pharr District 2C2140157 North Refugio 612005 5312007 Completed
Pharr District 2C2140205 Santa 612005 5312007 Completed Rosa
Pharr District 2C1080576 RC Babb 2 612005 5312007 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080412 Las Haciendas 612005 5312007 Completed
Pharr District 2C1080244 El Mesquite 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$190324300
$3054631
$1732900
$6325337
$27008200
$17753000
$13343700
$6668778
$17166687
$16998304
$9824100
As of 08312010 Page 37 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080368 La Blanca 612005 5312007 Completed Heights
Pharr District 2C1080543 Palma 612005 2112011 In Progress Subdivision 2
Pharr District 3C2140191 Salineno South 812008 8312010 Completed
Pharr District 2C1080167 Colonia Big 5 612005 5312007 Completed
Pharr District 2C1080128 Calma Estates 612005 5312007 Completed
Pharr District 2C1080350 Jessan 612005 5312007 Completed Subdivision
Pharr District 2C1080042 Amber Land 612005 5312007 Completed Subdivision
Pharr District 2C1080541 Palma 612005 2112011 In Progress Subdivision 1
Pharr District 2C1080575 RC Babb 1 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11564164
$11392401
$16602777
$51958238
$4093188
$3735000
$8225451
$11928962
$3387975
As of 08312010 Page 38 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080482 Morning Side 612005 5312007 Completed Estates
Pharr District 2C1080577 RC Babb 3 612005 5312007 Completed
Pharr District 2C1080631 Rosedale Heights 612005 5312007 Completed
Pharr District 2C1080365 LJ 1 612005 5312007 Completed
Pharr District 2C1080693 South Side 612005 2112011 In Progress Village
Pharr District 2C1080247 El Paraiso 612005 5312007 Completed Subdivision
Pharr District 2C1080911 Resub Plat of 612005 5312007 Completed Jimenez Subdivision
Pharr District 2C1080250 El Sol 612005 5312007 Completed Subdivision 1
Pharr District 2C1080785 Villa del Mundo 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$4255090
$2167554
$13196789
$25272400
$4518536
$30045548
$7570000
$30382572
$33603180
As of 08312010 Page 39 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080837 Walton Division 612005 5312007 Completed
Pharr District 2C1080620 Roadrunner 2 612005 5312007 Completed
Pharr District 2C1080793 Ware County 2 612005 5312007 Completed
Pharr District 2C1080612 Rena Rae 612005 5312007 Completed Subdivision
Pharr District 2C1080137 Capisallo Park 612005 5312007 Completed
Pharr District 2C0240010 Rush Addition 612005 5312007 Completed
Pharr District 2C0240003 Cantu Addition 1 612005 5312007 Completed
Pharr District 2C0310050 Encantada 612005 5312007 Completed
Pharr District 2C0310155 Tierra Bonita 1-2 612005 5312007 Completed
Pharr District 2C0310104 Lozano 612005 5312007 Completed
Pharr District 2C0310082 Lago 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7117320
$34196753
$4987973
$15210280
$39757135
$2017600
$17348200
$13006629
$13973387
$44120511
$20093875
As of 08312010 Page 40 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C0310051 Esparza Unit 1-2 612005 5312007 Completed
Pharr District 2C0310011 Arroyo Colorado 612005 5312007 Completed Estates
Pharr District 2C0310075 Juarez 612005 5312007 Completed
Pharr District 2C0310057 Galpin 612005 5312007 Completed
Pharr District 2C1080252 Eldora Gardens 612005 5312007 Completed
Pharr District 2C0310130 Rutherfordshy 612005 5312007 Completed Harding Addition
Pharr District 2C1080141 Casa de Los 612005 5312007 Completed Vecinos
Pharr District 2C1080392 La Paloma 1 612005 5312007 Completed
Pharr District 2C1080072 Barney Groves 612005 5312007 Completed Subdivision
Pharr District 2C1080066 Bar 3 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$27025473
$90771085
$37823340
$24798860
$6774000
$85653700
$47554600
$19559783
$5404629
$22652500
As of 08312010 Page 41 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080132 Cana de Azucar 612005 5312007 Completed
Pharr District 2C1080571 Puesta del Sol 612005 2112011 In Progress
Pharr District 2C1080568 Primavera 1 612005 5312007 Completed
Pharr District 2C1080683 South Fork 612005 5312007 Completed Estates
Pharr District 2C1080740 Tiny Acres 612005 2112011 In Progress
Pharr District 2C1080251 El Sol 612005 5312007 Completed Subdivision 2
Pharr District 2C1080070 Bar VI 612005 5312007 Completed
Pharr District 2C1080155 Citrus City Lake 612005 5312007 Completed
Pharr District 2C0310111 Olmito 612005 5312007 Completed
Pharr District 2C1080488 Munoz Estates 612005 2112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$7917812
$25540049
$16613858
$29325000
$8320517
$38116821
$18294222
$7694507
$355812503
$18420187
As of 08312010 Page 42 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080596 Rancho 612005 5312007 Completed Escondido
Pharr District 2C1080322 Hilda 612005 5312007 Completed Subdivision
Pharr District 2C1080384 La Homa Road 612005 5312007 Completed Subdivision
Pharr District 2C1080363 L amp R Garza 612005 2112011 In Progress
Pharr District 2C1080019 Agua Dulce 612005 5312007 Completed
Pharr District 2C1080014 Acevedo 612005 2112011 In Progress Subdivision 4
Pharr District 2C1080240 El Charro 2 612005 5312007 Completed
Pharr District 2C1080071 Barbosa Lopez 1 612005 5312007 Completed
Pharr District 2C1080150 Chapa III 612005 5312007 Completed
Pharr District 2C1080325 Hilda 612005 2112011 In Progress Subdivision 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$24147226
$24982756
$42198976
$5348990
$4426204
$27349420
$44275500
$13772083
$2234192
$6571000
As of 08312010 Page 43 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080152 Chula Vista 612005 5312007 Completed Acres
Pharr District 2C1080199 Country Living 612005 5312007 Completed Estates
Pharr District 2C1080103 Bernal Heights 1 612005 2112011 In Progress
Pharr District 2C1080605 Red Barn 612005 5312007 Completed
Pharr District 2C1080580 RSW Unit 1 612005 5312007 Completed
Pharr District 2C1080897 Mel Gray 612005 5312007 Completed
Pharr District 2C1080406 Las Brisas 612005 2112011 In Progress
Pharr District 2C1240004 Las Lomitas B 612005 5312007 Completed
Pharr District 2C1240003 Las Lomitas A 612005 5312007 Completed
Pharr District 2C2140205 Santa Rosa 612005 5312007 Completed
Pharr District 2C2140171 Pena 2 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13943500
$19002000
$3823086
$5315089
$17683380
$39353765
$49206000
$30914700
$3285400
$14688700
$3050560
As of 08312010 Page 44 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C2140145 Mireles 612005 5312007 Completed
Pharr District 2C2140026 Chapeno 612005 5312007 Completed
Pharr District 2C2140105 La Puerta 2 612005 5312007 Completed
Pharr District 2C1080784 Villa Capri 612005 5312007 Completed Subdivision
Pharr District 2C1080510 Old Rebel 612005 5312007 Completed Heights II
Pharr District 2C1080312 Havana 612005 2112011 In Progress Subdivision
Pharr District 2C1080129 Calma Estates 2 612005 5312007 Completed
Pharr District 2C1080391 La Palma 612005 5312007 Completed Subdivision
Pharr District 2C1080130 Calma Estates 3 612005 5312007 Completed
Pharr District 2C1080804 West Mer 612005 5312007 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9836624
$5934845
$7043800
$9514000
$15042346
$11771745
$5822267
$16641476
$3723420
$6466182
As of 08312010 Page 45 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080461 Mid Valley 612005 5312007 Completed Estates
Pharr District 2C1080015 Acosta 612005 2112011 In Progress Subdivision
Pharr District 2C1080318 High Land 612005 5312007 Completed
Pharr District 2C1080105 Bernal 612005 5312007 Completed
Pharr District 2C1080245 El Monte 612005 5312007 Completed
Pharr District 2C1080230 Dimas 3 612005 2112011 In Progress
Pharr District 2C1080865 Dimas 1 612005 5312007 Completed
Pharr District 2C2140231 Garza Salinas 2 612005 5312007 Completed
Pharr District 2C1080509 Old Rebel 612005 5312007 Completed Heights
Pharr District 2C1080406 Las Brisas 612005 5312007 Completed Estates
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$9745026
$11503816
$10545793
$7102962
$10941780
$7187326
$6925922
$21513232
$15402059
$8776793
As of 08312010 Page 46 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080585 Rambo Estates 612005 2112011 In Progress
Pharr District 2C1080385 La Homa Road North Subdivision
612005 2112011 In Progress
Pharr District 2C1080427 Los Ebanos Subdivision
612005 2112011 In Progress
Pharr District 2C1080767 Val Bar Estates 612005 2112011 In Progress
Pharr District 2C1080267 Ezequiel Acevedo Jr Subdivision 2
612005 5312007 Completed
Pharr District 2C1080494 North Alamo Village
612005 5312007 Completed
Pharr District 2C1080503 Northside Village 2
612005 5312007 Completed
Pharr District 2C1080484 Morning Sun 612005 2112011 In Progress
$5744144
$13820000
$8320000
$7378045
$11580760
$21584074
$10518427
$10553999
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 47 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 2C1080498 North Cross 612005 5312007 Completed Estates
Pharr District 2C1080557 Pentecostal 612005 5312007 Completed
Pharr District 3C2140052 El Socio 812008 812010 Completed
Pharr District 3C1080228 Diaz Subdivision 812008 512011 In Progress
Pharr District 3C2140097 La Esperanza 812008 8312010 Completed
Pharr District 3C2140203 Santa Cruz 812008 212011 In Progress Industrial Park
Pharr District 3C2140087 Indio 812008 8312010 Completed Subdivision 2
Pharr District 3C2140103 La Paloma 812008 8312010 Completed Ranchettes
Pharr District 3C2140007 Amada Acres 812008 8312011 Completed
Pharr District 3C2140131 Margarita 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$13300000
$9407500
$5157591
$6459518
$19402466
$11000000
$3315001
$21296258
$1006333
$2511774
As of 08312010 Page 48 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140207 Share 52 812008 112011 In Progress
Pharr District 3C2140120 Los Barreras 812008 8312010 Completed North
Pharr District 3C2140062 Falconaire 812008 8312010 Completed
Pharr District 3C2140015 Buena Vista 812008 8312010 Completed
Pharr District 3C2140110 Las Palmas 812008 8312010 Completed
Pharr District 3C2140202 Santa Cruz 2 812008 212011 In Progress
Pharr District 3C2140161 Rivereno 812008 8312010 Completed
Pharr District 3C2140166 Olmito 1 amp 2 812008 8312010 Completed
Pharr District 3C2140049 El Quiote 812008 812010 Completed
Pharr District 3C2140173 Rafael Pena 812008 8312010 Completed
Pharr District 3C2140053 Elias-Fela Solis 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$23000000
$2574952
$5254411
$4151847
$3435305
$8946800
$2314163
$11935365
$10420264
$1226063
$2532075
As of 08312010 Page 49 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140107 Zarate 812008 8312010 Completed
Pharr District 3C2140158 North Santa Cruz 812008 212011 Completed
Pharr District 3C2140044 El Castillo 812008 812010 Completed
Pharr District 3C2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C1240003 Las Lomitas A 812008 112011 In Progress
Pharr District 3C1240002 Hebbronville 812008 312011 In Progress
Pharr District 3C1080780 Vereda Tropical 812008 812011 In Progress
Pharr District 3C1080460 Mesquite Acres 812008 712011 In Progress Subdivision
Pharr District 3C2140160 Northwest 812008 8312010 Completed Industrial Park
Pharr District 3C2140045 El Cenizo 812008 112011 In Progress
Pharr District 3C2140155 Nina 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$2857433
$29804439
$11101434
$2584609
$40568203
$52999434
$14496718
$22416971
$7500000
$352008
$8867109
As of 08312010 Page 50 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2450006 Lasara 812008 8312010 Completed
Pharr District 3C1080882 La Flor Estates 812008 812011 In Progress
Pharr District 3C2450014 Sebastian 812008 8312010 Completed
Pharr District 3C2450005 Hugh Terry 812008 8312010 Completed Subdivision
Pharr District 3C2450003 Colonia Los 812008 8312010 Completed Angeles
Pharr District 3C2140227 Villarreal 812008 812010 Completed
Pharr District 3D2140052 El Socio 812008 812010 Completed
Pharr District 3D2140173 Rafael Pena 812008 112011 In Progress
Pharr District 3D2140178 Rancho Viejo 1 812008 112011 In Progress
Pharr District 3C2140037 E Lopez 812008 112011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$11190408
$9196725
$11665171
$5456039
$5806470
$15595970
$8322410
$3041805
$3354590
$13772720
As of 08312010 Page 51 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140177 Ranchitos del 812008 8312010 Completed Norte
Pharr District 3C2140104 La Puerta 812008 812010 Completed
Pharr District 3C2450006 Lasara 812008 112011 In Progress
Pharr District 3C2140228 West Alto Bonito 812008 312011 In Progress
Pharr District 3C2140139 Midway 812008 8312010 Completed
Pharr District 3C2140161 Old Escobares 812008 8312010 Completed
Pharr District 3C2140107 La Rosita 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3D2140158 North Santa Cruz 812008 8312010 Completed
Pharr District 3D2140105 La Puerta 2 812008 8312010 Completed
Pharr District 3C2140233 Roma Creek 1 812008 212011 In Progress 2 amp 3
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21712960
$8736030
$7757285
$25251053
$26087359
$23565500
$9146333
$3088561
$40730000
$6868528
$62620085
As of 08312010 Page 52 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C2140059 Eugenio Saenz 812008 8312010 Completed
Pharr District 3C2140011 BampE 812008 8312010 Completed
Pharr District 3C2140167 Pablo Pena 812008 8312010 Completed
Pharr District 3C2140153 Narciso Pena 812008 8312010 Completed
Pharr District 3C2140224 Victoria Vera 812008 812010 Completed
Pharr District 3C1080063 Balli Estates 812008 512011 In Progress
Pharr District 3C1080262 Esperanza 812008 812011 In Progress Estates
Pharr District 3C1080324 Hilda 812008 8312010 Completed Subdivision 2
Pharr District 3C1080940 Sundowns 812008 8312010 Completed Retirement Center
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$1843545
$13258277
$3345225
$1407705
$6209775
$53661227
$20234281
$18202000
$20976574
As of 08312010 Page 53 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080380 La Homa Grove 812008 8312010 Completed Estates
Pharr District 3C1080937 Aldamas 812008 312011 In Progress Subdivision 1 amp 2
Pharr District 3C1080079 Basham 14 812008 512011 In Progress
Pharr District 3C1080319 High Point 812008 8312010 Completed Subdivision
Pharr District 3C1080454 McColl Estates 812008 212011 In Progress
Pharr District 3C1080329 Hoehn Drive 812008 8312011 In Progress Subdivision
Pharr District 3C1080082 Basham 18 812008 8312011 Completed
Pharr District 3C1080855 Ash County 812008 612011 In Progress
Pharr District 3C1080148 Chapa North 812008 8312010 Completed
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$15522567
$51584913
$24725109
$12118680
$18129771
$45702263
$16720705
$13030535
$8577058
As of 08312010 Page 54 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080886 Laborsita 812008 8312010 Completed
Pharr District 3C1080055 Ariel Hinojosa Subdivision
812008 712011 In Progress
Pharr District 3C1080687 South Palm Gardens Estates 1
812008 8312010 Completed
Pharr District 3C1080461 Mid-Valley Estates
812008 912011 In Progress
Pharr District 3C1080274 Foster Subdivision
812008 712011 In Progress
$37740000
$11251043
$8967617
$6002448
$14580195
$5875911
$23485095
$11110800
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 55 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080891 Los Encinos 2 812008 8312010 Completed
Pharr District 3C1080883 La Flor Gardens 812008 812011 In Progress
Pharr District 3C1080406 Las Brisas 812008 512011 In Progress
Pharr District 3C1080397 La Suena 812008 612011 In Progress
Pharr District 3C1080790 Village Grove 2 812008 8312010 Completed
Pharr District 3C1080220 Delta West 812008 712011 In Progress Subdivision
Pharr District 3C2530032 Siesta Shores 812008 8312010 Completed
Pharr District 3D1080536 Palm Lake 812008 712011 In Progress Estates 1
Pharr District 3C1080465 Miller Resub 812008 812011 In Progress Lot A
Pharr District 3C1080185 Colonia Whalen 812008 412011 In Progress Road
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$21790503
$9196525
$17750000
$35759936
$4240791
$35556853
$202354000
$19784900
$13700283
$12480317
As of 08312010 Page 56 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080470 Monica Acres 812008 812010 Completed
Pharr District 3C1080752 Trenton Terrace 812008 812011 In Progress
Pharr District 3C1080421 Loma Linda 812008 812011 In Progress Heights
Pharr District 3C1080141 Casa de los 812008 812011 In Progress Vecinos
Pharr District 3C1080779 Valley View 812008 312011 In Progress Estates
Pharr District 3C1080895 Mary Ann 812008 8312010 Completed
Pharr District 3C1080423 Los Castillos 812008 212011 In Progress Estates
Pharr District 3C1080181 Colonia Saenz 812008 4112011 In Progress
Pharr District 3C1080232 Colonia Boyce 812008 8312010 Completed
Pharr District 3C1080860 Chapa 2 (SL9) 812008 312011 In Progress
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
$10869753
$27584000
$65074750
$53824712
$14492334
$24846866
$8152423
$6701891
$13454758
$34306856
As of 08312010 Page 57 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Pharr District 3C1080657 Seminary Village Subdivision
812008 712011 In Progress
Pharr District 3C1080387 La Mesa Subdivision
812008 512011 In Progress
Pharr District 3C1080890 Los Encinos 1 812008 8312010 Completed
Pharr District 3C1080154 Citriana Village 812008 8312010 Completed
$6432518
$18975759
$8611790
$17140000
$20998086
$8458500
$48566996
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 59 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 60 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Alpine 5786 61162 Distribution System Improvements
11292007 11292010 In Progress DWSRF $486000000
Anthony 4072 72252 WWTP Replacement
372011 362013 In Progress CWSRF $400000000
Aransas Pass
Batesville WSC
Brady
8400
1476
5523
71848
10341
72334
Goodnight Lift Station amp Relief Line
Water Supply amp Wastewater Improvements
Wastewater Treatment Improvements
762006
4142003
12312010
5222007
10102008
12312011
Completed
Completed
In Progress
CWSRF
EDAPCWTAP
CWSRF
$111500000
$436073800
$200000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 63 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Brady 6118 21535 Water amp Sewer 3102006 10122006 Completed Line Replacement
Brady 6118 60537 New SWTP amp 10122003 5112007 Completed Storage Tank
Brownsville 72495 Sanitary Sewer 1182010 1232012 In Progress Overflow Projects
Brownsville 500 10378 Villa Nueva 5272008 112013 In Progress Colonia
Brownsville 3175 10344 FM 511-802 4292008 112014 In Progress Project
Brownsville 1553 10063 Valle Hermosa 12112006 2162010 Completed amp Valle Escondido
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Del 61580 Water System 11302010 11292013 In Progress Rio Replacement
Phase 1
Del 71532 Collection amp 4182006 6192007 Completed Rio Treatment
Improvements
Donna 2000 10371 Western 7202009 1152010 In Progress Colonias Project
Eagle 10363 Regional 2172009 112015 In Progress Pass Systems Phase
II
Eagle 71533 Regional 10292010 In Progress Pass Wastewater
System
Eagle 60813 Regional Water 5122003 10292010 In Progress Pass System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF $1000000000
CWSRF $219000000
CWTAP $1425800000
EDAP PAD $48500000
EDAPCWTAP $4208882300
CWTAP $6515158100
As of 08312010 Page 65 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 66 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Junction 2648 60736 Membrane Water Treatment Plant
11192007 472010 Completed
Karnes City
3457 61347 Distribution System Replacement
2232009 11302011 In Progress
Kermit 5714 72103 WWTP Replacement
10252010 10252011 In Progress
Kerr County
1200 10366 Center Point Wastewater System
10282008 112014 In Progress
La Feria
8305 62389 WTP Filter Replacement
182010 11192010 In Progress
DWSRF $396000000
DWSRF $360000000
CWSRF $459500000
EDAP Active PAD shyTotal Estimated Cost $12670000
DWSRF ARRA
$17850000
$88000000
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 69 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
La 8000 10231 Water amp 10112004 3302010 Completed Feria Wastewater
System Expansion
La 8000 10368 Regional 10282008 112015 In Progress Grulla Wastewater
System
La 4790 72022 WWTP 432007 11302011 In Progress Joya Replacement
Laredo 61651 Water Capital 142010 722012 In Progress Improvements
Laredo 10409 Municipal Water 9172009 112012 In Progress Rights
Laredo 4118 10045 Mines Road amp 262003 1212011 In Progress State Highway 359
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
EDAPCWTAP
EDAP Active PAD shyTotal Estimated Cost $38100000
CWSRF
DWSRF ARRA
EDAP
EDAPCWTAP
As of Page 70 of 81 Rev
$1188267000
$184230000
$672000000
$4819600000
$1500000000
$2793335300
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
T S S U R A W P H E T C S B I A E R E I N R V R
N D E G
Lower Valley 72059 Collection 9182008 1242014 In Progress WD System
Extensions
Marfa 2424 72142 Effluent Storage 1152010 6302012 In Progress Pond
McAllen 72933 North WWTP 2152010 2282013 In Progress Expansion
Mercedes 18049 72126 WWTP 142010 11302012 In Progress Expansion
Mercedes 13649 71832 Four Lift 4142008 5272009 Completed Stations
Mercedes 3885 10029 Colonia Water amp 10152001 3182008 Completed Wastewater Service
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
CWSRF
CWSRF
CWSRF ARRA
CWSRF ARRA
CWSRF
EDAPCWTAP
As of Page 72 of 81 Rev
$2060000000
$126500000
$3948500000
$1727880200
$126500000
$928931600
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Mission 61740 North WTP 332010 10292012 In Progress Expansion
Mission 10200 Northwest 6222004 8252008 Completed Mission Wastewater System
Moore 516 10238 New Wastewater 692008 2262009 Completed WSC System
Nueces River 1200 72045 Leakey 4292014 In Progress Authority Wastewater
System
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF ARRA
DWSRF
DWSRF ARRA
EDAPCWTAP
EDAP
EDAP Active PAD Total Estimated Cost $11380000
As of Page 73 of 81 Rev
$1089500000
$1943000000
$828500000
$3371909100
$195896000
$265425000
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Southmost 61531 SRWA 1312011 1312012 In Progress Regional Pretreatment WA System
Taft 3396 72361 New Clarifier amp 3312011 3302012 In Progress Collection Repair
The 71 10361 Project Big 3222007 9172007 Completed Rensselaerville 5 Institute
The 66 10395 Tri-City Acres 1182010 1182011 In Progress Rensselaerville Wastewater Institute
The 100 10382 Unidos en 1212008 6202009 Completed Rensselaerville Hargill shyInstitute Wastewater
The 135 10385 Unidos en 1212008 10282009 Completed Rensselaerville Hargill shyInstitute Water
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads
DWSRF
CWSRF
CSHP
CSHP
CSHP
$1309000000
$578000000
$3502100
$4400000
$8860900
CSHP $11144600
Page 78 of 81 As of Rev
08312010 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 79 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
5212009 112012 In Progress EDAP Active PAD shyTotal Estimated Cost $975000
$10100000
Zavala Co WCID 1
2158 10340 La Pryor Water amp Wastewater Systems
11242001 872011 In Progress EDAPCWTAP $869100500
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 80 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010
Agency Applicant People Project Project Name Start Date End Date Status W W H H C D N R O Other Funding Served Number A A H O U R E E T Description
Initiative Abbreviations WASTE = Wastewater Initiative HHSC = Health and Human Services Commission CURB = Curb and Gutter Initiatives As of 08312010 DRAIN = Drainage and Sewage Initiatives NEW RD = Creation of New Roads REPAVE = Repaving of New Roads Page 81 of 81 Rev 01212010