Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012
8

Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.

Mar 27, 2015

Download

Documents

Ethan Purcell
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.

Projects in the Forest Grove area

Presented by: David Kim, ODOT Metro West Area Manager

August 13, 2012

Page 2: Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.

U.S. 26: Glencoe Road Interchange Project

Page 3: Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.

• Improve safety, capacity and traffic flow of the interchange

• $32 million dollars from the 2009 Jobs and Transportation Act

• Most traffic impacts at night. During any ramp or road closures, a signed detour will be in place.

• Complete in summer 2014

Page 4: Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.

• Replace the Glencoe Road bridge over U.S. 26 with a new, four-lane bridge, and improve vertical clearance

• Improve pedestrian and bicycle connections on the new bridge

• Lengthen and widen the U.S. 26 westbound off-ramp

Page 5: Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Page 6: Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.

• $3.3 million funded through the Statewide Transportation Improvement Program (STIP)

• Daytime and nighttime lane closures on OR 8

• Completion in December 2012.

Page 7: Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.

• Repair pavement, grind, pave and restripe OR 8 from 331st Avenue to Quince Street

• Upgrade sidewalk curb ramps to ADA standards

• Stripe a new crosswalk across OR 8 on the east side of intersection with Quince Street:– Add a pedestrian signal for the new

crosswalk– Add a raised pedestrian island at the

south end of the new crosswalk

Page 8: Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.

Local Agency Projects

• Council Creek Trail: Banks to Hillsboro – trail master plan. $218,000 federal money.

• Harvey Clarke Elementary School Sidewalk Improvement – Safe Routes to School. $300,000 federal money.

• OR8/OR47 Intersection Improvements - $1.3 million federal money.