Top Banner
Project title : “ Emission reduction based on the use of energy-efficient lighting in Senegalese rural electrification program”
17

Project title :

Jan 19, 2016

Download

Documents

xerxes

Project title : “ Emission reduction based on the use of energy-efficient lighting in Senegalese rural electrification program” By : Ousmane Fall SARR. INTRODUCTION. National pop: 11.9 million inhabitants (july 2006), Land area: 192,530 sq km (74,336 sq miles), - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project title  :

Project title : “ Emission reduction based on

the use of energy-efficient lighting in Senegalese rural

electrification program” By : Ousmane Fall SARR

Page 2: Project title  :

National pop: 11.9 million inhabitants (july 2006), Land area: 192,530 sq km (74,336 sq miles), GNI per capita (US$): 470, 2002 GDP(US$ billion): 4.9, GDP growth per capita (2002-06) : 2.7 Inflation in 2002: 2.6% Capital: DAKAR

56% of senegalese live in rural areas (in 14 000 villages), In 1997 only 5% of rural housholds have access to electricity, (around 55% in urban area) in 2000, only 600 villages electrified, Rural Electrification rate = 8 % Country Installed capacity : 500 MW, 450 MW peak Rural areas: High energetic demand (pumping, irrigation, transformation of agr.

products, etc.) and low income,

MAIN OBSTACLES RURAL ELECTRIFICATION DEVELOPMENT: A unique electrification option: grid ext. (very expensive) Huge spreading of rural habitats, irregularity and weakness of incomes in rural

areas, Not enough public resources and scarce available funds for th electricity sector,

Page 3: Project title  :

Rural Electrification: Situation in 2000

Page 4: Project title  :

• Diversification of financing sources,• Creation of new bodies : Regulation (CRSE) and Rural

Electrification Agency (ASER). Senelec is responsible for generation, transmission and distribution within its own perimeter (urban and some rural)

• Creation of a Rural Electrical Fund• ASER’s Missions:

« promote and implement rural electrification programs by giving technical and financal assistance (subsidy) to all RE actors. »

• ASER’s 0BJECTIVES: - Scale up national RE rate from 16% in 2006 to 50% in 2012.- Give access to electricity to all social institutions (health centers, schools), and other critical multi-sectoral institutions, in order to maximize the impact of RE on poverty reduction and the achievement of the MDGs.

ASER’s STRATEGY : a state planned RE concessional approach based on a PPP

Page 5: Project title  :
Page 6: Project title  :

1. Local Electrification Plan study-> Demand analysis• Energy needs assessment -> demand segmentation (definition of service levels)• Current energy substitutable expenses,• Willingness and capacity to pay• Potential market definition

Segment 1

50 Wc

Segment 2

50 - 90 Wc

Segment 3

90 - 180 Wc

Segment4

+ 180Wc

Number of luminous points (CFL Bulbs)

5 7 12 16

Radio, Radio tape yes yes yes yes

W/B TV 0 0 yes yes

Color TV 0 0 0 yes

Other: video, fan, etc. (Wh/day) Reserve of 150 Wh/d

Page 7: Project title  :

-> Analysis of Electrification Technology Alternatives• Spatial configuration of village and distance from electric

infrastructures,• Cost effectiveness in technological option,

Each concession will be allotted to private operators who will be in charge of :

(i) developing a grid or other technical solutions that will provide electricity to people that did not have access to it;(ii) managing a public utility of electricity services in rural area.

2. An international bidding procedure is adopted in order to choose the best candidate that offers to connect the maximum of consumers for a given Government’s SUBSIDY at known basic TARIFFs.

Page 8: Project title  :

Rural Electrification Concession

ImplementationYear

Estimated nb of consumersIn 2012

1. Saint Louis - Dagana - Podor Feb 2008 39 776

2. Kébemer - Louga - Linguère Jul 2008 33 725

3. Mbour Jul 2008 23 895

4. Kolda - Vélingara Jul 2008 23 282

5. Fatick - Gossas - Kaolack - Nioro Jul 2008 53 705

6. Sédhiou May 2009 21 212

7. Foundiougne Dec 2008 12 667

8. Kaffrine Tamba - Kédougou Dec. 2008 49 428

9. Matam - Bakel May 2009 42 275

10. Diourbel - Bambey - Mbacké Aug 2009 49 444

11. Thiès - Rufisque -Tivaouane Aug 2009 41 837

12. Ziguinchor - Oussouye - Bignona May 2009 23 042

Project Design

Page 9: Project title  :

DURATION PERIOD OF THE RE CONCESSION: 25 years.

CONCESSIONAIRES’ OBLIGATIONS :

• Ensure supply, installation, exploitation and renewal of the electric components, in accordance with its contract.

• For domestic consumers, Internal electric equipments are prefinanced by the concessionaire and these costs are paid back by the consumer within a period of 10 years. Among the Electric components: Compact Fluorescent Lamps (CFLs) of 8 W.RESULTS: removal of the main access barrier but a need

of additional funds

Page 10: Project title  :

Alleviate this main financial barrier that prevent electricity access to rural population: the high cost of energy services in rural area compared to the low income of the potential client. This CDM PoA aims to mobilize the needed finances through CDM revenues.

Incentive to CFLs installation: ASER will prefinance (subsidy) the rural domestic consumer’s interior installations and, the concessionaires systematically use of CFLs.

Page 11: Project title  :

Project title : “ Emission reduction based on the use of energy-efficient lighting in Senegalese rural electrification program”

-> Systematic use of low energy consumption bulbs (CFL) instead of incandescent lamps, for domestic lighting in Senegalese rural areas.

Ensure CDM program implementation and continuity:

Avoid replacing the CFLs by normal light bulb: Installation of devices to limit power demand.

Incentive for good practices and monitoring: CDM revenues partially distributed to concessionaires.

Page 12: Project title  :

Programmatic CDM : PoA Each concession is a CDM project activity (CPA).

Flexible approach: Include gradually each CPA.

Use AMS-IIC (simplified CDM modalities): -Each concession will be under the small-scale threshold (60 GWh per year).- Reduce transactions costs.

Page 13: Project title  :

Baseline or most likely scenario: use of 40 W incandescent lights

Conservative approach: subtract the current use of CFLs in the baseline in Senegal (rural area)

Page 14: Project title  :

Crediting Period: 10 years for each concession

Project Boundaries: Senegal

Leakages: no leakages, no credits requested for CFLs replacement.

Page 15: Project title  :

Simplified equation applied to energy saving:

ERs = (EB EF) – (EPA EF) - leakage [=] t CO2e per year

where EB, PA = Σi(ni pi Oi) [=] kWh per yearni : the number of devices Pi : the power of the device Oi : the average annual operating hours of deviceEF: Emission factor for the electricity displaced (kg

CO2e/ kWh)

Emission reductions = Baseline emissions – Project emissions - Leakage

Baseline emissions project emissions

Emission reductions estimated : 50,000 t per year

Page 16: Project title  :

Emission reductions estimated : 50,000 t per year

If 10 $ per t

Average Cost for Internal : 260 $ US Domestic Equipments (wiring, limiter, bulbs, plugs, cycle stabilizer, etc)

Page 17: Project title  :

Monitoring methodology: AMS IIC.

Parameters monitored: Energy consumed and average annual operating hours.

Sampling is allowed under AMS IIC:- Typically for EE projects: 5% is accepted.- This number could be reduced if it can be demonstrated that monitoring results will be similar (i.e. survey can be used).