Project Synopsis Road signalling system for traffic movement management SANJEET KUMAR L&T BIS XI Batch Indian Institute of Technology, Madras
11

Project Synopsis

Nov 13, 2014

Download

Business

guest1ebb7a

Problem are and relevant issues discussed.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Synopsis

Project SynopsisRoad signalling system for traffic movement management

SANJEET KUMARL&T BIS XI BatchIndian Institute of Technology, Madras

Page 2: Project Synopsis

Problem Area: The Indian Scenario

• Most of the traffic signal controllers installed across the Country are first generation, fixed time controllers

• Only two cities (New Delhi and Pune) has the Area Traffic Control System (ATCS)– New Delhi - 63 Junction (imported from UK)– Pune - 38 Junctions (developed by C-DAC)

Even this is a very small percentage

04/08/23SANJEET KUMARPage 2

Page 3: Project Synopsis

Disadvantages of Fixed time traffic signal controllers

• The timing plans are based on historical data, which may not be an accurate reflection of typical conditions

• The timing plans rapidly age and the benefits achieved decrease

• The system cannot respond to unpredictable events

04/08/23SANJEET KUMARPage 3

Page 4: Project Synopsis

Result of fixed time controller

• Wasted Green time• Unresolved Queues• Minor Accidents at the intersection

04/08/23SANJEET KUMARPage 4

Page 5: Project Synopsis

Types of Signal Control logic

04/08/23SANJEET KUMARPage 5

Page 6: Project Synopsis

Challenges in implementing an Actuated traffic control on Indian roads

• Traffic is not lane following• A vehicle entering the approach (upstream) on

a particular lane need not maintain the same at the intersection

• High mix of traffic• Uncontrolled side roads and on-street parking• Obtaining a correct measure of traffic count is

highly complex • Data loss due to power failure• Network failure• Availability of funds

04/08/23SANJEET KUMARPage 6

Page 7: Project Synopsis

Homogeneous, lane following

traffic

Typical flow on Indian Road

04/08/23Page 7 SANJEET KUMAR

Page 8: Project Synopsis

04/08/23SANJEET KUMARPage 8

Typical Indian Road Condition

• There is not, physically, as much road space and roads are not always planned and designed for efficient traffic use

• The roads are called upon to perform a wide variety of functions which includes non-traffic use – for example, the co-existence of

market stalls and through traffic on the same road space

• Segregated footpaths are often poorly provided or used for other purposes, forcing pedestrians to use the roadway

• Vehicle growth rates are very high• Vehicle mix can cover a wide range of

types and characteristics, from bicycles and bullock-carts to articulated trucks

Page 9: Project Synopsis

On Street Parking

A typical parking pattern seen on Indian Roads

04/08/23Page 9 SANJEET KUMAR

Page 10: Project Synopsis

Addressing the Challenges : Systems Available

• Area Traffic Control System (implemented in INDIA)– A Composite Signal Control Strategy for Indian Roads, Indian

Highways, August 2006 issue of The Indian Roads Congress, New Delhi

• Urban Traffic control System– Optimizing Networks of Traffic Signals in Real Time-The SCOOT Method,

IEEE Transactions on Vehicular Technology, Feb 1991

• Area-wide Real time traffic control System– The Area-wide Real-Time Traffic Control (ARTC) System: A New Traffic

Control Concept, IEEE Transactions on Vehicular Technology, May 1993

• Intelligent traffic Control System