    S.No Documents

    1 Post Tender Meeting

    1.1 Finalisation of Vendors

    1.2 Engineering and Design Serivces

    2 Drawing Numbers for (I&II)

    3 Tite !oc" Numbers for (I&II)

    # $S% Document

    4.1 Loss and Prevention Program

    !ase Design Submission

    .1 'onductor 

     A TD for ACSR condctors!"#""$ %&TP'

    a.Data Sc(edle !1)*T+SS*)1 %rev.)1'$

    c.T,-e Test Re-ort

    d.+anfactres res-onsiilit, Statement

    e.An, ot(er /alif,ing Docments !Certification$

    0"TP of Condctor 

    .2 P*

     A TD of P&*" %&TP'

    Data Sc(edle for P& 3 4 Cores.

    Com-liance Statement ! )1*T+SS*)15 1)*T+SS*)4 Rev.)1 $

    T,-e test re-ort.+anfactres res-onsiilit, Statement

    .Com-liance Statement !)1*T+SS*)1%rev.)2'51)*T+SS*)1%rev.)1'$

  • 8/17/2019 Project Status_302 (Version 1)

    2/101

     An, ot(er /alif,ing docments.

    Drm dra6ing.

    0 TD of P&*"" %&TP'

    Data Sc(edle for P& 3 4 Cores.

    Com-liance Statement ! )1*T+SS*)15 1)*T+SS*)4 Rev.)1 $

    T,-e test re-ort.

    +anfactres res-onsiilit, Statement

     An, ot(er /alif,ing docments.Drm dra6ing.

    "TP of P&

    .3 Towers

     A TD of To6er * "

    Data Sc(edle for S175 TA175 TA275 TA87 # DE to6ers.

    T,-e test re-ort.

    +anfactres res-onsiilit, Statement. An, ot(er /alif,ing docments

    0 TD of To6er * ""

    Data Sc(edle for S175 TA175 TA275 TA87 # DE to6ers.

    T,-e test re-ort.

    +anfactres res-onsiilit, Statement.

     An, ot(er /alif,ing docments

    C S(o- # Erection Dra6ings of S17 !)*29 $to6er *"

    D S(o- # Erection Dra6ings of S17 !)*29$ to6er *""

    E S(o- # Erection Dra6ings of TA17 !29*1)9$ to6er *"

    F S(o- # Erection Dra6ings of TA17 !29*1)9$ to6er *""

    & S(o- # Erection Dra6ings of TA27 !1)9*8:9$ to6er *"

    ; S(o- # Erection Dra6ings of TA27 !1)9*8:9$ to6er *""

    " S(o- # Erection Dra6ings of TA87 !8:9*

  • 8/17/2019 Project Status_302 (Version 1)

    3/101

    T,-e test re-ort.

    +anfactres res-onsiilit, Statement

     An, ot(er /alif,ing docments

    C Strctre "dentification # 6arnings*"

    Strctre "dentification # 6arnings*""

    D ACD5S05Anti T(eft olts5Plant*"

     ACD5S05Anti T(eft olts5Plant*""

    E "TP of "nsl.;ard6are # Condctor Fittings

    . S,acer Dam,er 

     A TD of S-acer Dam-er*"

    0 TD of S-acer Dam-er*""

    C T,-e Test -lan for S-acer Dam-er 

    D "TP of S-acer Dam-er 

    .- Insuator 

     ATD for "nslators!" #""$

    T,-e test re-ort

    +anfactres res-onsiilit, Statement

     An, ot(er /alif,ing docments.

    0 "TP of "nslator 

    .

    Data Sc(edle for F+R5 FC5 =oint o? .

    T,-e test re-ort.

    +anfactres res-onsiilit, Statement

     An, ot(er /alif,ing docments./ rounding

      Data Sc(edle for line (ard6are.

    Com-liance Statement ! 12*T+SS*)1 Rev.)25 )1*T+SS*)1Rev.)25 12*T+SS*)2 Rev.)1$

      Data Sc(edle for "nslator.!1@) 7 # 88)7 Porcelain Long

    Rod "nslators$

    Com-liance Statement ! 1:*T+SS*)4 Rev.)15 )1*T+SS*)1Rev.)1$

    +M0 NM+' INT !4 (P*5P*P*5+')

    Com-liance Statement ! 4*T+SS*)2 Rev.)25 )1*T+SS*)1Rev.)2$

  • 8/17/2019 Project Status_302 (Version 1)

    4/101

     A TD for &ronding*"# ""

    - 0oute 6ignment Drawing

    Sag and Tension 'acuation

    Condctor P&

    / Mid Sa,n 'acuation

    7 Pan and Profie( Portion5I)

    Rote ma- 6it( s-otted strctre

    Strctre List

    Profile

    Sag Tem-late Crve in trans-arent S(eet

    18 Pan and Profie( Portion5II)

    Rote ma- 6it( s-otted strctreStrctre List

    Profile

    Sag Tem-late Crve in trans-arent S(eet

    11 Soi In9estigation

    0oring at site

    Re-ort Smission

    12 6ccess road & Structure

    13 +oundation Design

    Design CalclationFondation Dra6ings

    1# :6;:' Doc.for (I&II)

     A T(ird Part, "ns-ector*To6er !S&S$

    0 T(ird Part, "ns-ector* "nslator 

    C T(ird Part, "ns-ector* P&

    1 Purc

  • 8/17/2019 Project Status_302 (Version 1)

    5/101

    urce of Document

    65acce,ted

    6

    DAR E7&&

    1B2@B2)1@ 6

    1B2@B2)1@ 6

    Coordination *;SE +mai. 4B1B2)1@

    Coordination *;SE +mai.

    +"DAL Cales 2B2B2)1@

    .Coordinator*+mai

    .Coordinator*+mai 4BB2)1@

    LS Cales

    .Coordinator*+mai

    6,,ro9ed=endor;contractor

     ;'om,an>

    S!MISSIN to cientwit< Date

  • 8/17/2019 Project Status_302 (Version 1)

    6/101

    .Coordinator*+mai

    4BB2)1@

    ?PT@

    ign.De-t +mai 8B14B2)1@

    ign.De-t +mai 8B14B2)1@

    ign.De-t +mai 8B

  • 8/17/2019 Project Status_302 (Version 1)

    7/101

    R E7&& 4B18B2)1@

    R E7&& 4B1B2)1@

    .Coordinator*+mai 4B18B2)1@

    .Coordinator*+mai 4B18B2)1@

    .Coordinator*+mai 4BB2)1@

    D6MP5IT6@A

    .Coordinator*+mai

    .Coordinator*+mai

    .Coordinator*+mai

    .Coordinator*+mai

    N?5Insuators

    .Coordinator*+mai8B2B2)1@

    .Coordinator*+mai 4B:B2)1@

    .Coordinator*+mai

     AL ;AR"T;*>SA

  • 8/17/2019 Project Status_302 (Version 1)

    8/101

    6

    6

    6

    6

    6

    6

  • 8/17/2019 Project Status_302 (Version 1)

    9/101

    6,,ro9a of 'ient0emar"s

    '50esubmit

    7ot smitted nder (old

    ! Can Proceed onl, after "TP A--roval

    Smitted 6iating for SEC re-l,

    Smitted 6iating for SEC re-l,

    !5acce,ted as wit<note

  • 8/17/2019 Project Status_302 (Version 1)

    10/101

    Smitted 6iating for SEC re-l,

    Smitted 6iating for SEC re-l,

    ! Rev.)1 nder Pre-aration of ;

    ! Rev.)1 nder Pre-aration of ;

    ! Smitted 6iating for SEC re-l,

    !Smitted 6iating for SEC re-l,

    ! Smitted 6iating for SEC re-l,

    ! Smitted 6iating for SEC re-l,

    ! Smitted 6iating for SEC re-l,

    ! Smitted 6iating for SEC re-l,

    Smitted 6iating for SEC re-l,

    Smitted 6iating for SEC re-l,

    Smitted 6iating for SEC re-l,

    Smitted 6iating for SEC re-l,

    !Smitted 6iating for SEC re-l,

    !Smitted 6iating for SEC re-l,

  • 8/17/2019 Project Status_302 (Version 1)

    11/101

    Smitted 6iating for SEC re-l,

    Smitted 6iating for SEC re-l,

    Smitted 6iating for SEC re-l,

    Smitted 6iating for SEC re-l,

    Smitted 6iating for SEC re-l,

    'Smitted 6iating for SEC re-l,

    '

    Smitted 6iating for SEC re-l,

    Smitted 6iating for SEC re-l,

    Smitted 6iating for SEC re-l,

    '

    Smitted 6iating for SEC re-l,

    Can Proceed onl, after "TP and T,-e Test A--roval

  • 8/17/2019 Project Status_302 (Version 1)

    12/101

    Smitted 6iating for SEC re-l,

    8rd -art, "ns-ector A--red forTo6er5Condctor5P&

  • 8/17/2019 Project Status_302 (Version 1)

    13/101

    ?6@P6T60 I!N M6I06$ 'MP6NA @TD?S6

    *B382(Portion 1 & Portion 2)

    'NT06'T NB ##888812

    6 Documents Status

    IT%MS =endor Tec,e Tes

    'onductor  +idal Cales Smited!2.)4.1@$ Acce-ted Acce-ted

    P* LS cales Acce-ted Smited!).)4.1@$

    Insuators 7&> inslators Re-l, from ; a6aited Reected!2).)4.1

    Tower;S1N>PTL

     Acce-ted Smited!2.)4.1@$Tower;T61N >PTL

    Tower;T62N >PTL

    Tower;T63N >PTLTower;D% >PTL

    $ardware +ittings +osdorfer Smitted on !2).)4.1@$ Smited!).)4.1@$ Smited!21.)4.

    S,acer Dam,er  Dam- Acce-ted Smited!11.)4.1@$ Smited!11.)4.

    N+'Pr,smian

    oint !oC

    rounding >SA Acce-ted

    Final Acc-etance ased -onT,-e Test re-ort Acce-tance, PE de-.SEC

  • 8/17/2019 Project Status_302 (Version 1)

    14/101

    ?6@P6T60 I!N M6I06$ 'MP6NA @TD?S6

    *B382(Portion 1 & Portion 2)

    'NT06'T NB ##888812

    Document 6,,ro9a +ow '

  • 8/17/2019 Project Status_302 (Version 1)

    15/101

    !ase Design Submission

    Tower 

    Tec 6cce,

    Ste,51B

    !btain the Document from "!

     A: Acceptable - Approved and

    B: Acceptable as Noted- Requs

    C: Not Acceptable !Resubmit" -

    See Attached Sheet -#omme

    Each Revision the Step-1 Check lit should

  • 8/17/2019 Project Status_302 (Version 1)

    16/101

    Submit it to the Pre#uali$cation and Supp

    Checklist for Submission

    %Covering &etter and DS seal

    %*P report

    Ste,52B

    Reciving Reply from SEC for *P

    Submission Comments based on the follo

    Ste,53B

    All Documents Should get A status until t

    Along with that the Previous Comment Sh

    T>,e Test Pan Document Submission

    Ste,51B

    !btain the Document from "!

    Submit it to the Pre#uali$cation and Supp

    Checklist for Submission

    %Covering &etter and DS seal

    %ype est report +Should not b

    Ste,52B

    Reciving Reply from SEC for *P

    Submission Comments based on the follo

     A: Acceptable - Approved for th

    B: Acceptable as Noted- Requs

    C: Not Acceptable !Resubmit" -

    See Attached Sheet -#omme

    Each Revision the Step-1 Check lit should

    NoteB Eac( and ever, smission to PreHalification and S

    NoteB "f t(e T,-e test re-ort is more t(an Five ear -ast t(en

     A: Acceptable - Approved for th

  • 8/17/2019 Project Status_302 (Version 1)

    17/101

    Ste,53BAll Documents Should get A status until t

    Along with that the Previous Comment Sh

    S

  • 8/17/2019 Project Status_302 (Version 1)

    18/101

     Along 6it( t(at t(e Previos Comment S(eet al

  • 8/17/2019 Project Status_302 (Version 1)

    19/101

      Proect Cordinator 

    E#DD$

    get Signed from Proect +anager 

    %rs onl% from the Date material tested#

    ent 

    * certifcation ect!!#

    uments

    ing Status we have to proceed

    at the Submission will Continue with Revisions.

      et also should be attached and Actions taken shoulbe be men

    tance test)

    .O can be placed

    t for Some missing Documents and once it submited then it i

    hanged of Documents Required

    ts on the Documents to Rectif$.

    be followed and with the corrected and updated documents wi

  • 8/17/2019 Project Status_302 (Version 1)

    20/101

    rt Division Department of SEC

    Sign by Pro(ect )anger

    ing Status we have to proceed

    at the Submission will Continue with Revisions.

      et also should be attached and Actions taken shoulbe be men

    rt Division Department of SEC

    Sign by Pro(ect )anger

    more than ,ive -ear Report

    ing Status we have to proceed

    e %A& report submitted

    t for Some missing Documents and once it submited then it i

    hanged of Documents Required

    ts on the Documents to Rectif$.

    be followed and with the corrected and updated documents wi

    -ort De-artment of SEC normall, taes 8 6ees for re-l,.

    test s(old condcted ne6l, and smit

    e &$pe &est Submitted

  • 8/17/2019 Project Status_302 (Version 1)

    21/101

    at the Submission will Continue with Revisions.

      et also should be attached and Actions taken shoulbe be men

    tained as -er Diagram Control S(eet , SEC

      EC

      Seal , Proect +anager

    Dra6ings

      tats 6e (ave to -roceed

    Smission 6ill Contine 6it( Revisions.

    t for Some missing Documents and once it submited then it i

    hanged of Documents Required

    ts on the Documents to Rectif$.

    be followed and with the corrected and updated documents wi

    -ort De-artment of SEC normall, taes 8 6ees for re-l,.

    d Profile

      r Some missing Digram Number ,plant number,Size mentioned and onc

    ged of Documents Required 

      the Documents to Rectif%!

    llo6ed and 6it( t(e corrected and -dated docments 6ill e smitted

  • 8/17/2019 Project Status_302 (Version 1)

    22/101

      o s(old e attac(ed and Actions taen s(ole e mentioned in Com

  • 8/17/2019 Project Status_302 (Version 1)

    23/101

    ioned in Compliance Statement

    ll become A status.

      ll be submitted

  • 8/17/2019 Project Status_302 (Version 1)

    24/101

    ioned in Compliance Statement

    ll become A status.

      ll be submitted

  • 8/17/2019 Project Status_302 (Version 1)

    25/101

    ioned in Compliance Statement

    ll become A status.

      ll be submitted

      it submited then it ill become A status!

  • 8/17/2019 Project Status_302 (Version 1)

    26/101

    liance Statement

  • 8/17/2019 Project Status_302 (Version 1)

    27/101

  • 8/17/2019 Project Status_302 (Version 1)

    28/101

  • 8/17/2019 Project Status_302 (Version 1)

    29/101

  • 8/17/2019 Project Status_302 (Version 1)

    30/101

  • 8/17/2019 Project Status_302 (Version 1)

    31/101

  • 8/17/2019 Project Status_302 (Version 1)

    32/101

  • 8/17/2019 Project Status_302 (Version 1)

    33/101

  • 8/17/2019 Project Status_302 (Version 1)

    34/101

  • 8/17/2019 Project Status_302 (Version 1)

    35/101

  • 8/17/2019 Project Status_302 (Version 1)

    36/101

  • 8/17/2019 Project Status_302 (Version 1)

    37/101

  • 8/17/2019 Project Status_302 (Version 1)

    38/101

  • 8/17/2019 Project Status_302 (Version 1)

    39/101

    !ase Design Submissi

    'onductor 

    Tec

  • 8/17/2019 Project Status_302 (Version 1)

    40/101

    Checklist f

    Ste,52B

    Reciving R

    Submissio

    Ste,53B

    All Docum

    Along with

    T>,e Test Pan Docum

    Ste,51B

    !btain the

    Submit it t

    Checklist f

    Ste,52B

    Reciving R

    Submissio

    Each Revis

    NoteB Eac( and ever, s

    NoteB "f t(e T,-e test re

  • 8/17/2019 Project Status_302 (Version 1)

    41/101

    Ste,53BAll Docum

    Along with

    Sag and Tension 'ac

    Condctor!s(old smi

    Each Revis

    NoteB Eac( and ever, s

  • 8/17/2019 Project Status_302 (Version 1)

    42/101

    on

      bmission

    ec(nicial docment from +mai ; Proect Cordinator 

    mit and get a--roval from ! SEC*E#DD$r Tec(nical Docment Smission

    Pre-are Covering Letter # DTS and get Signed from Proect +anager &Data Schedule&$ompliace Statement 

    &'%pe 'est reports "report valid for ( %rs onl% from the Date material teste&)anufactures Responsibilit% Statement 

    &An% *ther +ualif%ing Documents"S* certifcation ect!!#

    &Drum diagram

      ply from SEC for echnical Documents

     Comments based on the following Status we have to proceed

    nts Should get A status until that the Submission will Continue

    that the Previous Comment Sheet also should be attached and

    n Submission (+6T5+actor> 6cce,tance test)

      Document from "!

      the Pre#uali$cation and Support Division Department of SEC

    : Acceptable - Approved and P.O can be placed

    : Acceptable as Noted- Requset for Some missing Documents a

    : Not Acceptable !Resubmit" -#hanged of Documents Required

    ee Attached Sheet -#omments on the Documents to Rectif$.

    ion the Step-1 Check lit should be followed and with the correct

  • 8/17/2019 Project Status_302 (Version 1)

    43/101

      r Submission

    %Covering &etter and DS seal ' Sign by Pro(ect )anger

    %*P report

      ply from SEC for *P

     Comments based on the following Status we have to proceed

    nts Should get A status until that the Submission will Continue

    that the Previous Comment Sheet also should be attached and

    nt Submission

      Document from "!

      the Pre#uali$cation and Support Division Department of SEC

      r Submission

    %Covering &etter and DS seal ' Sign by Pro(ect )anger

    %ype est report +Should not be more than ,ive -ear Report

    %Any Special est re#uired that also should be submitted

      ply from SEC for *P

     Comments based on the following Status we have to proceed

    : Acceptable - Approved for the %A& report submitted

    : Acceptable as Noted- Requset for Some missing Documents a

    : Not Acceptable !Resubmit" -#hanged of Documents Required

    ee Attached Sheet -#omments on the Documents to Rectif$.

    ion the Step-1 Check lit should be followed and with the correct

    mission to PreHalification and S--ort De-artment of SEC normall, ta

    ort is more t(an Five ear -ast t(en test s(old condcted ne6l, and s

    : Acceptable - Approved for the &$pe &est Submitted

  • 8/17/2019 Project Status_302 (Version 1)

    44/101

    nts Should get A status until that the Submission will Continue

    that the Previous Comment Sheet also should be attached and

    ation '

  • 8/17/2019 Project Status_302 (Version 1)

    45/101

    #

      ith Revisions.

    ctions taken shoulbe be mentioned in Compliance Statement

    nd once it submited then it ill become A status.

    d and updated documents will be submitted

  • 8/17/2019 Project Status_302 (Version 1)

    46/101

      ith Revisions.

    ctions taken shoulbe be mentioned in Compliance Statement

    nd once it submited then it ill become A status.

    d and updated documents will be submitted

      es 8 6ees for re-l,.

    mit

  • 8/17/2019 Project Status_302 (Version 1)

    47/101

      ith Revisions.

    ctions taken shoulbe be mentioned in Compliance Statement

    nd once it submited then it ill become A status.

    d and updated documents will be submitted

      es 8 6ees for re-l,.

  • 8/17/2019 Project Status_302 (Version 1)

    48/101

    !ase Design Submission

    P*

    Tec

  • 8/17/2019 Project Status_302 (Version 1)

    49/101

    J"TP re-ort

    Ste,52B

    Reciving Re-l, from SEC for "TPSmission Comments ased on t(

    Ste,53B

     All Docments S(old get A stats

     Along 6it( t(at t(e Previos Comme

    T>,e Test Pan Document Submission

    Ste,51B

    tain t(e Docment from ;Smit it to t(e PreHalification and

    C(eclist for Smission

    JCovering Letter and DT

    JT,-e Test re-ort !S(ol

    JAn, S-ecial Test reHir

    Ste,52B

    Reciving Re-l, from SEC for "TPSmission Comments ased on t(

     A: Acceptable - Approve

    B: Acceptable as Noted-

    C : Not Acceptable "Res

    See Attached Sheet -$

    Eac( Revision t(e Step-1 C(ec lit

    NoteB Eac( and ever, smission to PreHalifica

    NoteB "f t(e T,-e test re-ort is more t(an Five e

     A: Acceptable - Approve

    B: Acceptable as Noted-

    C : Not Acceptable "Res

    See Attached Sheet -$

  • 8/17/2019 Project Status_302 (Version 1)

    50/101

    Ste,53B

     All Docments S(old get A stats

     Along 6it( t(at t(e Previos Comme

    Sag and Tension 'acuation '

  • 8/17/2019 Project Status_302 (Version 1)

    51/101

    +mai ; Proect Cordinator 

      om ! SEC*E#DD$

      mission

    # DTS and get Signed from Proect +anager 

    t valid for ( %rs onl% from the Date material tested#bilit% Statement 

      cuments"S* certifcation ect!!#

    al Docments

    follo6ing Stats 6e (ave to -roceed

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    ctor> 6cce,tance test)

    --ort Division De-artment of SEC

    seal # Sign , Proect +anger 

     and P!* can be placed 

    Requset for Some missing Documents and once it submited then it ill bbmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

      (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

  • 8/17/2019 Project Status_302 (Version 1)

    52/101

    follo6ing Stats 6e (ave to -roceed

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    --ort Division De-artment of SEC

    seal # Sign , Proect +anger 

    not e more t(an Five ear Re-ort$

    d t(at also s(old e smitted

    follo6ing Stats 6e (ave to -roceed

     for the A' report submitted 

    Requset for Some missing Documents and once it submited then it ill b

    bmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

      (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

    tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.

    ar -ast t(en test s(old condcted ne6l, and smit

     for the '%pe 'est Submitted 

    Requset for Some missing Documents and once it submited then it ill b

    bmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

  • 8/17/2019 Project Status_302 (Version 1)

    53/101

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

    tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.

  • 8/17/2019 Project Status_302 (Version 1)

    54/101

     in Com-liance Statement

    come A status!

    mitted

  • 8/17/2019 Project Status_302 (Version 1)

    55/101

     in Com-liance Statement

    come A status!

    mitted

    come A status!

  • 8/17/2019 Project Status_302 (Version 1)

    56/101

     in Com-liance Statement

    mitted

  • 8/17/2019 Project Status_302 (Version 1)

    57/101

    !ase Design Submission

    Insuator 

    Tec

  • 8/17/2019 Project Status_302 (Version 1)

    58/101

    J"TP re-ort

    Ste,52B

    Reciving Re-l, from SEC for "TPSmission Comments ased on t(

    Ste,53B

     All Docments S(old get A stats

     Along 6it( t(at t(e Previos Comme

    T>,e Test Pan Document Submission

    Ste,51B

    tain t(e Docment from ;Smit it to t(e PreHalification and

    C(eclist for Smission

    JCovering Letter and DT

    JT,-e Test re-ort !S(ol

    JAn, S-ecial Test reHir

    Ste,52B

    Reciving Re-l, from SEC for "TPSmission Comments ased on t(

     A: Acceptable - Approve

    B: Acceptable as Noted-

    C : Not Acceptable "Res

    See Attached Sheet -$

    Eac( Revision t(e Step-1 C(ec lit

    NoteB Eac( and ever, smission to PreHalifica

    NoteB "f t(e T,-e test re-ort is more t(an Five e

     A: Acceptable - Approve

    B: Acceptable as Noted-

    C : Not Acceptable "Res

    See Attached Sheet -$

  • 8/17/2019 Project Status_302 (Version 1)

    59/101

    Ste,53B

     All Docments S(old get A stats

     Along 6it( t(at t(e Previos Comme

    Eac( Revision t(e Step-1 C(ec lit

    NoteB Eac( and ever, smission to PreHalifica

  • 8/17/2019 Project Status_302 (Version 1)

    60/101

    +mai ; Proect Cordinator 

      om ! SEC*E#DD$

      mission

    # DTS and get Signed from Proect +anager 

    t valid for ( %rs onl% from the Date material tested#bilit% Statement 

      cuments"S* certifcation ect!!#

    al Docments

    follo6ing Stats 6e (ave to -roceed

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    ctor> 6cce,tance test)

    --ort Division De-artment of SEC

    seal # Sign , Proect +anger 

     and P!* can be placed 

    Requset for Some missing Documents and once it submited then it ill bbmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

      (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

  • 8/17/2019 Project Status_302 (Version 1)

    61/101

    follo6ing Stats 6e (ave to -roceed

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    --ort Division De-artment of SEC

    seal # Sign , Proect +anger 

    not e more t(an Five ear Re-ort$

    d t(at also s(old e smitted

    follo6ing Stats 6e (ave to -roceed

     for the A' report submitted 

    Requset for Some missing Documents and once it submited then it ill b

    bmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

      (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

    tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.

    ar -ast t(en test s(old condcted ne6l, and smit

     for the '%pe 'est Submitted 

    Requset for Some missing Documents and once it submited then it ill b

    bmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

  • 8/17/2019 Project Status_302 (Version 1)

    62/101

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

    tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.

  • 8/17/2019 Project Status_302 (Version 1)

    63/101

     in Com-liance Statement

    come A status!

    mitted

  • 8/17/2019 Project Status_302 (Version 1)

    64/101

     in Com-liance Statement

    come A status!

    mitted

    come A status!

  • 8/17/2019 Project Status_302 (Version 1)

    65/101

     in Com-liance Statement

    mitted

  • 8/17/2019 Project Status_302 (Version 1)

    66/101

    !ase Design Submission

    S,acer Dam,er 

    Tec

  • 8/17/2019 Project Status_302 (Version 1)

    67/101

    J"TP re-ort

    Ste,52B

    Reciving Re-l, from SEC for "TPSmission Comments ased on t(

    Ste,53B

     All Docments S(old get A stats

     Along 6it( t(at t(e Previos Comme

    T>,e Test Pan Document Submission

    Ste,51B

    tain t(e Docment from ;Smit it to t(e PreHalification and

    C(eclist for Smission

    JCovering Letter and DT

    JT,-e Test re-ort !S(ol

    JAn, S-ecial Test reHir

    Ste,52B

    Reciving Re-l, from SEC for "TPSmission Comments ased on t(

     A: Acceptable - Approve

    B: Acceptable as Noted-

    C : Not Acceptable "Res

    See Attached Sheet -$

    Eac( Revision t(e Step-1 C(ec lit

    NoteB Eac( and ever, smission to PreHalifica

    NoteB "f t(e T,-e test re-ort is more t(an Five e

     A: Acceptable - Approve

    B: Acceptable as Noted-

    C : Not Acceptable "Res

    See Attached Sheet -$

  • 8/17/2019 Project Status_302 (Version 1)

    68/101

    Ste,53B

     All Docments S(old get A stats

     Along 6it( t(at t(e Previos Comme

    Eac( Revision t(e Step-1 C(ec lit

    NoteB Eac( and ever, smission to PreHalifica

  • 8/17/2019 Project Status_302 (Version 1)

    69/101

    +mai ; Proect Cordinator 

      om ! SEC*E#DD$

      mission

    # DTS and get Signed from Proect +anager 

    t valid for ( %rs onl% from the Date material tested#bilit% Statement 

      cuments"S* certifcation ect!!#

    al Docments

    follo6ing Stats 6e (ave to -roceed

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    ctor> 6cce,tance test)

    --ort Division De-artment of SEC

    seal # Sign , Proect +anger 

     and P!* can be placed 

    Requset for Some missing Documents and once it submited then it ill bbmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

      (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

  • 8/17/2019 Project Status_302 (Version 1)

    70/101

    follo6ing Stats 6e (ave to -roceed

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    --ort Division De-artment of SEC

    seal # Sign , Proect +anger 

    not e more t(an Five ear Re-ort$

    d t(at also s(old e smitted

    follo6ing Stats 6e (ave to -roceed

     for the A' report submitted 

    Requset for Some missing Documents and once it submited then it ill b

    bmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

      (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

    tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.

    ar -ast t(en test s(old condcted ne6l, and smit

     for the '%pe 'est Submitted 

    Requset for Some missing Documents and once it submited then it ill b

    bmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

  • 8/17/2019 Project Status_302 (Version 1)

    71/101

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

    tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.

  • 8/17/2019 Project Status_302 (Version 1)

    72/101

     in Com-liance Statement

    come A status!

    mitted

  • 8/17/2019 Project Status_302 (Version 1)

    73/101

     in Com-liance Statement

    come A status!

    mitted

    come A status!

  • 8/17/2019 Project Status_302 (Version 1)

    74/101

     in Com-liance Statement

    mitted

  • 8/17/2019 Project Status_302 (Version 1)

    75/101

    !ase Design Submission

    $ardware +ittings

    Tec

  • 8/17/2019 Project Status_302 (Version 1)

    76/101

    %Covering &etter and

    %*P report

    Ste,52BReciving Reply from SEC for *P

    Submission Comments based o

    Ste,53B

    All Documents Should get A st

    Along with that the Previous Co

    T>,e Test Pan Document Submission

    Ste,51B

    !btain the Document from "!

    Submit it to the Pre#uali$cation

    Checklist for Submission

    %Covering &etter and

    %ype est report +Sh

    %Any Special est re#

    Ste,52B

    Reciving Reply from SEC for *P

    Submission Comments based o

     A: Acceptable - Appr

    B: Acceptable as Not

    C: Not Acceptable !R

    See Attached Shee

    Each Revision the Step-1 Chec

    NoteB Eac( and ever, smission to PreHalific

    NoteB "f t(e T,-e test re-ort is more t(an Five

     A: Acceptable - Appr

    B: Acceptable as Not

  • 8/17/2019 Project Status_302 (Version 1)

    77/101

    Ste,53B

    All Documents Should get A st

    Along with that the Previous Co

    C: Not Acceptable !R

    See Attached Shee

    Each Revision the Step-1 Chec

    NoteB Eac( and ever, smission to PreHalific

  • 8/17/2019 Project Status_302 (Version 1)

    78/101

      +mai ; Proect Cordinator 

      rom ! SEC*E#DD$

      mission

    r # DTS and get Signed from Proect +anager 

    rt valid for ( %rs onl% from the Date material tested#ibilit% Statement 

      ocuments"S* certifcation ect!!#

    hnical Documents

      n the following Status we have to proceed

    tus until that the Submission will Continue with Revisions.

      mment Sheet also should be attached and Actions taken shoul

    ctor> 6cce,tance test)

     and Support Division Department of SEC

    ved and P.O can be placed

    ed- Requset for Some missing Documents and once it submitesubmit" -#hanged of Documents Required

    t -#omments on the Documents to Rectif$.

    k lit should be followed and with the corrected and updated do

  • 8/17/2019 Project Status_302 (Version 1)

    79/101

    DS seal ' Sign by Pro(ect )anger

    n the following Status we have to proceed

    tus until that the Submission will Continue with Revisions.

      mment Sheet also should be attached and Actions taken shoul

    and Support Division Department of SEC

    DS seal ' Sign by Pro(ect )anger

      uld not be more than ,ive -ear Report

      uired that also should be submitted

    n the following Status we have to proceed

    ved for the %A& report submitted

    ed- Requset for Some missing Documents and once it submite

    submit" -#hanged of Documents Required

    t -#omments on the Documents to Rectif$.

    k lit should be followed and with the corrected and updated do

    ation and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.

    ear -ast t(en test s(old condcted ne6l, and smit

    ved for the &$pe &est Submitted

    ed- Requset for Some missing Documents and once it submite

  • 8/17/2019 Project Status_302 (Version 1)

    80/101

    tus until that the Submission will Continue with Revisions.

      mment Sheet also should be attached and Actions taken shoul

    submit" -#hanged of Documents Required

    t -#omments on the Documents to Rectif$.

    k lit should be followed and with the corrected and updated do

    ation and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.

  • 8/17/2019 Project Status_302 (Version 1)

    81/101

    e be mentioned in Compliance Statement

    then it ill become A status.

      uments will be submitted

  • 8/17/2019 Project Status_302 (Version 1)

    82/101

    e be mentioned in Compliance Statement

    then it ill become A status.

      uments will be submitted

     then it ill become A status.

  • 8/17/2019 Project Status_302 (Version 1)

    83/101

  • 8/17/2019 Project Status_302 (Version 1)

    84/101

    !ase Design Submission

    N+'!

    Tec

  • 8/17/2019 Project Status_302 (Version 1)

    85/101

    J"TP re-ort

    Ste,52B

    Reciving Re-l, from SEC for "TPSmission Comments ased on t(

    Ste,53B

     All Docments S(old get A stats

     Along 6it( t(at t(e Previos Comme

    T>,e Test Pan Document Submission

    Ste,51B

    tain t(e Docment from ;Smit it to t(e PreHalification and

    C(eclist for Smission

    JCovering Letter and DT

    JT,-e Test re-ort !S(ol

    JAn, S-ecial Test reHir

    Ste,52B

    Reciving Re-l, from SEC for "TPSmission Comments ased on t(

     A: Acceptable - Approve

    B: Acceptable as Noted-

    C : Not Acceptable "Res

    See Attached Sheet -$

    Eac( Revision t(e Step-1 C(ec lit

    NoteB Eac( and ever, smission to PreHalifica

    NoteB "f t(e T,-e test re-ort is more t(an Five e

     A: Acceptable - Approve

    B: Acceptable as Noted-

    C : Not Acceptable "Res

    See Attached Sheet -$

  • 8/17/2019 Project Status_302 (Version 1)

    86/101

    Ste,53B

     All Docments S(old get A stats

     Along 6it( t(at t(e Previos Comme

    Eac( Revision t(e Step-1 C(ec lit

    NoteB Eac( and ever, smission to PreHalifica

  • 8/17/2019 Project Status_302 (Version 1)

    87/101

    +mai ; Proect Cordinator 

      om ! SEC*E#DD$

      mission

    # DTS and get Signed from Proect +anager 

    t valid for ( %rs onl% from the Date material tested#bilit% Statement 

      cuments"S* certifcation ect!!#

    al Docments

    follo6ing Stats 6e (ave to -roceed

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    ctor> 6cce,tance test)

    --ort Division De-artment of SEC

    seal # Sign , Proect +anger 

     and P!* can be placed 

    Requset for Some missing Documents and once it submited then it ill bbmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

      (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

  • 8/17/2019 Project Status_302 (Version 1)

    88/101

    follo6ing Stats 6e (ave to -roceed

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    --ort Division De-artment of SEC

    seal # Sign , Proect +anger 

    not e more t(an Five ear Re-ort$

    d t(at also s(old e smitted

    follo6ing Stats 6e (ave to -roceed

     for the A' report submitted 

    Requset for Some missing Documents and once it submited then it ill b

    bmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

      (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

    tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.

    ar -ast t(en test s(old condcted ne6l, and smit

     for the '%pe 'est Submitted 

    Requset for Some missing Documents and once it submited then it ill b

    bmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

  • 8/17/2019 Project Status_302 (Version 1)

    89/101

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

    tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.

  • 8/17/2019 Project Status_302 (Version 1)

    90/101

     in Com-liance Statement

    come A status!

    mitted

  • 8/17/2019 Project Status_302 (Version 1)

    91/101

     in Com-liance Statement

    come A status!

    mitted

    come A status!

  • 8/17/2019 Project Status_302 (Version 1)

    92/101

     in Com-liance Statement

    mitted

  • 8/17/2019 Project Status_302 (Version 1)

    93/101

    !ase Design Submission

    rounding

    Tec

  • 8/17/2019 Project Status_302 (Version 1)

    94/101

    J"TP re-ort

    Ste,52B

    Reciving Re-l, from SEC for "TPSmission Comments ased on t(

    Ste,53B

     All Docments S(old get A stats

     Along 6it( t(at t(e Previos Comme

    T>,e Test Pan Document Submission

    Ste,51B

    tain t(e Docment from ;Smit it to t(e PreHalification and

    C(eclist for Smission

    JCovering Letter and DT

    JT,-e Test re-ort !S(ol

    JAn, S-ecial Test reHir

    Ste,52B

    Reciving Re-l, from SEC for "TPSmission Comments ased on t(

     A: Acceptable - Approve

    B: Acceptable as Noted-

    C : Not Acceptable "Res

    See Attached Sheet -$

    Eac( Revision t(e Step-1 C(ec lit

    NoteB Eac( and ever, smission to PreHalifica

    NoteB "f t(e T,-e test re-ort is more t(an Five e

     A: Acceptable - Approve

    B: Acceptable as Noted-

    C : Not Acceptable "Res

    See Attached Sheet -$

  • 8/17/2019 Project Status_302 (Version 1)

    95/101

    Ste,53B

     All Docments S(old get A stats

     Along 6it( t(at t(e Previos Comme

    Eac( Revision t(e Step-1 C(ec lit

    NoteB Eac( and ever, smission to PreHalifica

  • 8/17/2019 Project Status_302 (Version 1)

    96/101

    +mai ; Proect Cordinator 

      om ! SEC*E#DD$

      mission

    # DTS and get Signed from Proect +anager 

    t valid for ( %rs onl% from the Date material tested#bilit% Statement 

      cuments"S* certifcation ect!!#

    al Docments

    follo6ing Stats 6e (ave to -roceed

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    ctor> 6cce,tance test)

    --ort Division De-artment of SEC

    seal # Sign , Proect +anger 

     and P!* can be placed 

    Requset for Some missing Documents and once it submited then it ill bbmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

      (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

  • 8/17/2019 Project Status_302 (Version 1)

    97/101

    follo6ing Stats 6e (ave to -roceed

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    --ort Division De-artment of SEC

    seal # Sign , Proect +anger 

    not e more t(an Five ear Re-ort$

    d t(at also s(old e smitted

    follo6ing Stats 6e (ave to -roceed

     for the A' report submitted 

    Requset for Some missing Documents and once it submited then it ill b

    bmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

      (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

    tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.

    ar -ast t(en test s(old condcted ne6l, and smit

     for the '%pe 'est Submitted 

    Requset for Some missing Documents and once it submited then it ill b

    bmit# -$hanged of Documents Required 

    mments on the Documents to Rectif%!

  • 8/17/2019 Project Status_302 (Version 1)

    98/101

    ntil t(at t(e Smission 6ill Contine 6it( Revisions.

    nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione

    (old e follo6ed and 6it( t(e corrected and -dated docments 6ill e

    tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.

  • 8/17/2019 Project Status_302 (Version 1)

    99/101

     in Com-liance Statement

    come A status!

    mitted

  • 8/17/2019 Project Status_302 (Version 1)

    100/101

     in Com-liance Statement

    come A status!

    mitted

    come A status!

  • 8/17/2019 Project Status_302 (Version 1)

    101/101

     in Com-liance Statement

    mitted