8/17/2019 Project Status_302 (Version 1)
1/101
1 & Portion2)
S.No Documents
1 Post Tender Meeting
1.1 Finalisation of Vendors
1.2 Engineering and Design Serivces
2 Drawing Numbers for (I&II)
3 Tite !oc" Numbers for (I&II)
# $S% Document
4.1 Loss and Prevention Program
!ase Design Submission
.1 'onductor
A TD for ACSR condctors!"#""$ %&TP'
a.Data Sc(edle !1)*T+SS*)1 %rev.)1'$
c.T,-e Test Re-ort
d.+anfactres res-onsiilit, Statement
e.An, ot(er /alif,ing Docments !Certification$
0"TP of Condctor
.2 P*
A TD of P&*" %&TP'
Data Sc(edle for P& 3 4 Cores.
Com-liance Statement ! )1*T+SS*)15 1)*T+SS*)4 Rev.)1 $
T,-e test re-ort.+anfactres res-onsiilit, Statement
.Com-liance Statement !)1*T+SS*)1%rev.)2'51)*T+SS*)1%rev.)1'$
8/17/2019 Project Status_302 (Version 1)
2/101
An, ot(er /alif,ing docments.
Drm dra6ing.
0 TD of P&*"" %&TP'
Data Sc(edle for P& 3 4 Cores.
Com-liance Statement ! )1*T+SS*)15 1)*T+SS*)4 Rev.)1 $
T,-e test re-ort.
+anfactres res-onsiilit, Statement
An, ot(er /alif,ing docments.Drm dra6ing.
"TP of P&
.3 Towers
A TD of To6er * "
Data Sc(edle for S175 TA175 TA275 TA87 # DE to6ers.
T,-e test re-ort.
+anfactres res-onsiilit, Statement. An, ot(er /alif,ing docments
0 TD of To6er * ""
Data Sc(edle for S175 TA175 TA275 TA87 # DE to6ers.
T,-e test re-ort.
+anfactres res-onsiilit, Statement.
An, ot(er /alif,ing docments
C S(o- # Erection Dra6ings of S17 !)*29 $to6er *"
D S(o- # Erection Dra6ings of S17 !)*29$ to6er *""
E S(o- # Erection Dra6ings of TA17 !29*1)9$ to6er *"
F S(o- # Erection Dra6ings of TA17 !29*1)9$ to6er *""
& S(o- # Erection Dra6ings of TA27 !1)9*8:9$ to6er *"
; S(o- # Erection Dra6ings of TA27 !1)9*8:9$ to6er *""
" S(o- # Erection Dra6ings of TA87 !8:9*
8/17/2019 Project Status_302 (Version 1)
3/101
T,-e test re-ort.
+anfactres res-onsiilit, Statement
An, ot(er /alif,ing docments
C Strctre "dentification # 6arnings*"
Strctre "dentification # 6arnings*""
D ACD5S05Anti T(eft olts5Plant*"
ACD5S05Anti T(eft olts5Plant*""
E "TP of "nsl.;ard6are # Condctor Fittings
. S,acer Dam,er
A TD of S-acer Dam-er*"
0 TD of S-acer Dam-er*""
C T,-e Test -lan for S-acer Dam-er
D "TP of S-acer Dam-er
.- Insuator
ATD for "nslators!" #""$
T,-e test re-ort
+anfactres res-onsiilit, Statement
An, ot(er /alif,ing docments.
0 "TP of "nslator
.
Data Sc(edle for F+R5 FC5 =oint o? .
T,-e test re-ort.
+anfactres res-onsiilit, Statement
An, ot(er /alif,ing docments./ rounding
Data Sc(edle for line (ard6are.
Com-liance Statement ! 12*T+SS*)1 Rev.)25 )1*T+SS*)1Rev.)25 12*T+SS*)2 Rev.)1$
Data Sc(edle for "nslator.!1@) 7 # 88)7 Porcelain Long
Rod "nslators$
Com-liance Statement ! 1:*T+SS*)4 Rev.)15 )1*T+SS*)1Rev.)1$
+M0 NM+' INT !4 (P*5P*P*5+')
Com-liance Statement ! 4*T+SS*)2 Rev.)25 )1*T+SS*)1Rev.)2$
8/17/2019 Project Status_302 (Version 1)
4/101
A TD for &ronding*"# ""
- 0oute 6ignment Drawing
Sag and Tension 'acuation
Condctor P&
/ Mid Sa,n 'acuation
7 Pan and Profie( Portion5I)
Rote ma- 6it( s-otted strctre
Strctre List
Profile
Sag Tem-late Crve in trans-arent S(eet
18 Pan and Profie( Portion5II)
Rote ma- 6it( s-otted strctreStrctre List
Profile
Sag Tem-late Crve in trans-arent S(eet
11 Soi In9estigation
0oring at site
Re-ort Smission
12 6ccess road & Structure
13 +oundation Design
Design CalclationFondation Dra6ings
1# :6;:' Doc.for (I&II)
A T(ird Part, "ns-ector*To6er !S&S$
0 T(ird Part, "ns-ector* "nslator
C T(ird Part, "ns-ector* P&
1 Purc
8/17/2019 Project Status_302 (Version 1)
5/101
urce of Document
65acce,ted
6
DAR E7&&
1B2@B2)1@ 6
1B2@B2)1@ 6
Coordination *;SE +mai. 4B1B2)1@
Coordination *;SE +mai.
+"DAL Cales 2B2B2)1@
.Coordinator*+mai
.Coordinator*+mai 4BB2)1@
LS Cales
.Coordinator*+mai
6,,ro9ed=endor;contractor
;'om,an>
S!MISSIN to cientwit< Date
8/17/2019 Project Status_302 (Version 1)
6/101
.Coordinator*+mai
4BB2)1@
?PT@
ign.De-t +mai 8B14B2)1@
ign.De-t +mai 8B14B2)1@
ign.De-t +mai 8B
8/17/2019 Project Status_302 (Version 1)
7/101
R E7&& 4B18B2)1@
R E7&& 4B1B2)1@
.Coordinator*+mai 4B18B2)1@
.Coordinator*+mai 4B18B2)1@
.Coordinator*+mai 4BB2)1@
D6MP5IT6@A
.Coordinator*+mai
.Coordinator*+mai
.Coordinator*+mai
.Coordinator*+mai
N?5Insuators
.Coordinator*+mai8B2B2)1@
.Coordinator*+mai 4B:B2)1@
.Coordinator*+mai
AL ;AR"T;*>SA
8/17/2019 Project Status_302 (Version 1)
8/101
6
6
6
6
6
6
8/17/2019 Project Status_302 (Version 1)
9/101
6,,ro9a of 'ient0emar"s
'50esubmit
7ot smitted nder (old
! Can Proceed onl, after "TP A--roval
Smitted 6iating for SEC re-l,
Smitted 6iating for SEC re-l,
!5acce,ted as wit<note
8/17/2019 Project Status_302 (Version 1)
10/101
Smitted 6iating for SEC re-l,
Smitted 6iating for SEC re-l,
! Rev.)1 nder Pre-aration of ;
! Rev.)1 nder Pre-aration of ;
! Smitted 6iating for SEC re-l,
!Smitted 6iating for SEC re-l,
! Smitted 6iating for SEC re-l,
! Smitted 6iating for SEC re-l,
! Smitted 6iating for SEC re-l,
! Smitted 6iating for SEC re-l,
Smitted 6iating for SEC re-l,
Smitted 6iating for SEC re-l,
Smitted 6iating for SEC re-l,
Smitted 6iating for SEC re-l,
!Smitted 6iating for SEC re-l,
!Smitted 6iating for SEC re-l,
8/17/2019 Project Status_302 (Version 1)
11/101
Smitted 6iating for SEC re-l,
Smitted 6iating for SEC re-l,
Smitted 6iating for SEC re-l,
Smitted 6iating for SEC re-l,
Smitted 6iating for SEC re-l,
'Smitted 6iating for SEC re-l,
'
Smitted 6iating for SEC re-l,
Smitted 6iating for SEC re-l,
Smitted 6iating for SEC re-l,
'
Smitted 6iating for SEC re-l,
Can Proceed onl, after "TP and T,-e Test A--roval
8/17/2019 Project Status_302 (Version 1)
12/101
Smitted 6iating for SEC re-l,
8rd -art, "ns-ector A--red forTo6er5Condctor5P&
8/17/2019 Project Status_302 (Version 1)
13/101
?6@P6T60 I!N M6I06$ 'MP6NA @TD?S6
*B382(Portion 1 & Portion 2)
'NT06'T NB ##888812
6 Documents Status
IT%MS =endor Tec,e Tes
'onductor +idal Cales Smited!2.)4.1@$ Acce-ted Acce-ted
P* LS cales Acce-ted Smited!).)4.1@$
Insuators 7&> inslators Re-l, from ; a6aited Reected!2).)4.1
Tower;S1N>PTL
Acce-ted Smited!2.)4.1@$Tower;T61N >PTL
Tower;T62N >PTL
Tower;T63N >PTLTower;D% >PTL
$ardware +ittings +osdorfer Smitted on !2).)4.1@$ Smited!).)4.1@$ Smited!21.)4.
S,acer Dam,er Dam- Acce-ted Smited!11.)4.1@$ Smited!11.)4.
N+'Pr,smian
oint !oC
rounding >SA Acce-ted
Final Acc-etance ased -onT,-e Test re-ort Acce-tance, PE de-.SEC
8/17/2019 Project Status_302 (Version 1)
14/101
?6@P6T60 I!N M6I06$ 'MP6NA @TD?S6
*B382(Portion 1 & Portion 2)
'NT06'T NB ##888812
Document 6,,ro9a +ow '
8/17/2019 Project Status_302 (Version 1)
15/101
!ase Design Submission
Tower
Tec 6cce,
Ste,51B
!btain the Document from "!
A: Acceptable - Approved and
B: Acceptable as Noted- Requs
C: Not Acceptable !Resubmit" -
See Attached Sheet -#omme
Each Revision the Step-1 Check lit should
8/17/2019 Project Status_302 (Version 1)
16/101
Submit it to the Pre#uali$cation and Supp
Checklist for Submission
%Covering &etter and DS seal
%*P report
Ste,52B
Reciving Reply from SEC for *P
Submission Comments based on the follo
Ste,53B
All Documents Should get A status until t
Along with that the Previous Comment Sh
T>,e Test Pan Document Submission
Ste,51B
!btain the Document from "!
Submit it to the Pre#uali$cation and Supp
Checklist for Submission
%Covering &etter and DS seal
%ype est report +Should not b
Ste,52B
Reciving Reply from SEC for *P
Submission Comments based on the follo
A: Acceptable - Approved for th
B: Acceptable as Noted- Requs
C: Not Acceptable !Resubmit" -
See Attached Sheet -#omme
Each Revision the Step-1 Check lit should
NoteB Eac( and ever, smission to PreHalification and S
NoteB "f t(e T,-e test re-ort is more t(an Five ear -ast t(en
A: Acceptable - Approved for th
8/17/2019 Project Status_302 (Version 1)
17/101
Ste,53BAll Documents Should get A status until t
Along with that the Previous Comment Sh
S
8/17/2019 Project Status_302 (Version 1)
18/101
Along 6it( t(at t(e Previos Comment S(eet al
8/17/2019 Project Status_302 (Version 1)
19/101
Proect Cordinator
E#DD$
get Signed from Proect +anager
%rs onl% from the Date material tested#
ent
* certifcation ect!!#
uments
ing Status we have to proceed
at the Submission will Continue with Revisions.
et also should be attached and Actions taken shoulbe be men
tance test)
.O can be placed
t for Some missing Documents and once it submited then it i
hanged of Documents Required
ts on the Documents to Rectif$.
be followed and with the corrected and updated documents wi
8/17/2019 Project Status_302 (Version 1)
20/101
rt Division Department of SEC
Sign by Pro(ect )anger
ing Status we have to proceed
at the Submission will Continue with Revisions.
et also should be attached and Actions taken shoulbe be men
rt Division Department of SEC
Sign by Pro(ect )anger
more than ,ive -ear Report
ing Status we have to proceed
e %A& report submitted
t for Some missing Documents and once it submited then it i
hanged of Documents Required
ts on the Documents to Rectif$.
be followed and with the corrected and updated documents wi
-ort De-artment of SEC normall, taes 8 6ees for re-l,.
test s(old condcted ne6l, and smit
e &$pe &est Submitted
8/17/2019 Project Status_302 (Version 1)
21/101
at the Submission will Continue with Revisions.
et also should be attached and Actions taken shoulbe be men
tained as -er Diagram Control S(eet , SEC
EC
Seal , Proect +anager
Dra6ings
tats 6e (ave to -roceed
Smission 6ill Contine 6it( Revisions.
t for Some missing Documents and once it submited then it i
hanged of Documents Required
ts on the Documents to Rectif$.
be followed and with the corrected and updated documents wi
-ort De-artment of SEC normall, taes 8 6ees for re-l,.
d Profile
r Some missing Digram Number ,plant number,Size mentioned and onc
ged of Documents Required
the Documents to Rectif%!
llo6ed and 6it( t(e corrected and -dated docments 6ill e smitted
8/17/2019 Project Status_302 (Version 1)
22/101
o s(old e attac(ed and Actions taen s(ole e mentioned in Com
8/17/2019 Project Status_302 (Version 1)
23/101
ioned in Compliance Statement
ll become A status.
ll be submitted
8/17/2019 Project Status_302 (Version 1)
24/101
ioned in Compliance Statement
ll become A status.
ll be submitted
8/17/2019 Project Status_302 (Version 1)
25/101
ioned in Compliance Statement
ll become A status.
ll be submitted
it submited then it ill become A status!
8/17/2019 Project Status_302 (Version 1)
26/101
liance Statement
8/17/2019 Project Status_302 (Version 1)
27/101
8/17/2019 Project Status_302 (Version 1)
28/101
8/17/2019 Project Status_302 (Version 1)
29/101
8/17/2019 Project Status_302 (Version 1)
30/101
8/17/2019 Project Status_302 (Version 1)
31/101
8/17/2019 Project Status_302 (Version 1)
32/101
8/17/2019 Project Status_302 (Version 1)
33/101
8/17/2019 Project Status_302 (Version 1)
34/101
8/17/2019 Project Status_302 (Version 1)
35/101
8/17/2019 Project Status_302 (Version 1)
36/101
8/17/2019 Project Status_302 (Version 1)
37/101
8/17/2019 Project Status_302 (Version 1)
38/101
8/17/2019 Project Status_302 (Version 1)
39/101
!ase Design Submissi
'onductor
Tec
8/17/2019 Project Status_302 (Version 1)
40/101
Checklist f
Ste,52B
Reciving R
Submissio
Ste,53B
All Docum
Along with
T>,e Test Pan Docum
Ste,51B
!btain the
Submit it t
Checklist f
Ste,52B
Reciving R
Submissio
Each Revis
NoteB Eac( and ever, s
NoteB "f t(e T,-e test re
8/17/2019 Project Status_302 (Version 1)
41/101
Ste,53BAll Docum
Along with
Sag and Tension 'ac
Condctor!s(old smi
Each Revis
NoteB Eac( and ever, s
8/17/2019 Project Status_302 (Version 1)
42/101
on
bmission
ec(nicial docment from +mai ; Proect Cordinator
mit and get a--roval from ! SEC*E#DD$r Tec(nical Docment Smission
Pre-are Covering Letter # DTS and get Signed from Proect +anager &Data Schedule&$ompliace Statement
&'%pe 'est reports "report valid for ( %rs onl% from the Date material teste&)anufactures Responsibilit% Statement
&An% *ther +ualif%ing Documents"S* certifcation ect!!#
&Drum diagram
ply from SEC for echnical Documents
Comments based on the following Status we have to proceed
nts Should get A status until that the Submission will Continue
that the Previous Comment Sheet also should be attached and
n Submission (+6T5+actor> 6cce,tance test)
Document from "!
the Pre#uali$cation and Support Division Department of SEC
: Acceptable - Approved and P.O can be placed
: Acceptable as Noted- Requset for Some missing Documents a
: Not Acceptable !Resubmit" -#hanged of Documents Required
ee Attached Sheet -#omments on the Documents to Rectif$.
ion the Step-1 Check lit should be followed and with the correct
8/17/2019 Project Status_302 (Version 1)
43/101
r Submission
%Covering &etter and DS seal ' Sign by Pro(ect )anger
%*P report
ply from SEC for *P
Comments based on the following Status we have to proceed
nts Should get A status until that the Submission will Continue
that the Previous Comment Sheet also should be attached and
nt Submission
Document from "!
the Pre#uali$cation and Support Division Department of SEC
r Submission
%Covering &etter and DS seal ' Sign by Pro(ect )anger
%ype est report +Should not be more than ,ive -ear Report
%Any Special est re#uired that also should be submitted
ply from SEC for *P
Comments based on the following Status we have to proceed
: Acceptable - Approved for the %A& report submitted
: Acceptable as Noted- Requset for Some missing Documents a
: Not Acceptable !Resubmit" -#hanged of Documents Required
ee Attached Sheet -#omments on the Documents to Rectif$.
ion the Step-1 Check lit should be followed and with the correct
mission to PreHalification and S--ort De-artment of SEC normall, ta
ort is more t(an Five ear -ast t(en test s(old condcted ne6l, and s
: Acceptable - Approved for the &$pe &est Submitted
8/17/2019 Project Status_302 (Version 1)
44/101
nts Should get A status until that the Submission will Continue
that the Previous Comment Sheet also should be attached and
ation '
8/17/2019 Project Status_302 (Version 1)
45/101
#
ith Revisions.
ctions taken shoulbe be mentioned in Compliance Statement
nd once it submited then it ill become A status.
d and updated documents will be submitted
8/17/2019 Project Status_302 (Version 1)
46/101
ith Revisions.
ctions taken shoulbe be mentioned in Compliance Statement
nd once it submited then it ill become A status.
d and updated documents will be submitted
es 8 6ees for re-l,.
mit
8/17/2019 Project Status_302 (Version 1)
47/101
ith Revisions.
ctions taken shoulbe be mentioned in Compliance Statement
nd once it submited then it ill become A status.
d and updated documents will be submitted
es 8 6ees for re-l,.
8/17/2019 Project Status_302 (Version 1)
48/101
!ase Design Submission
P*
Tec
8/17/2019 Project Status_302 (Version 1)
49/101
J"TP re-ort
Ste,52B
Reciving Re-l, from SEC for "TPSmission Comments ased on t(
Ste,53B
All Docments S(old get A stats
Along 6it( t(at t(e Previos Comme
T>,e Test Pan Document Submission
Ste,51B
tain t(e Docment from ;Smit it to t(e PreHalification and
C(eclist for Smission
JCovering Letter and DT
JT,-e Test re-ort !S(ol
JAn, S-ecial Test reHir
Ste,52B
Reciving Re-l, from SEC for "TPSmission Comments ased on t(
A: Acceptable - Approve
B: Acceptable as Noted-
C : Not Acceptable "Res
See Attached Sheet -$
Eac( Revision t(e Step-1 C(ec lit
NoteB Eac( and ever, smission to PreHalifica
NoteB "f t(e T,-e test re-ort is more t(an Five e
A: Acceptable - Approve
B: Acceptable as Noted-
C : Not Acceptable "Res
See Attached Sheet -$
8/17/2019 Project Status_302 (Version 1)
50/101
Ste,53B
All Docments S(old get A stats
Along 6it( t(at t(e Previos Comme
Sag and Tension 'acuation '
8/17/2019 Project Status_302 (Version 1)
51/101
+mai ; Proect Cordinator
om ! SEC*E#DD$
mission
# DTS and get Signed from Proect +anager
t valid for ( %rs onl% from the Date material tested#bilit% Statement
cuments"S* certifcation ect!!#
al Docments
follo6ing Stats 6e (ave to -roceed
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
ctor> 6cce,tance test)
--ort Division De-artment of SEC
seal # Sign , Proect +anger
and P!* can be placed
Requset for Some missing Documents and once it submited then it ill bbmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
8/17/2019 Project Status_302 (Version 1)
52/101
follo6ing Stats 6e (ave to -roceed
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
--ort Division De-artment of SEC
seal # Sign , Proect +anger
not e more t(an Five ear Re-ort$
d t(at also s(old e smitted
follo6ing Stats 6e (ave to -roceed
for the A' report submitted
Requset for Some missing Documents and once it submited then it ill b
bmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.
ar -ast t(en test s(old condcted ne6l, and smit
for the '%pe 'est Submitted
Requset for Some missing Documents and once it submited then it ill b
bmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
8/17/2019 Project Status_302 (Version 1)
53/101
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.
8/17/2019 Project Status_302 (Version 1)
54/101
in Com-liance Statement
come A status!
mitted
8/17/2019 Project Status_302 (Version 1)
55/101
in Com-liance Statement
come A status!
mitted
come A status!
8/17/2019 Project Status_302 (Version 1)
56/101
in Com-liance Statement
mitted
8/17/2019 Project Status_302 (Version 1)
57/101
!ase Design Submission
Insuator
Tec
8/17/2019 Project Status_302 (Version 1)
58/101
J"TP re-ort
Ste,52B
Reciving Re-l, from SEC for "TPSmission Comments ased on t(
Ste,53B
All Docments S(old get A stats
Along 6it( t(at t(e Previos Comme
T>,e Test Pan Document Submission
Ste,51B
tain t(e Docment from ;Smit it to t(e PreHalification and
C(eclist for Smission
JCovering Letter and DT
JT,-e Test re-ort !S(ol
JAn, S-ecial Test reHir
Ste,52B
Reciving Re-l, from SEC for "TPSmission Comments ased on t(
A: Acceptable - Approve
B: Acceptable as Noted-
C : Not Acceptable "Res
See Attached Sheet -$
Eac( Revision t(e Step-1 C(ec lit
NoteB Eac( and ever, smission to PreHalifica
NoteB "f t(e T,-e test re-ort is more t(an Five e
A: Acceptable - Approve
B: Acceptable as Noted-
C : Not Acceptable "Res
See Attached Sheet -$
8/17/2019 Project Status_302 (Version 1)
59/101
Ste,53B
All Docments S(old get A stats
Along 6it( t(at t(e Previos Comme
Eac( Revision t(e Step-1 C(ec lit
NoteB Eac( and ever, smission to PreHalifica
8/17/2019 Project Status_302 (Version 1)
60/101
+mai ; Proect Cordinator
om ! SEC*E#DD$
mission
# DTS and get Signed from Proect +anager
t valid for ( %rs onl% from the Date material tested#bilit% Statement
cuments"S* certifcation ect!!#
al Docments
follo6ing Stats 6e (ave to -roceed
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
ctor> 6cce,tance test)
--ort Division De-artment of SEC
seal # Sign , Proect +anger
and P!* can be placed
Requset for Some missing Documents and once it submited then it ill bbmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
8/17/2019 Project Status_302 (Version 1)
61/101
follo6ing Stats 6e (ave to -roceed
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
--ort Division De-artment of SEC
seal # Sign , Proect +anger
not e more t(an Five ear Re-ort$
d t(at also s(old e smitted
follo6ing Stats 6e (ave to -roceed
for the A' report submitted
Requset for Some missing Documents and once it submited then it ill b
bmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.
ar -ast t(en test s(old condcted ne6l, and smit
for the '%pe 'est Submitted
Requset for Some missing Documents and once it submited then it ill b
bmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
8/17/2019 Project Status_302 (Version 1)
62/101
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.
8/17/2019 Project Status_302 (Version 1)
63/101
in Com-liance Statement
come A status!
mitted
8/17/2019 Project Status_302 (Version 1)
64/101
in Com-liance Statement
come A status!
mitted
come A status!
8/17/2019 Project Status_302 (Version 1)
65/101
in Com-liance Statement
mitted
8/17/2019 Project Status_302 (Version 1)
66/101
!ase Design Submission
S,acer Dam,er
Tec
8/17/2019 Project Status_302 (Version 1)
67/101
J"TP re-ort
Ste,52B
Reciving Re-l, from SEC for "TPSmission Comments ased on t(
Ste,53B
All Docments S(old get A stats
Along 6it( t(at t(e Previos Comme
T>,e Test Pan Document Submission
Ste,51B
tain t(e Docment from ;Smit it to t(e PreHalification and
C(eclist for Smission
JCovering Letter and DT
JT,-e Test re-ort !S(ol
JAn, S-ecial Test reHir
Ste,52B
Reciving Re-l, from SEC for "TPSmission Comments ased on t(
A: Acceptable - Approve
B: Acceptable as Noted-
C : Not Acceptable "Res
See Attached Sheet -$
Eac( Revision t(e Step-1 C(ec lit
NoteB Eac( and ever, smission to PreHalifica
NoteB "f t(e T,-e test re-ort is more t(an Five e
A: Acceptable - Approve
B: Acceptable as Noted-
C : Not Acceptable "Res
See Attached Sheet -$
8/17/2019 Project Status_302 (Version 1)
68/101
Ste,53B
All Docments S(old get A stats
Along 6it( t(at t(e Previos Comme
Eac( Revision t(e Step-1 C(ec lit
NoteB Eac( and ever, smission to PreHalifica
8/17/2019 Project Status_302 (Version 1)
69/101
+mai ; Proect Cordinator
om ! SEC*E#DD$
mission
# DTS and get Signed from Proect +anager
t valid for ( %rs onl% from the Date material tested#bilit% Statement
cuments"S* certifcation ect!!#
al Docments
follo6ing Stats 6e (ave to -roceed
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
ctor> 6cce,tance test)
--ort Division De-artment of SEC
seal # Sign , Proect +anger
and P!* can be placed
Requset for Some missing Documents and once it submited then it ill bbmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
8/17/2019 Project Status_302 (Version 1)
70/101
follo6ing Stats 6e (ave to -roceed
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
--ort Division De-artment of SEC
seal # Sign , Proect +anger
not e more t(an Five ear Re-ort$
d t(at also s(old e smitted
follo6ing Stats 6e (ave to -roceed
for the A' report submitted
Requset for Some missing Documents and once it submited then it ill b
bmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.
ar -ast t(en test s(old condcted ne6l, and smit
for the '%pe 'est Submitted
Requset for Some missing Documents and once it submited then it ill b
bmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
8/17/2019 Project Status_302 (Version 1)
71/101
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.
8/17/2019 Project Status_302 (Version 1)
72/101
in Com-liance Statement
come A status!
mitted
8/17/2019 Project Status_302 (Version 1)
73/101
in Com-liance Statement
come A status!
mitted
come A status!
8/17/2019 Project Status_302 (Version 1)
74/101
in Com-liance Statement
mitted
8/17/2019 Project Status_302 (Version 1)
75/101
!ase Design Submission
$ardware +ittings
Tec
8/17/2019 Project Status_302 (Version 1)
76/101
%Covering &etter and
%*P report
Ste,52BReciving Reply from SEC for *P
Submission Comments based o
Ste,53B
All Documents Should get A st
Along with that the Previous Co
T>,e Test Pan Document Submission
Ste,51B
!btain the Document from "!
Submit it to the Pre#uali$cation
Checklist for Submission
%Covering &etter and
%ype est report +Sh
%Any Special est re#
Ste,52B
Reciving Reply from SEC for *P
Submission Comments based o
A: Acceptable - Appr
B: Acceptable as Not
C: Not Acceptable !R
See Attached Shee
Each Revision the Step-1 Chec
NoteB Eac( and ever, smission to PreHalific
NoteB "f t(e T,-e test re-ort is more t(an Five
A: Acceptable - Appr
B: Acceptable as Not
8/17/2019 Project Status_302 (Version 1)
77/101
Ste,53B
All Documents Should get A st
Along with that the Previous Co
C: Not Acceptable !R
See Attached Shee
Each Revision the Step-1 Chec
NoteB Eac( and ever, smission to PreHalific
8/17/2019 Project Status_302 (Version 1)
78/101
+mai ; Proect Cordinator
rom ! SEC*E#DD$
mission
r # DTS and get Signed from Proect +anager
rt valid for ( %rs onl% from the Date material tested#ibilit% Statement
ocuments"S* certifcation ect!!#
hnical Documents
n the following Status we have to proceed
tus until that the Submission will Continue with Revisions.
mment Sheet also should be attached and Actions taken shoul
ctor> 6cce,tance test)
and Support Division Department of SEC
ved and P.O can be placed
ed- Requset for Some missing Documents and once it submitesubmit" -#hanged of Documents Required
t -#omments on the Documents to Rectif$.
k lit should be followed and with the corrected and updated do
8/17/2019 Project Status_302 (Version 1)
79/101
DS seal ' Sign by Pro(ect )anger
n the following Status we have to proceed
tus until that the Submission will Continue with Revisions.
mment Sheet also should be attached and Actions taken shoul
and Support Division Department of SEC
DS seal ' Sign by Pro(ect )anger
uld not be more than ,ive -ear Report
uired that also should be submitted
n the following Status we have to proceed
ved for the %A& report submitted
ed- Requset for Some missing Documents and once it submite
submit" -#hanged of Documents Required
t -#omments on the Documents to Rectif$.
k lit should be followed and with the corrected and updated do
ation and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.
ear -ast t(en test s(old condcted ne6l, and smit
ved for the &$pe &est Submitted
ed- Requset for Some missing Documents and once it submite
8/17/2019 Project Status_302 (Version 1)
80/101
tus until that the Submission will Continue with Revisions.
mment Sheet also should be attached and Actions taken shoul
submit" -#hanged of Documents Required
t -#omments on the Documents to Rectif$.
k lit should be followed and with the corrected and updated do
ation and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.
8/17/2019 Project Status_302 (Version 1)
81/101
e be mentioned in Compliance Statement
then it ill become A status.
uments will be submitted
8/17/2019 Project Status_302 (Version 1)
82/101
e be mentioned in Compliance Statement
then it ill become A status.
uments will be submitted
then it ill become A status.
8/17/2019 Project Status_302 (Version 1)
83/101
8/17/2019 Project Status_302 (Version 1)
84/101
!ase Design Submission
N+'!
Tec
8/17/2019 Project Status_302 (Version 1)
85/101
J"TP re-ort
Ste,52B
Reciving Re-l, from SEC for "TPSmission Comments ased on t(
Ste,53B
All Docments S(old get A stats
Along 6it( t(at t(e Previos Comme
T>,e Test Pan Document Submission
Ste,51B
tain t(e Docment from ;Smit it to t(e PreHalification and
C(eclist for Smission
JCovering Letter and DT
JT,-e Test re-ort !S(ol
JAn, S-ecial Test reHir
Ste,52B
Reciving Re-l, from SEC for "TPSmission Comments ased on t(
A: Acceptable - Approve
B: Acceptable as Noted-
C : Not Acceptable "Res
See Attached Sheet -$
Eac( Revision t(e Step-1 C(ec lit
NoteB Eac( and ever, smission to PreHalifica
NoteB "f t(e T,-e test re-ort is more t(an Five e
A: Acceptable - Approve
B: Acceptable as Noted-
C : Not Acceptable "Res
See Attached Sheet -$
8/17/2019 Project Status_302 (Version 1)
86/101
Ste,53B
All Docments S(old get A stats
Along 6it( t(at t(e Previos Comme
Eac( Revision t(e Step-1 C(ec lit
NoteB Eac( and ever, smission to PreHalifica
8/17/2019 Project Status_302 (Version 1)
87/101
+mai ; Proect Cordinator
om ! SEC*E#DD$
mission
# DTS and get Signed from Proect +anager
t valid for ( %rs onl% from the Date material tested#bilit% Statement
cuments"S* certifcation ect!!#
al Docments
follo6ing Stats 6e (ave to -roceed
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
ctor> 6cce,tance test)
--ort Division De-artment of SEC
seal # Sign , Proect +anger
and P!* can be placed
Requset for Some missing Documents and once it submited then it ill bbmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
8/17/2019 Project Status_302 (Version 1)
88/101
follo6ing Stats 6e (ave to -roceed
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
--ort Division De-artment of SEC
seal # Sign , Proect +anger
not e more t(an Five ear Re-ort$
d t(at also s(old e smitted
follo6ing Stats 6e (ave to -roceed
for the A' report submitted
Requset for Some missing Documents and once it submited then it ill b
bmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.
ar -ast t(en test s(old condcted ne6l, and smit
for the '%pe 'est Submitted
Requset for Some missing Documents and once it submited then it ill b
bmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
8/17/2019 Project Status_302 (Version 1)
89/101
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.
8/17/2019 Project Status_302 (Version 1)
90/101
in Com-liance Statement
come A status!
mitted
8/17/2019 Project Status_302 (Version 1)
91/101
in Com-liance Statement
come A status!
mitted
come A status!
8/17/2019 Project Status_302 (Version 1)
92/101
in Com-liance Statement
mitted
8/17/2019 Project Status_302 (Version 1)
93/101
!ase Design Submission
rounding
Tec
8/17/2019 Project Status_302 (Version 1)
94/101
J"TP re-ort
Ste,52B
Reciving Re-l, from SEC for "TPSmission Comments ased on t(
Ste,53B
All Docments S(old get A stats
Along 6it( t(at t(e Previos Comme
T>,e Test Pan Document Submission
Ste,51B
tain t(e Docment from ;Smit it to t(e PreHalification and
C(eclist for Smission
JCovering Letter and DT
JT,-e Test re-ort !S(ol
JAn, S-ecial Test reHir
Ste,52B
Reciving Re-l, from SEC for "TPSmission Comments ased on t(
A: Acceptable - Approve
B: Acceptable as Noted-
C : Not Acceptable "Res
See Attached Sheet -$
Eac( Revision t(e Step-1 C(ec lit
NoteB Eac( and ever, smission to PreHalifica
NoteB "f t(e T,-e test re-ort is more t(an Five e
A: Acceptable - Approve
B: Acceptable as Noted-
C : Not Acceptable "Res
See Attached Sheet -$
8/17/2019 Project Status_302 (Version 1)
95/101
Ste,53B
All Docments S(old get A stats
Along 6it( t(at t(e Previos Comme
Eac( Revision t(e Step-1 C(ec lit
NoteB Eac( and ever, smission to PreHalifica
8/17/2019 Project Status_302 (Version 1)
96/101
+mai ; Proect Cordinator
om ! SEC*E#DD$
mission
# DTS and get Signed from Proect +anager
t valid for ( %rs onl% from the Date material tested#bilit% Statement
cuments"S* certifcation ect!!#
al Docments
follo6ing Stats 6e (ave to -roceed
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
ctor> 6cce,tance test)
--ort Division De-artment of SEC
seal # Sign , Proect +anger
and P!* can be placed
Requset for Some missing Documents and once it submited then it ill bbmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
8/17/2019 Project Status_302 (Version 1)
97/101
follo6ing Stats 6e (ave to -roceed
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
--ort Division De-artment of SEC
seal # Sign , Proect +anger
not e more t(an Five ear Re-ort$
d t(at also s(old e smitted
follo6ing Stats 6e (ave to -roceed
for the A' report submitted
Requset for Some missing Documents and once it submited then it ill b
bmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.
ar -ast t(en test s(old condcted ne6l, and smit
for the '%pe 'est Submitted
Requset for Some missing Documents and once it submited then it ill b
bmit# -$hanged of Documents Required
mments on the Documents to Rectif%!
8/17/2019 Project Status_302 (Version 1)
98/101
ntil t(at t(e Smission 6ill Contine 6it( Revisions.
nt S(eet also s(old e attac(ed and Actions taen s(ole e mentione
(old e follo6ed and 6it( t(e corrected and -dated docments 6ill e
tion and S--ort De-artment of SEC normall, taes 8 6ees for re-l,.
8/17/2019 Project Status_302 (Version 1)
99/101
in Com-liance Statement
come A status!
mitted
8/17/2019 Project Status_302 (Version 1)
100/101
in Com-liance Statement
come A status!
mitted
come A status!
8/17/2019 Project Status_302 (Version 1)
101/101
in Com-liance Statement
mitted