Old and New There is something satisfying about seeing a renovation from start to finish. It’s even more gratifying to see the before and after comparisons. AMCASE ® had the privilege of being a part of this school’s science lab remodeling project. Though the lab had been in place for a number of years, everything needed to go…everything except the hardwood floors. The floors were refinished, retaining some of the old while ushering in the new with modular casework to create a uniqueness all its own. PROJECT INFO: Client: School Location: NJ Project Spotlight #13 © AMCASE ® inc. Before www.amcase.com
2

Project Spotlight - AMCASE · remodeling project. Though the lab had been in place for a number of years, everything needed to go…everything except the hardwood floors. The floors

Jul 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Spotlight - AMCASE · remodeling project. Though the lab had been in place for a number of years, everything needed to go…everything except the hardwood floors. The floors

Old and NewThere is something satisfying about seeing a renovation from start to finish.

It’s even more gratifying to see the before and after comparisons.

AMCASE® had the privilege of being a part of this school’s science lab

remodeling project. Though the lab had been in place for a number of years,

everything needed to go…everything except the hardwood floors. The floors

were refinished, retaining some of the old while ushering in the new with

modular casework to create a uniqueness all its own.

Project Info:Client: School

Location: NJ

Project Spotlight#13

© AMCASE® inc.

Before

www.amcase.com

Page 2: Project Spotlight - AMCASE · remodeling project. Though the lab had been in place for a number of years, everything needed to go…everything except the hardwood floors. The floors

www.amcase.com

Extreme MakeoverThE ChallENgEThis was an extensive project which required coordinating multiple trades

to renovate the entire science room lab from top to bottom. New piping had

to be run, along with refinishing the existing hardwood floors and repainting

the walls before the casework could be installed.

ThE aMCaSE® SOluTiONGood communication, patience, and coordination between the trades was

essential due to the plumbing, electrical, and gas lines that needed to be

installed or modified to work properly with the casework installation. The

transformation was remarkable, and the results were immediately evident.

Every solution is different; that’s why there’s AMCASE®.

© AMCASE® inc. All rights reserved.

Before After

School labNew Jersey

Fun Facts

30+ - number of years the

science lab millwork furniture

was in service.

10-25 - average lifespan