Top Banner
Project Showcase Up to June 2012
4
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Showcase

Project ShowcaseUp to June 2012

Page 2: Project Showcase

Recent project showcase

This slideshow contains NEPEAN wide project success stories.

Page 3: Project Showcase

Ridges Iron Ore: Wyndham Barge Loading Facility

Page 4: Project Showcase

Ridges Iron Ore: Wyndham Barge Loading Facility

Location: Wyndham, WA, Australia

Client: Kimberly Metals Group

Contract Value: AUD$ 4.8M

Completion: December 2010 – June 2011

Design of the CV02 Pivot Conveyor was particularly challenging, with the head end positioned on a pontoon capable of moving significantly in all directions, loading into a rotating hopper, accommodate an 8.5m tidal range and withstand cyclonic wind conditions.

All ore is loaded onto barges via the Telestacker, which is mounted on the pontoon with the head end of CV02. These are then towed 1.2km to waiting ships in the Cambridge Gulf for delivery to sinter markets in China.