Page 1: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Error! No text of specified style in document. part c - Environmental Management 1

PART C - ENVIRONMENTAL MANAGEMENT

PROJECT SEA DRAGON PTY LTD

CORE BREEDING CENTRE AND BROODSTOCK

MATURATION CENTRE, BYNOE HARBOUR

ENVIRONMENTAL IMPACT STATEMENT

Page 2: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Error! No text of specified style in document. part c - Environmental Management 2-i

Page 3: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   15‐284 

15 ENVIRONMENTAL MANAGEMENT  

15.1 TERMS OF REFERENCE ADDRESSED IN THIS CHAPTER 

This chapter describes the environmental management measure proposed to minimise potential impacts 

identified in the risk assessment and environmental assessment process.  

Specifically, in relation to the potential impacts on the marine environment from construction of the project 

and the discharge of water from the project, in the SoR the NT EPA state the following: 

Generally, it is expected that benthic habitats would recover once the pipes are in place 

The NT EPA is satisfied that the potential impacts and risks associated with installation of the seawater 

intake pipe are unlikely to be significant and can be adequately managed through the implementation of 

measures proposed in the NOI. In relation to the release point, there is potential for acid sulfate soils to be 

disturbed in a limited area but impacts are likely to be localised and minimal if such material is managed 

appropriately 

The NT EPA considers that the interim water quality guidelines / values provide a reasonable basis for 

assessment of potential impacts until the guidelines values can be refined 

The NT EPA considers the proposed release of discharge water to Wheatley Creek is not likely to 

significantly affect the regional water quality of Bynoe Harbour in the long term, though there may be 

some localised, longer term enrichment near the point of discharge in Wheatley Creek. 

Furthermore, in relation to erosion and sediment control, ASS, biting insects and weeds, the NT EPA state in the 

SoR that potential risk associated with erosion and sediment control, acid sulfate soils, biting insects and weeds 

can be adequately managed through the implementation of standard measures. Further adding, that the 

proponent has committed to preparing and implementing detailed management plans for potential impacts of 

the Project (Appendix 19).  

Table 15‐1 summarises the requirements from the ToR for the Project of relevance to socio‐economics and 

references where they have been addressed. 

TABLE 15‐1  TERMS OF REFERENCE 

Terms of Reference  Sections 

5  Environmental Management 

The specific safeguards and controls proposed to be employed to minimise or 

remedy environmental impacts identified in the risk assessment process are to 

be included in an EMP. The EMP should be strategic, describing a framework for 

continuing management, mitigation and monitoring programs for the significant 

environmental impacts of the Project. 

The scope, content and structure of the EMP will be a function of the outcomes 

of the environmental risk assessment and determined by the significance of the 

environmental impacts. The EMP should not be prepared in isolation but should 

be consistent and integrated with the principles of an environmental 

management system. The EMP should include specialised management plans 

where it is necessary to provide a high level of operational detail. As much detail 

Chapter 15 

Appendix 19 

Page 4: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   15‐285 

Terms of Reference  Sections 

as is practicable should be provided to enable adequate assessment of the 

proposed environmental management practices and procedures. 

The EMP needs to address the Project phases (construction, operation and 

decommissioning/rehabilitation) separately. It must state the environmental 

objectives, performance criteria, monitoring, reporting, corrective action, 

necessary resourcing, responsibility and timing for each environmental issue. 

Further information on the development of an EMP is available in the NT EPA’s 

Guideline for the Preparation of an Environmental Management Plan, accessible 

on the NT EPA webpage at: https://ntepa.nt.gov.au/environmental‐

assessments/assessmentguidelines. 

15.2 ENVIRONMENTAL MANAGEMENT STRATEGIES 

Environmental management strategies have been prepared based on the environmental risks identified in the 

Chapter 6, and potential impacts, mitigation measures and monitoring identified in the EIS Part B ‐ 

Environmental Assessment. These environmental management strategies consolidate and summarise the 

commitments made as part of the EIS, and will be used to develop site specific management procedures after 

approval of the Project. 

Construction and operational strategies to manage potential impacts are summarised below and detailed 

further in Appendix 19: 

C1 ‐ Erosion and Sediment Control Strategy 

C2 ‐ Land and Soils Management Strategy 

C3 ‐ Acid Sulfate Soil Management Strategy 

C4 ‐ Vegetation Management Strategy 

C5 ‐ Weeds and Pests Strategy 

C6 ‐ Fauna Management Strategy 

C7 ‐ Surface Water Management Strategy 

C8 ‐ Groundwater Management Strategy 

C9 ‐ Waste Management Strategy 

C10 ‐ Air and Noise Management Strategy 

C11 ‐ Effluent Management Strategy 

C12 ‐ Hazardous Materials Management Strategy 

C13 ‐ Traffic Management Strategy 

C14 ‐ Social Impact Management Strategy 

C15 ‐ Cultural Heritage Management Strategy 

Page 5: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   15‐286 

15.3 ENVIRONMENTAL ASPECTS AND IMPACTS 

Risk assessment will be conducted as part of each site / phase specific management plan, in order to define site 

and phase specific risks, and develop appropriate mitigation and management measures. 

Risk assessment follows a standard semi‐quantitative approach consistent with AS/NZS ISO 31000:2009 Risk 

Management – Principles and Guidelines. The project risk assessment is outlined in the EIS, Volume 1, 

Chapter 6. 

15.4 RELEVANT LEGISLATION AND APPROVALS 

A Legislation and Approvals Register is required to be developed and regularly updated as part of the project, 

outlining the legislation relevant to the Project by jurisdiction, administering authority and relevance. It is 

intended to be developed on a site by site basis, and the Legislation and Approvals Register template can be 

used for this purpose. 

The EIS, Volume 1, Chapter 4 ‐ Approvals, Conditions and Agreements ‐ provides the relevant legislation and 

approvals, and will be incorporated into this register once Project approval is gained.  

It is the responsibility of the relevant Environmental Manager to ensure the register is up to date, and the 

project complies with the legislative requirements of the register. 

Project / phase specific management plans are required to reference this register, and determine the specific 

impacts of the relevant legislation on that particular project and management plan. 

Some sources of information to develop and maintain the register are: 

Commonwealth 

Federal Register of Legislation 

https://www.legislation.gov.au/ 

Commonwealth Department of the Environment: Legislation 

http://www.environment.gov.au/about‐us/legislation 

Commonwealth Department of the Environment: Permits, assessments and licenses 

http://www.environment.gov.au/about‐us/business‐us/permits‐assessments‐licences 

Business.gov.au Environmental legislation (commonwealth and state environmental legislation links) 

http://www.business.gov.au/business‐topics/business‐planning/environmental‐

management/Pages/environmental‐legislation.aspx 

Northern Territory 

Current Northern Territory Legislation Database 

http://dcm.nt.gov.au/strong_service_delivery/supporting_government/current_northern_territory_legisla

tion_database 

NT EPA Legislation  

http://www.ntepa.nt.gov.au/about‐nt‐epa/legislation  

Page 6: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   15‐287 

15.5 ROLES AND RESPONSIBILITIES 

The general descriptions of the key roles are outlined below, with the organisational structure and specific 

personnel included in Appendix 19. 

Note where reference is made in this document to the ‘relevant Environmental Manager’, this will be the Chief 

Environmental Manager for EMS / corporate level matters or covering all sites, and the relevant site 

Environmental Manager for site matters.  

15.5.1 Chief Operating Officer  

Establish the overall direction of Project Sea Dragon from an environmental perspective, and lead or 

support the development of the Environmental Policy 

Provide sufficient resources to support the objectives of the EMS 

Provide resources for the ongoing review and continual improvement of the EMS. 

15.5.2 General Manager ‐ Health, Safety & Environment 

Develop and refine environmental objectives, targets and EMS level procedures 

Monitor overall EMS performance 

Provide input to the ongoing review and continual improvement of the EMS 

Ensure site managers have relevant approvals, management plans (i.e. EMP) and licenses to undertake the 

works 

Ensuring that adequate resources are deployed in a manner to support Site Managers in achieving their 

environmental objectives  

Develop training materials for EMS / corporate level training requirements. 

15.5.3 Site Managers 

Responsible for day to day compliance 

Ensure that site specific EMPs are implemented on the site 

Ensure that personnel and sub‐contractors are appropriately inducted and are aware of requirements of 

the EMPs 

Relay information to site personnel. 

15.5.4 Site Environmental Role ‐ Site Manager, or Delegate 

Responsible for developing and implementing site specific EMP  

Liaise with Site Manager 

Responsible for environmental inspections and monitoring 

Develop training materials for site level training requirements and conduct training 

Implement non‐conformance processes (incident and complaint management, corrective actions, 

notification) 

Act as the site contact for governmental officers (Commonwealth, State/Territory, Councils) 

Page 7: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   15‐288 

Liaise with environmental consultants when necessary 

Lead periodic review and updates of site specific EMP as required. 

15.5.5 Site Staff and Sub‐contractors 

Adhere to relevant aspects of the site specific EMP (Appendix 19) communicated during inductions, and to 

directions given by the Site Manager and Environmental Manager 

Have a general duty to not cause environmental harm 

Notify their supervisor / employer of any environmental (and other) incidents, near misses and hazards 

immediately. Supervisors/employers to ensure the site manager and/or environmental manager is notified 

as soon as possible. 

15.6 TRAINING AND AWARENESS 

Project Sea Dragon Pty Ltd will ensure that all employees are appropriately trained and/or qualified to carry out 

their duties. All persons working for or on behalf of Project Sea Dragon Pty Ltd, including staff and contractors, 

will be made aware of the environmental policy, and the requirements of the EMS and site specific EMPs. This 

will include their role and responsibilities, the significant actual or potential environmental aspects and 

associated impacts of their work activities, benefits of improved performance, and the consequences of the 

departure from EMS requirements. 

Training will comprise the following elements: 

Personnel assigned roles within the EMS (including site specific EMPs) will ensure they are appropriately 

qualified and experienced 

Site induction will be carried out for all new employees and those who have not received such training to 

ensure they are appropriately briefed on the relevant aspects of the EMS and the relevant site and phase 

specific EMPs 

Regular toolbox talks or similar will be held onsite to discuss items and issues of relevance to the EMS.  

Form EM‐00‐FO‐001 Training Needs Analysis is provided to identify additional training requirements. 

15.7 COMMUNICATION 

15.7.1 External Communications 

Relations between Project Sea Dragon Pty Ltd and the public are important for maintaining a good working 

relationship within the community. Project Sea Dragon Pty Ltd is committed to being a part of the community 

as a whole, seeking advice and views as appropriate. 

Key points of contact within the organisation for external communication (public, statutory agencies, etc.) are 

outlined in the EM‐00‐CT‐0001 Organisational Chart. 

The following website will remain the main entry point on the internet for dissemination and communication 

with the wider public: 

http://seafarmsgroup.com.au/project‐sea‐dragon/ 

Refer also to Section 15.11 for details of responding to non‐compliance events. 

Page 8: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   15‐289 

15.7.2 Board Meetings 

Project Sea Dragon Pty Ltd will incorporate the Environmental Policy and EMS Objectives and Targets into 

regular management level meetings, communications and discussions, and will implement the management 

review process, which reviews environmental objectives and targets, progress towards project aims, changes in 

legal and other requirements and the EMS in general. In particular, management will review audit reports, non‐

compliance and project time tables as appropriate. 

15.7.3 Internal 

At a site level, the results of internal audits, monitoring reports and any non‐compliance will be directed to the 

Site Manager / Environmental Manager as they become available. The Site Manager / Environmental Manager 

should be advised of any monitoring results or other activity that does not comply with any of the conditions of 

development or the EMS / site EMPs as soon as practicable but within at least 48 hrs of the event or receipt of 

results (as applicable).  

At a corporate level, internal audit and review reports will be circulated amongst the management team and 

will form part of board meeting content for discussion and review. Regular site compliance reports will be 

reviewed by the General Manager ‐ Health, Safety & Environment, with significant actual or potential issues 

raised at the board and/or Chief Operating Officer level. 

EM‐00‐CT‐001 Organisational Chart shows the relevant roles and persons, and the preferred communication 

channels. 

15.8 SUPPLIER AND SUB‐CONTRACTOR MANAGEMENT 

Sub‐contractors will be responsible for adhering to the EMS and site specific EMPs, and to directions given by 

the Site Manager and Environmental Manager in regards to environmental management.  

Sub‐consultants are required to confirm they have policies and procedures in place to allow them to conform 

to the relevant aspects of the EMS and site specific EMPs. Procedure [B3] – sub‐contractor management sets 

out arrangements to ensure this is undertaken. 

The Site Manager must induct each sub‐contractor prior to beginning works on the site. 

Each sub‐contractor is to have a nominated contact point to the Site Manager. 

15.9 MONITORING AND REVIEW 

The key monitoring and review components of the EMS are shown in EM‐00‐RG‐0003 Monitoring and Review. 

This outlines the strategic level monitoring required, and elements common to all sites, particularly those 

required to report to the Project Sea Dragon Pty Ltd corporate level. 

A regular external audit of the EMS and individual sites would also be beneficial as a check against internal 

auditing and management of the system and project. 

15.10 NON‐COMPLIANCE AND CORRECTIVE ACTION 

Non‐compliance with any aspect of the EMS or site specific requirements (including EMPs), the project consent 

conditions and/or monitoring limits will require corrective action and reporting. Other incidents such as fire, 

unplanned animal release, disease outbreak, or other natural or man‐made incidents should be included. The 

type and scale of corrective action and reporting will depend on the type and scale of the non‐compliance. 

Generally, non‐compliance will be of the following forms: 

Page 9: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   15‐290 

1. Non‐compliance with specific condition of approval, monitoring limit, etc.

2. Non‐compliance with other EMS or EMP requirement or target, including key EMS Objectives and Targets

3. Spills or other incidents causing or with the potential to cause environmental harm (including fire, release

of prawns to the environment, disease outbreak, etc.) (may be captured in items 1 or 2 above)

4. Near miss for the above

5. Complaints.

All of the above items require an incident / complaint / improvement form to be filled out (EM‐00‐FO‐0002). 

Corrective actions undertaken at the time of the incident will be described, and additional actions required for 

the incident defined when filling out the form. The incident will also be entered into the incidents complaints 

register (EM‐0x‐RG‐0004), which assigns actions, responsible person(s), closeout date, and opportunities for 

improvement. Improvements or revisions required to EMS documents (including site EMPs) are also to be 

included in this register, including as results from audits and reviews. 

15.11 COMPLAINTS MANAGEMENT 

All complaints and inquiries should be directed to the Environmental Manager. In consultation with the site 

manager, the Environmental Manager will assess the validity and seriousness of the complaint or inquiry and 

respond as appropriate. Any complaints will be recorded on an incident / complaint / improvement form (EM‐

00‐FO‐0002), and stored within the incidents / complaints / improvement register (EM‐0x‐RG‐0004). 

Complaints will be logged with date, time and contact details.  The complaint would be forwarded to either the 

Site or General Manager ‐ Health, Safety and Environment of Project Sea Dragon Pty Ltd depending on the 

nature of the complaint. A response to a complaint during the working week would normally be made within 

48 hours. 

15.12 DOCUMENTATION AND RECORDS 

15.12.1 Document Control 

Document control is managed through the use of the document register (EM‐00‐RG‐0001), which is to be 

updated when any document is prepared or revised by the author of that document. The register is under the 

primary responsibility of the Chief Environmental Manager, but will be edited by site Environmental Managers 

to add site specific documents.  

Release of new documents for the system is to be approved by the immediate Environmental Manager for that 

document, namely: 

For EMS / corporate level documents, the Chief Environmental Manager 

For site specific documents, the Site Environmental Manager. 

Any document not signed and authorised for release is not considered a current document for the purposes of 

the EMS. It is the responsibility of the author of a document (new or revision) to obtain approval for release 

from the relevant Environmental Manager. 

The document control page from this manual (page after the cover page) is to be present for all system 

documents other than forms and registers. In all cases, headers and footers are to contain the same 

information as in this document, including: 

Page 10: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   15‐291 

Document name 

Document reference 

Revision 

Date Printed 

A note stating that Printed copies are uncontrolled 

Page number and number of pages 

Only current documents shall be in use and it is the responsibility of the relevant Environmental Manager to 

ensure that any updates are propagated as required to the points of issue and any old issues are taken out of 

circulation. Primary controlled documents will be maintained electronically on the project intranet, with 

revised copies superseding older copies of documents. These older documents will be moved to an ‘archive’ 

folder. 

Any changes in documentation or legislative or other requirements will be followed by a review by the relevant 

Environmental Manager (or by the report author, communicated to the relevant Environmental Manager) of 

the possible impacts on the remainder of the system and changed where necessary. The scale of this review 

will depend on the nature of the changes. 

15.12.2 Document Numbering 

The documentation numbering scheme is as shown below. Where site specific documents are required in 

addition to the EMS level document, such as the Monitoring and Review register, these are to take the same 

numbering as the EMS level document, regardless of the number of site level documents (e.g. EMS level = EM‐

00‐0003, site level = EM‐01‐0003). 

[Aspect]‐[Site]‐[Doc Type]‐[Doc Number][revision] [Short name] 

e.g. EM‐00‐RG‐0001b Document Register, EM‐01‐MP‐0001a‐CBC and BMC Facility EMP 

Where: 

[Aspect] = Selected from the following list: 

EM = Environmental, generally all EMS documents, but allows for other quality level or WHS documents to use 

the same numbering system 

[Site] = site code, selected from the following list: 

00 = EMS level (no / all sites) 

01 = CBC and BMC Facility 

[Doc Type] = Document type, selected from the following list: 

RG = Register 

MN = Manual 

CT = Chart (e.g. organisational chart) 

FO = Form 

Page 11: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   15‐292 

MP = Management Plan (e.g. construction environmental management plan) 

[Doc Number] = consecutive numbering for this type of document, as 4 numerals starting at 0001 

[revision] = lower case letters (a, b, c etc.) for drafts, and numerals (0, 1, 2, 3, etc.) for issued documents 

[Short name] = a very short name to aid in identification, generally less than 24 characters including spaces 

15.12.3 External Documents and Standards 

Preferably, standards and guidelines will be sourced directly from the primary source when accessed, rather 

than from locally stored copies. Where locally stored copies are stored and used, it is the responsibility of the 

relevant Environmental Manager to maintain the latest copies of such documents for use. 

SAI Global Standards Watch is a useful tool for keeping apprised of updates to relevant standards: 

https://infostore.saiglobal.com/store/AboutSWatch.aspx. 

15.12.4 Records 

Relevant documentation shall be retained as records within the EMS system, stored on the project intranet. 

These records shall include (but not be limited to): 

information on compliance, including audit and review (internal or external) reports or forms 

details of nonconformities and corrective and preventive actions, including Non‐conformance forms and 

the incident/complaint/improvement register 

evidence of fulfilment of objectives/targets, including review / audit reports 

information on participation in training, including training needs analysis forms (copies of each update 

saved separately with date) 

permits, licences or other forms of legal authorization, 

results of inspection and calibration activity and 

results of operational controls (maintenance, design, manufacture). 

15.13 REPORTING 

Reporting requirements are detailed in the EM‐00‐RG‐0003 Monitoring and Review register and site specific 

Monitoring and Review registers (e.g. EM‐01‐RG‐0003 Monitoring and Review). 

Page 12: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   16‐293 

16 REFERENCES 

Acil Allen Consulting (2016), Project Sea Dragon Socio‐Economic Assessment Stage 1 – Legune Grow‐Out 

Facility, Acil Allen Consulting Pty Ltd. 

ANZECC (2000), Australian and New Zealand Guidelines for Fresh and Marine Water Quality. Australian and 

New Zealand Environment and Conservation Council, Canberra. 

Aquaculture Stewardship Council (2014a), ASC Shrimp standard version 1.0. March 2014. Created by the 

Shrimp Aquaculture Dialogue March, 2014. Access date: 27 May 2016. Available from: http://www.asc‐

aqua.org/upload/ASC%20Shrimp%20Standard_v1.0.pdf. 

Aquaculture Stewardship Council (2014b), Shrimp ‐ Species sheets, Aquaculture Stewardship Council. 

Available from: http://www.asc‐aqua.org/upload/Speciessheets_ENG_shrimp_web.pdf. 

AS 1940—Storage and Handling of Flammable & Combustible Liquids 

Aumann, T. and D. Baker‐Gabb (1991), RAOU Report 75. A Management Plan for the Red Goshawk. 

Melbourne. Royal Australasian Ornithologists Union 

Australian Prawn Farmers Association Inc. (2001), Environmental Code of Practise for Australian Prawn 

Farmers. Brisbane, Australian Prawn Farmers Association Inc. 

Begnaze (2002), Archaeological Survey for the Proposed Sunrise Aquaculture Estate at Point Ceylon, Bynoe 

Harbour. Wanguri, Begnaze Pty Ltd. 

BOM (2015), Tropical  cyclones  frequency  and  data       . 

http://www.bom.gov.au/cyclone/about/northern.shtml#history 

Braby, M. and Woinarski, J. (2006), Threatened Species Information Sheet. Dodd’s Azure Ogyris iphis 

doddi. Available from: http://www.lrm.nt.gov.au/__data/assets/pdf_file/0018/10908/dodds_azue_EN.pdf 

Braithwaite, R. W. (1985), The Kakadu fauna survey: an ecological survey of Kakadu National Park. 

Australian National Parks & Wildlife Service. 

Brocklehurst, P. and Edmeades, B. (2003), Mangrove Survey of Bynoe Harbour, Northern Territory. 

Prepared for Department of Infrastructure, Planning and Environment, Northern Territory. 

Brodie, J., Ariel, E., Thomas, C., O’Brien, D. and Berry, K. (2014), Links between water quality and marine 

turtle health. TropWATER Report 14/05, James Cook University. 

Brooks, L. and Pollock, K. (2015), The Darwin dolphin monitoring program: Abundance, apparent survival, 

movements and habitat use of Humpback, Bottlenose and Snubfin dolphins in the Darwin area. Report to 

INPEX, document number L384‐AH‐REP‐ 10012_0 

Burford et al. (2008), Primary  Production  and  nutrients  in  a  tropical  macrotidal  estuary,  Darwin 

Harbour, Australia, Estuarine, Coastal and Shelf Science 79 (2008) 440‐448 

Cardno (2013), Routine Turtle and Dugong Monitoring Program Report – Dredging Report 3 Ichthys 

Nearshore Environmental Monitoring Program. Prepared for INPEX. 

Cardno (2015a), Turtle and dugong monitoring post‐dredging report: Ichthys Nearshore Environmental 

Monitoring Program. Report to INPEX, document number L384‐AW‐ REP‐10250 

Page 13: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   16‐294 

Cardno (2015b), Seagrass monitoring post‐dredging report: Ichthys Nearshore Environmental Monitoring 

Program. Report to INPEX, document number L384‐AW‐REP‐10081 

Chatto, R. and Warnecke, R.M. (2000), Records of cetacean strandings in the Northern Territory of 

Australia. The Beagle 16: 163‐175. 

CO2 Australia (2016), Project Sea Dragon Point Ceylon BMC and CBC EPBC Referral 2016/7713 Response to 

Request for Further Information. CO2 Australia 

 CSIRO (2007), Climate change in Australia, Technical report by the CSIRO. Commonwealth Scientific and 

Industrial Research Organisation 

Dames and Moore (1992), Preliminary assessment of the feasibility of artificial recharge to augment water 

supplies at Pine Creek, Northern Territory, Report for Power and Water Authority, Northern Territory. 

Dear, S‐E., Ahern, C. R., O'Brien, L. E., Dobos, S. K., McElnea, A. E., Moore, N. G. and Watling, K. M., (2014), 

Queensland Acid Sulfate Soil Technical Manual: Soil Management Guidelines. Department of Science, 

Information Technology, Innovation and the Arts, Queensland Government. 

Department of Environment and Heritage Protection (2013), Operational policy – Marine Prawn 

Aquaculture. Licensing waste water releases from existing marine prawn farms in Queensland. Queensland 

Department of Environment and Heritage Protection. 

Department of Infrastructure, Planning and Environment (2002), Finniss Planning Concepts and Land Use 

Objectives. Available from: http://lands.nt.gov.au/__data/assets/pdf_file/0020/25193/finnis02full.pdf 

Department of Infrastructure, Planning and Environment (2002), Land Resources of the Lower Finniss, 

Darwin, Northern Territory Government.  

Department of Infrastructure, Planning and Environment (2003), Point Ceylon (Suntay) Aquaculture Estate, 

Environmental Assessment Report and Recommendations, Darwin, Northern Territory Government. 

Department of Natural Resources, Environment, The Arts and Sport (2008), Groundwater, explanatory 

notes to the groundwater map of the Northern Territory June 2008, Department of Natural Resources, 

Environment, The Arts and Sport, Darwin. The Northern Territory Government, Palmerston. 

Department of Natural Resources, Environment, The Arts and Sport (2010). Water Quality Objectives for 

the Darwin Harbour Region – Background Document.  

Department of Natural Resources, Environment, The Arts and Sport (2010) Land Clearing Guidelines.  

Department of the Environment (2015), Dugong dugon ‐ dugong, Species Profile and Threats Database. 

Viewed online 2 December 2015 at: http://www.environment.gov.au/cgi‐ bin/sprat/public/sprat.pl 

Department of the Environment (2015b), National Conservation Values Atlas. Viewed online 7 December 

2015 at: https://www.environment.gov.au/webgis‐ framework/apps/ncva/ncva.jsf 

Department of Transport and Main Roads (2015), Guide to Traffic Management Part 3: Traffic Studies and 

Analysis, State of Queensland, Department of Transport and Main Roads. 

DLRM (2015), Department of Land Resource Management – NT Fauna Observations. Viewed online 1 

December 2015 at http://www.lrm.nt.gov.au/plants‐and‐animals/information‐ and‐publications/nt‐fauna‐

observations 

Page 14: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   16‐295 

DLRM (2016), Northern Territory Government threatened species fact sheets, various species, accessed 

January 2016 at: http://lrm.nt.gov.au/plants‐and‐animals/threatened‐ species/specieslist 

Dodd, W.D. (1935), Meanderings of a naturalist. The North Queensland Register 

Donovan, D. ( 2001), Environmental code of practice for Australian prawn farmers. Australian Prawn 

Farmers Association. 

Dostine P. L. (2002), Assessment of the ecological condition of freshwater streams in the Darwin region: 

evidence from of survey of macroinvertebrate communities and water quality in the early dry season 2001. 

In: Internal Report No. 43/2002. Natural Resources Management Division‐NT Dept. Infrastructure, Planning 

and Environment, Darwin. 

EcOz (2003), Point Ceylon aquaculture project. Point Ceylon, Bynoe Harbour, Northern Territory 

Environmental Risk Assessment. 

EcOz Environmental Services (2003), Draft Environmental Impact Statement, Point Ceylon Aquaculture 

Estates, Bynoe Harbour, Northern Territory, Volume 1, Main Report. Darwin, EcOz Environmental Services. 

EcOz Environmental Services (2003), Sunrise Aquaculture Estate Point Ceylon, Bynoe Harbour Northern 

Territory, Study of Terrestrial Flora, Darwin, EcOz Environmental Services. 

Enesar (2006), Draft EIS – Proposed Barramundi Fish Farm at Port Patterson, Northern Territory, Prepared 

for Marine Harvest. 

Environmental Code of Practice for Australian Prawn Farmers 

EWL Sciences (2003), Sunrise Aquaculture EIS – Freshwater Aquatic Survey, Darwin, EWL Sciences Pty Ltd. 

FAO (2016), Contributing to food security and nutrition for all, the State of World Fisheries and 

Aquaculture, Rome. 200 pp. 

Fortune, J. (2015), Supplement to 2014 Darwin Harbour Region Report Card, Report No 01/2015D, Aquatic 

Health Unit, Department of Land Resource Management, Palmerston Northern Territory. 

Franklin, D.C., Whitehead, P.J., Pardon, G., Matthews, J., McMahon P. and McIntyre, D. (2005), Geographic 

patterns and correlates of the decline of granivorous birds in northern Australia. Wildlife Research. 32:399‐

408. 

Garnett, S.,T., and Crowley, G.M. (2000), The Action Plan for Australian Birds. Environment Australia: 

Canberra. 

GHD (2003), Suntay Aquaculture Centre, Terrestrial Fauna Survey, Darwin, GHD. 

GHD (2016), Project Sea Dragon Breeding Program Facilities Functional Specification. Darwin, GHD. 

Guidelines for Preventing Mosquito Breeding Associated with Construction Practice near Tidal Areas in the 

NT   

Guidelines for Preventing Mosquito Breeding Sites Associated with Aquaculture Developments in the NT  

Harris, P., Heap, A., Passlow, V., Sbaffi, L., Fellows, M., Porter‐Smith, R., Buchanan, C. and Daniell, J. (2003), 

Geomorphic Features of the Continental Margin of Australia, Report to the National Oceans Office on the 

production of a consistent, high‐quality bathymetric data grid and definition and description of 

geomorphic units for part of Australia’s marine jurisdiction, Geoscience Australia Record 2003/30. 

Page 15: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   16‐296 

Higgins, P.J.,  and  Davies,  S.J.J.F.  (1996), Handbook  of  Australian,  New  Zealand  and  Antarctic Birds. 

Volume 3 – Snipe to Pigeons. Melbourne, Victoria: Oxford University Press. 

Hill, B. (2012), Threatened Species Information Sheet. Black‐Footed Tree‐Rat (Mesembriomys gouldii) 

Available from:  http://www.lrm.nt.gov.au/__data/assets/pdf_file/0009/143100/Black‐footed_tree‐

rat_VU_V3.pdf 

Hill, J., Fett, D. and Perrett, F. (2002), Land Resources of the Lower Finniss. Technical Report 19/2002, 

Natural Systems Division, Northern Territory Government Department of Infrastructure, Planning and 

Environment. 

Integrated Managed Services (2016), Project Sea Dragon Workforce Planning Consulting Services, 

Integrated Managed Services Pty Ltd. 

International Erosion Control Association (IECA) (2008), Best Practice Erosion and Sediment Control. 

Kyne, P.M. (2015), Poster: Sharks and Rays of Northern Australian Rivers. Viewed online 7 December 2015 

at http://www.nespmarine.edu.au/system/files/A2%20NERP%20Sharks%20%26%20Rays 

%20of%20Nth%20Australian%20Rivers%20poster%20V2%20Jun9%2006‐ 15%20low%20res.pdf 

Lin, H.P, G. Charmantier, P. Thuet and J.P. Trilles (1992). Effects of turbidity on survival, osmoregulation 

and gill NA+‐K+ ATPase in juvenile shrimp Penaeus japonicus. Marine Ecology Progress Series 90: 331‐37. 

Lintin Geotechnical (2002), Geotechnical Site Investigation Report, Proposed Aquaculture Project Suntay 

Aquaculture Pty Ltd Bynoe Harbour, NT. Berrimah, Lintin Geotechnical Pty Ltd. 

Lovelock, C. E.  et al. (2015), The vulnerability of Indo‐Pacific mangrove forests to sea‐level rise. Nature 

526: 559‐563 

McKinnon  A.D.,  Trott  ,  L.A.,  Alongi,  D.M.  and  Davidson,  A. (2002) ,  Water  Column Production  and  

Nutrient  Characteristics  in  Mangrove  Creeks  Receiving  Shrimp  Farm Effluent. Aquaculture Research. 

33:55 – 73 

National Native Title Tribunal (2016), Search Register of Native Title Claims. Viewed online 28 October 

2016 at http://www.nntt.gov.au/searchRegApps/NativeTitleRegisters/Pages/Search‐Register‐of‐Native‐

Title‐Claims.aspx   

Nicholls, R. J. and Cazenave (2010), A. Sea‐level rise and its impact on coastal zones. Science. 32:1517–

1520. 

Northern Territory Code of Practice for On‐site Wastewater Management 

Northern Territory Data Warehouse (2015), Gauged Flow Data, Corrawarra Creek and Finniss River. 

Northern Territory Government, Darwin. 

Northern Territory Environmental Protection Authority (2016), Draft Terms of Reference for the 

Preparation of an Environmental Impact Statement, Project Sea Dragon, Core Breeding Centre and 

Broodstock Maturation Centre, Bynoe Harbour. Northern Territory Environmental Protection Authority. 

Northern Territory Environmental Protection Authority (2016). Statement of Reasons, Project Sea Dragon 

Pty Ltd – Core Breeding Centre and Broodstock Maturation Centre, Point Ceylon. Northern Territory 

Environmental Protection Authority. 

Page 16: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   16‐297 

Northern Territory Government (2016), Developing the North, https://northernaustralia.nt.gov.au/, 

accessed 3 November 2016. 

Northern Territory Government (2016), Ord Stage 3 Expansion ‐ Spirit Hills, 

https://nt.gov.au/industry/major‐projects‐in‐NT/ord‐stage‐3‐expansion‐spirit‐hills, accessed 3 November 

2016. 

Northern Territory Land Clearing Guidelines.  

O'Malley, C. (2006), National Recovery Plan for the Gouldian Finch (Erythrura gouldiae). National Gouldian 

Finch Recovery Team. Palmertson, NT Parks and Wildlife. Available from: 

http://www.environment.gov.au/biodiversity/threatened/publications/e‐gouldiae.html. 

Orange Environmental (2016), Project Sea Dragon CBC and BMC EPBC Act Referral. Orange Environmental.  

OzCoasts (2015), Bynoe  Harbour  Water  and  Sediment  Data  Report,  OzCoasts  (GeoScience  Australia) 

2012 

Palmer P., Erler D., Morrison,C. and Rutherford, B.  Nutrient levels in experimental tanks supplied with 

prawn pond effluent: the effect of artificial substrate and different densities of the banana prawn Penaeus 

merguiensis (de Man). Department of Employment, Economic Development and Innovation (DEEDI).  

Parra, G.J. (2006), Resource partitioning in sympatric delphinids: Space use and habitat preferences of 

Australian snubfin and Indo‐Pacific humpback dolphins. Journal of Animal Ecology 75:862‐874. 

Peregrine Bird Tours (2010), Darwin and Ashmore Reef Tour Report 12 ‐ 22 October 2010. Available from: 

http://www.peregrinebirdtours.com/a/Tour‐Reports/Darwin‐and‐Ashmore‐Reef 

Pietsch B. (1986), Geological Map Series Explanatory Notes ‐ BYNOE 5072. Department of Mines and 

Energy, Darwin. 

Robertson, A. I., Alongi, D. M. (eds.) (1992), Tropical Mangrove Ecosystems. Coastal and Estuarine Studies 

41. American Geophysical Union, Washington, DC, p. 329.

Roelofs, A., Coles, R., and Smit, N. (2005), A survey of intertidal seagrass from Van Dieman Gulf to 

Castlereagh Bay, Northern Territory, and from Gove to Horn Island, Queensland. Report to the National 

Oceans Office, Department of Environment and Heritage.   

Royal Australian Navy (2014), AUS 29 – Approaches to Bynoe Harbour and Port Patterson. Australian 

Hydrographic Service, Canberra 

Royal Australian Navy (2016), Australian National Tide Tables. Department of Defence, Canberra 

Santos, R., et al. (2010), Relationship between fibropapillomatosis and environmental quality: a case study 

with Chelonia mydas off Brazil. Diseases of Aquatic Organisms 89: 87‐95 

SEA (2010), High Resolution Storm Tide and Climate Change Impacts Study – 2010, J0911‐PR001B prepared 

for Northern Territory Department of Lands and Planning 

Seafarms (2016), Project Sea Dragon, Draft Biosecurity Plan – August 2016. Perth, Seafarms Group Ltd. 

Seafarms (2016b), Project Sea Dragon – Core Breeding Centre and Broodstock Maturation Centre, Notice 

of Intent for Aquaculture Operations. Perth, Seafarms Group Ltd. 

Page 17: PROJECT SEA DRAGON PTY LTD CORE BREEDING CENTRE AND ...

Project Sea Dragon  

Core Breeding Centre and Broodstock Maturation Centre, Bynoe Harbour 

Draft Environmental Impact Statement  

PART C ‐ ENVIRONMENTAL MANAGEMENT   16‐298 

Smit, N., Billyard, R. and Ferns, L. (2000), Beagle Gulf Benthic Survey: Characterisation of soft substrates. 

Technical Report No. 66, Parks and Wildlife Commission of the Northern Territory. 

The Northern Territory of Australia (1982), Bore Report 021750 Final Statement of Bore. The Northern 

Territory of Australia, Darwin. 

The Northern Territory of Australia (1983), Bore Report 023176 Final Statement of Bore. The Northern 

Territory of Australia, Darwin. 

Tover, A., C. Moreno, M.P. Manuel‐Vez and M. Garcia‐Varga (2000), Environmental implications of 

intensive marine aquaculture in earthen ponds. Marine Ecology Progress Series 40: 981‐988. 

Trott , L.A. and Alongi,  D.M. (2000), The Impact of Shrimp Pond Effluent on Water Quality and Phytoplankt

on  Biomass in a Tropical Mangrove History. Marine Pollution Bulletin.  40(11): 947 –  951,   

UniQuest (2010) Shoreline Ecological Assessment Aerial and Ground Surveys 7‐19 November 2009. 

UniQuest Project No: 16248, 7 June 2010. Prepared for PTTEP Australasia 

United Nations, Department of Economic and Social Affairs, Population Division 2015, World Population 

Prospects: The 2015 Revision, Key Findings and Advance Tables. Working Paper No. ESA/P/WP.241. 

Van Houtan, K., Hargrove, S.K. Balaz, G.H. (2010), Land use, macroalgae, and a tumor‐forming disease in 

marine turtles. PLoS ONE. 5, e12900. 

Ward, S., Woinarski, J., Griffiths , T. and McKay, L. (2012), Threatened Species Information Sheet.  Yellow‐

Spotted Monitor Northern Sand Goanna Floodplain Monitor (Varanus panoptes). 

http://www.lrm.nt.gov.au/__data/assets/pdf_file/0019/10882/Varanus_panoptes_VU_FINAL.pdf 

Whitty, J.M., Morgan, D.L., Thorburn, D.C., Fazeldean, T. and Peverell, S.C. (2008), Tracking the movements 

of freshwater sawfish (Pristis microdon) and northern river sharks (Glyphis sp. C) in the Fitzroy River. In: 

J.M. Whitty, N.M. Phillips, D.L. Morgan, J.A. Chaplin, D.C. Thorburn and S.C. Peverell (eds). Habitat 

associations of freshwater sawfish (Pristis microdon) and northern river shark (Glyphis sp. C): including 

genetic analysis of P. microdon across northern Australia. Centre for Fish and Fisheries Research (Murdoch 

University) report to the Australian Government Department of the Environment, Water, Heritage and the 

Arts, Canberra. 

Woinarski, J. & Hill, B. (2012a), Threatened Species Information Sheet.  Brush‐Tailed Rabbit‐Rat (Conilurus 

penicillatus). Available from:  http://www.lrm.nt.gov.au/__data/assets/pdf_file/0015/10824/brush‐ 

tailed_rabbit‐rat_EN_FINAL.pdf 

Woinarski, J. & Hill, B. (2012b), Threatened Species Information Sheet.  Northern Quoll (Dasyurus 

hallucatus) Available from:  

http://www.lrm.nt.gov.au/__data/assets/pdf_file/0014/10814/northern_quoll_CR_FINAL.pdf 

Woodruff, J. D., Irish, J. L. & Camargo, S. J. (2013), Coastal flooding by tropical cyclones and sea‐level rise. 

Nature 504, 44–52.