Top Banner
Total Petrochemicals Deep Conversion Project Port Arthur, Texas $59,700,000 Contract Value Fluor 20 Month Duration 818,800 Workhours 182,667 LF of Piping –Spools 10,393 Pipe Welds -233,609 Dia. Weld Inches 1,286 Hydrostatic Test Packages Brownfield project Turner set up Contractor Safety Awareness program to include all site contractors 134 pipe rack modules 2,237 tons of field erected structural steel Zero Lost Time Accidents Project Quick Facts
1

Project Quick Facts - Turner · PDF file182,667 LF of Piping –Spools 10,393 Pipe Welds -233,609 Dia. Weld Inches 1,286 Hydrostatic Test Packages • Brownfield project

Feb 11, 2018

Download

Documents

trinhnhu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Quick Facts - Turner  · PDF file182,667 LF of Piping –Spools 10,393 Pipe Welds -233,609 Dia. Weld Inches 1,286 Hydrostatic Test Packages • Brownfield project

Total PetrochemicalsDeep Conversion Project Port Arthur, Texas$59,700,000 Contract Value

Fluor

20 Month Duration

818,800 Workhours

182,667 LF of Piping –Spools

10,393 Pipe Welds -233,609 Dia. Weld Inches

1,286 Hydrostatic Test Packages

• Brownfield project

• Turner set up Contractor Safety Awareness program to include all site contractors

• 134 pipe rack modules

• 2,237 tons of field erected structural steel

Zero Lost Time Accidents

Project Quick Facts