Total Petrochemicals Deep Conversion Project Port Arthur, Texas $59,700,000 Contract Value Fluor 20 Month Duration 818,800 Workhours 182,667 LF of Piping –Spools 10,393 Pipe Welds -233,609 Dia. Weld Inches 1,286 Hydrostatic Test Packages • Brownfield project • Turner set up Contractor Safety Awareness program to include all site contractors • 134 pipe rack modules • 2,237 tons of field erected structural steel Zero Lost Time Accidents Project Quick Facts