Page 1: Project Progress Ppt

D MONTE PARK SITE,BANDRA WEST.

DHEERAJ HOUSING PVT. LTD.

Page 2: Project Progress Ppt

RESIDENTIAL BUILDING

3 BASEMENTS+ STILT FLOOR+

PODIUM FLOOR+13 STORIES

PROJECT

Page 3: Project Progress Ppt
Page 4: Project Progress Ppt
Page 5: Project Progress Ppt
Page 6: Project Progress Ppt
Page 7: Project Progress Ppt

PROGRESS

Page 8: Project Progress Ppt

3 Double Height Basements completed ahead of schedule. (18,900 Sq. Ft.)

Podium with Swimming pool completed.

Transfer Slab at 5.2m height, 1.2m depth expected completion 7 days ahead of schedule.

Over all project: 30+ days ahead of schedule.

Page 9: Project Progress Ppt

WORK STATUS: SIX MONTHS AGO

Page 10: Project Progress Ppt

WORK STATUS: 6 MONTHS INTO THE PROJECT( 3 BASEMENTS+ PLINTH+

PODIUMS+ TRANSFER SLAB

Page 11: Project Progress Ppt
Page 12: Project Progress Ppt

Organization Chart

Mr. Nitin Agresar Sr. VP & Head Projects

Mr. Amesh Dharmale Sr. Project Manager

Mr. Shivram Desai Sr. Site Engr.

Mr. Sachin Mangutkar Storekeeper

Page 13: Project Progress Ppt

Execution DepartmentBackbone of the project

Responsibilities Assure timely completion of the project. Assure Best possible quality Assure safe and clean workplace

Support System: Design Department Stores Department Purchase Department Contracts Department MEP & Services

Page 14: Project Progress Ppt

QUALITY

Page 15: Project Progress Ppt
Page 16: Project Progress Ppt

TEMPRATURE METER

Page 17: Project Progress Ppt

HIGH SPEED MEN + MATERIAL 1.5 TON HOIST

Page 18: Project Progress Ppt

HOUSEKEEPING AND SAFETY

Page 19: Project Progress Ppt

HOUSEKEEPING AND SAFETY

Preparation of project specific HSE Plan ,HIRA Register for site

Induction Training to All workers & staff .

Sub contractor foreman refresher Training

Safety Committee & its meeting.

Safety Inspection of mechanical equipment

Power Tools & Hand tools safety.

Page 20: Project Progress Ppt

SAFETY EQUIPMENT

Following of SOPs Electrical safety – Provision

of Earthing, ELCB,Hot Work safety Inspection of Temporary

structures Peripheral & lift duct

barricadingFall Protection - Safety

net Provision.

Page 21: Project Progress Ppt
Page 22: Project Progress Ppt

Nomenclature of Structure

Page 23: Project Progress Ppt
Page 24: Project Progress Ppt

TECHNOLOGY

Page 25: Project Progress Ppt

Shuttering from World Class “RMD KWICKFORM” used for speed and quality

Best in class machinery from German Wacker Neuson ,Bosh & DeWault used for the project.

Page 26: Project Progress Ppt

Thank You

Page 27: Project Progress Ppt

DescriptionArea in SQFT Work Status

Plot Area 13944.96

Total Construction area

90000

Basement -3 3500 Completed

Basement-2 7500 Completed

Ground Floor 7500 Completed

Podium Floor 7500 Completed

Transfer Floor 5500 60% completed, balance work in Progress

Typical Floor 3600