PROJECT PLANNING & DETAILED PROJECT REPORT
39

PROJECT PLANNING DETAILED PROJECT REPORT

Jun 11, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PROJECT PLANNING DETAILED PROJECT REPORT

PROJECT

PLANNING

&

DETAILED

PROJECT REPORT

Page 2: PROJECT PLANNING DETAILED PROJECT REPORT

HELP DECIDE

POSTMAN POLICEMAN NOSTRADAMUS DOCTOR

ICU-SURGERY

PM allows you to

decide, post, police,

doctor, predict &

correct a project

Page 3: PROJECT PLANNING DETAILED PROJECT REPORT

• Process of defining the necessary tasks

to reach the objectives, making cost

estimates, preparing schedules &

budgets.

• Also involves assigning overall

segments of the plan to individuals, with

a minimum of overlap problems.

Page 4: PROJECT PLANNING DETAILED PROJECT REPORT

• PMP is the key document of the project -

used to control the project - Forms baseline

of Project

• Owned by Project Manager - Developed by

PM with project team

• Approved by Sponsor/Client - Should be

accepted by Sponsor & Project Team

• Guide the project’s execution

Page 5: PROJECT PLANNING DETAILED PROJECT REPORT

• Document assumptions made in planning

the project

• Doc planning decisions & alternatives

selected

• Facilitate comn amongst different

stakeholders

• Define key mgmt. reviews content, extent &

timing

• Provide baseline for progress measurement

& control

Page 6: PROJECT PLANNING DETAILED PROJECT REPORT

• Provides guidelines to team /mgmt. on

development phases & estimates related to

cost, schedule, resources etc.

• Provides reference regarding quality

expectations of projects output i.e. the

product of the project

Page 7: PROJECT PLANNING DETAILED PROJECT REPORT

Key contents:-

• Executive Summary

• Highlighting key aspects of project

• Benefits expected from project

• Project’s Success Criteria

• A full list of all deliverables ordered by time

with their responsible owners

• A Scope of project of Statement of Work

• Work Breakdown Structure & Product

Breakdown Structure

Page 8: PROJECT PLANNING DETAILED PROJECT REPORT

• The Time schedule of work with key

milestones

• Health & Safety & Environment plans

• Organisation Structure

• Responsibility Assignment Matrix

• Subsidiary Management plans eg: Scope,

Schedule, Cost, Quality, Risk, Procurement,

Communication, Staffing, Process

improvement etc.

Page 9: PROJECT PLANNING DETAILED PROJECT REPORT

Baselines:

• Scope Baseline

• Resource Calendar

• Schedule baseline

• Cost baseline

• Quality baseline

Other imp Documents:

• Risk Register

• Milestone lists

• Change Mgmt Plan

• Configuration Mgmt Plan

Page 10: PROJECT PLANNING DETAILED PROJECT REPORT
Page 11: PROJECT PLANNING DETAILED PROJECT REPORT

WORK BREAKDOWN

STRUCTURE

Page 12: PROJECT PLANNING DETAILED PROJECT REPORT
Page 13: PROJECT PLANNING DETAILED PROJECT REPORT

Systematic & logical breakdown.

Neither too many or too few levels.

Breakdown to manageable unit of work called Work Control Package(WCP).

For WCP responsibility can be assigned.

WCP can be costed and time assigned.

Unique number for identification.

Sum total of cost of all WCPs is cost of project.

Page 14: PROJECT PLANNING DETAILED PROJECT REPORT

WORK

CONTROL

PACKAGE

Scope Responsibility

Time Cost

Page 15: PROJECT PLANNING DETAILED PROJECT REPORT

1.0 Light Combat Aircraft

1.1.1 FUSELAGE 1.1.2 WINGS 1.1.3 TAIL 1.1.4 LANDING GEAR

1.1 STRUCTURE 1.2 PROPULSION

1.1.1.2 COCKPIT 1.1.1.1 COWLING 1.1.1.3 BODY

1.1.3.2 TRIM 1.1.3.1 FIXED

1.1.4.2 NOSE 1.1.4.1 MAIN 1.1.2.2 TRIM 1.1.2.1 FIXED

Page 16: PROJECT PLANNING DETAILED PROJECT REPORT
Page 17: PROJECT PLANNING DETAILED PROJECT REPORT

R Responsibility I Inform

C Consult A Approve

CE CWE GE AGE PMG

Site Layout - C A R I

Service Layout - C A R I

Approval of Material - - A R I

Quality Control - - A R -

Progress of Work I I A R I

Change of Specs A C R - I

Budget Allocation R C I I -

Measurement of Work - - A R -

Payment to Contractors - - A R -

Prep of Final Bills I I A R -

Checking of Final Bills A I R - -

Page 18: PROJECT PLANNING DETAILED PROJECT REPORT

Each row of TRM shows persons involved in one

Work Package and their responsibilities

Each column shows the Work Packages for which

a single individual is responsible and the

responsibility

Project personnel can easily identify their

responsibility

Enables monitoring of how effectively

responsibility is being executed

Page 19: PROJECT PLANNING DETAILED PROJECT REPORT
Page 20: PROJECT PLANNING DETAILED PROJECT REPORT
Page 21: PROJECT PLANNING DETAILED PROJECT REPORT
Page 22: PROJECT PLANNING DETAILED PROJECT REPORT

Item/Activity Units/Hrs

Rate

(thousands of

Rupees)

Sub Total

(Thousand

Rupees)

WBS Level 1

Total

(thousand

Rupees)

% of total project

WBS items

1. Project Management 700 42.84%

Project Manager 60 3 180

Project team members 240 2 480

Contractors(10% of Software development and

testing) 40

2. Hardware 600 37%

2.1 - Handheld Devices 8 40 320

2.2 - Servers 2 100 200

2.3- Network devices 80 80

3. Software 150 9%

3.1 Licenced Software 100

3.2 Modification and Development 50

4. Testing (10% of total Hardware& software Cost) 150 9%

5. Training and Support 34 2%

Trainer Cost 3 6 18

Travel Cost 6 2 12

Project Team Member 2 2 4

6. Reserves (15 % of Total estimate) 245.1 15%

Total Project Cost Estimate 1634

Page 23: PROJECT PLANNING DETAILED PROJECT REPORT
Page 24: PROJECT PLANNING DETAILED PROJECT REPORT
Page 25: PROJECT PLANNING DETAILED PROJECT REPORT
Page 26: PROJECT PLANNING DETAILED PROJECT REPORT
Page 27: PROJECT PLANNING DETAILED PROJECT REPORT
Page 28: PROJECT PLANNING DETAILED PROJECT REPORT
Page 29: PROJECT PLANNING DETAILED PROJECT REPORT
Page 30: PROJECT PLANNING DETAILED PROJECT REPORT

Project Plan in Executable Format

• Project Plan in Executable Format

Elaborate and Systemic adoption of Feasibility

report

• Elaborate and Systemic adoption of Feasibility report

A tool for implementation

• A tool for implementation

Involves in-depth planning and detailed examination

of all aspects

• Involves in-depth planning and detailed examination of all aspects

Preparation invariably the task of competent and

professional consultants

• Preparation invariably the task of competent and professional consultants

Page 31: PROJECT PLANNING DETAILED PROJECT REPORT

Project Summary

Justification, History & Related Works

Technical Plan - Nature of Project, Design Parameters, Production Plan

Reliability and Quality Assurance Provisions

Risk Analysis & Contingency Plans

Page 32: PROJECT PLANNING DETAILED PROJECT REPORT

Management Plan - Org, Responsibilities, Project Project Body, Relationship with external Orgns

Procurement and Logistics Plan

Schedules

Page 33: PROJECT PLANNING DETAILED PROJECT REPORT

Resources Requirements – Manpower, Facilities, Financial

Financial Plan

Systems Plan – Info Systems, Review & Checks, Control & Corrective Action

Environment, Safety & Health Protection Plan

Page 34: PROJECT PLANNING DETAILED PROJECT REPORT
Page 35: PROJECT PLANNING DETAILED PROJECT REPORT
Page 36: PROJECT PLANNING DETAILED PROJECT REPORT
Page 37: PROJECT PLANNING DETAILED PROJECT REPORT
Page 38: PROJECT PLANNING DETAILED PROJECT REPORT
Page 39: PROJECT PLANNING DETAILED PROJECT REPORT