Top Banner
Project Planning Author Software Engineering Institute Carnegie Mellon University 學學 : 學學學 學學 學學學 學學
35

Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Dec 31, 2015

Download

Documents

Paul Townsend
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Project Planning

Author : Software Engineering Institute Carnegie Mellon University

學生 : 吳與倫老師:李健興 教授

Page 2: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Purpose

The purpose of Project is to establishand maintain plans that define projectactivities.

Page 3: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Related Process Areas

• The product and product components.• Managing requirements needed for planning and r

e-planning.• Risk Management process area.• Transforming requirements into product and prod

uct component solutions.• Planning required for porject porgress and perfor

mance.• Planning needs for managing an acquisition.

Page 4: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific and Generic Goals

SG 1 Establish Estimates

SG 2 Develop Project Plan

SG 3 Obtain Commitment to the Plan

GG 2 Institutionalize a Managed Process

Page 5: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

SG 1 Establish Estimates

Establish of project planning parameters are established and maintained.

SP 1.1 Establish the Scope of Project Establish and maintain a top-level work breakdown structure(WBS) to establish of the scope of the project.

Page 6: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

SP 1.2 Establish Estimate of Project Attributes

Establish and document estimates of the

attributes of the work products and tasks.

For Software Engineering

Page 7: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

Typical Work Products

1. Technical approach

2. Size and complexity of tasks and work products

3. Estimating Models

4. Attribute estimates

Page 8: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

SP 1.3 Define project Life Cycle Define the project life-cycle phases upon

which to scope the planning effort.

Page 9: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

Typical Work Products

1. Project life-cycle phases

2. Products life-cycle phases

Page 10: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

SP 1.4 Determine Estimates of Effort and Cost

Estimate the project effort and cost for the

work products and tasks based on estimation

rationale.

Page 11: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

Typical Work Products

1. Projects schedules

2. Schedules dependencies

3. Project Budget

Page 12: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

SP 2.2 Identify Project Risks

Identify and analyze project risks.

Page 13: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

SP 2.3 Plan for Data Management

Plan for the management of project data.

Page 14: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

Typical Work Products1. Data management plan

2. Master list of managed data

3. Data content and format description

4. Data requirements lists for acquirers and for suppliers

5. Privacy requirements

6. Security requirements

7. Security procedures

8. Mechanism for data retrival,reproduction,and distribution

9. Schedule for collection of project data

10. Listing of project data to be collected

Page 15: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

SP 2.4 Plan for Porject Resources

Plan for necessary resources to perform the

project.

Page 16: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

Typical Work Products

1. WBS work packages

2. WBS task dictionary

3. Staffing requirements based on project size and scope

4. Critical facilities/equipment list

5. Process/workflow definitions and diagrams

6. Program administration requirements list

Page 17: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

SP 2.5 Plan for Needed Knowledge and Skills

Plan for knowledge and skills needed to

perform the project.

Page 18: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

SP 2.6 Plan Stakeholder Involvement

Plan the involvement with identified

stakeholders.

SP 2.7 Establish the Project Plan

Establish and maintain the overall project

plan content.

Page 19: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

SG 3 Obtain Commitment to the Plan

Commitments to the porject plan are

established maintained.

Page 20: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

SP 3.1 Review Subordinate Plans

Review subordinate plans to

understand project commitments.

Typical Work Products

1. Record of subordinate plan reviews

Page 21: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

SP 3.2 Reconcile the project plan to reflect available

and projected resources.

Page 22: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

Typical Work Products

Revised methods and corresponding estimating parameters(e.g.,better tools,use of off-the-shelf

componets)

Re-negotiated budgets

Revised schedules

Revised requirements list

Renegotiated stakeholder agreements

Page 23: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

Sp 3.3 Obtain Plan Commitment Obtain commitment from relevant stakeholders responsible foe performing and supporting plan execution.

Page 24: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

Typical Work Products

1. Documents requests for commitments

2. Documented commitments

Page 25: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Specific Practices by Goal

GG 2 Institutionalize a Managed Process

The process is institutionalized a managed

process.

Page 26: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Commitment to Perform

GP 2.1 (co1) Establish an Organizational Policy

Establish and maintain an organizational

policy for planning and performing the

project planning process.

Page 27: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Ability to Perform

GP2.2 (AB 1) Plan the Process

Establish and maintain the

requirements and objectives,and plans

for performing the project planning process.

Page 28: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Ability to Perform

GP2.3 (AB2) Provide Resources

Provide adquate resources for performing

the project planning process,developing the

work products and providing the services of

the process.

Page 29: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Ability to Perform

GP 2.4 (AB3) Assign Responsibility

Assign responsibility and authority for

performing the process,developing the work

products,and providing the services of the

project planning process.

Page 30: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Ability to Perform

GP 2.5 (AB4) Train People

Train the people performing or supporting

the project planning process as needed.

Page 31: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Directing Implementation

GP 2.6 (DI 1) Manage Configurations

Place designated work products of te project

planning process under appropriate levels pf

configuration management.

Page 32: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Directing Implementation

GP 2.7 (DI 2) Identify and Involve Relevant

Stakeholders

Identify and involve relevant stakeholders

of the project planning process as planned.

Page 33: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Directing Implementation

GP 2.8(DI 3) Monitor and Control the Process

Monitor and control the project planning

process against the and take appropriate

corrective action.

Page 34: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Verifying Implementation

GP 2.9 (VE1) Objectively Evaluate Adherence

Objectively evaluate adherence of the project

planning process and the work products and

services of the process to the applicable

requirements,objectives,and standards,and

address noncompliance.

Page 35: Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Verifying Implementation

GP 2.10 (VE 2) Review Status with Higher-Level

Management

Review the activities,status,and results of

the project planning process with higher-

level management and resolve issues.