Top Banner
National Park Service U.S. Department of the Interior Project Overview Reconstruction of Failing Section of El Portal Road East of the Big Oak Flat Intersection Big Oak Flat Road El Portal Road Merced River Pohono Bridge Failing Section Approximate Project Area
4

Project Overview - National Park Service€¦ · Project Overview Reconstruction of Failing Section of El Portal Road East of the Big Oak Flat Intersection Big Oak Flat Road El Portal

Aug 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Overview - National Park Service€¦ · Project Overview Reconstruction of Failing Section of El Portal Road East of the Big Oak Flat Intersection Big Oak Flat Road El Portal

National Park ServiceU.S. Department of the Interior

Project OverviewReconstruction of Failing Section of El Portal Road East of the Big Oak Flat Intersection

Big Oak Flat Road

El Portal Road

Merced River

Pohono Bridge

Failing Section

ApproximateProject Area

Page 2: Project Overview - National Park Service€¦ · Project Overview Reconstruction of Failing Section of El Portal Road East of the Big Oak Flat Intersection Big Oak Flat Road El Portal

National Park ServiceU.S. Department of the Interior

Failing Section

Big Oak Flat Road

El Portal Road

Merced River

Pohono Bridge

Failing Section

ApproximateProject Area

El Portal Road

Merced River

onoPohono Bridgeidge

Big OakFlat Road

Undercut Concrete Barrier at Failing Section

Three of four entrances access Yosemite Valley through this section

This failing section received temporary repairs in 2003

Reconstruction of Failing Section of El Portal Road East of the Big Oak Flat Intersection

Dry Stack Wall at Failing Section (Concrete Barrier)

Merced River

Failed Embankment Area

Embankment Under Cut

Dry Laid Embankment

Undercut at Failing Section

Page 3: Project Overview - National Park Service€¦ · Project Overview Reconstruction of Failing Section of El Portal Road East of the Big Oak Flat Intersection Big Oak Flat Road El Portal

National Park ServiceU.S. Department of the InteriorReconstruction of Failing Section of El Portal

Road East of the Big Oak Flat Intersection

Potential Solutions

Big Oak Flat Road

El Portal Road

Merced River

Pohono Bridge

Failing Section

ApproximateProject Area

Concept 1: River Edge of PavementThis concept holds the existing edge of pavement adjacent to the Merced River and constructs improvements to the north, cutting into the existing cut face.

Concept 2: Cut Wall Edge of PavementThis concept holds the existing edge of pavement adjacent to the existing cut face, and constructs improvements towards the Merced River.

Note: Graphics based on 11 foot travel lanes per Park Road Standards (1984)

Location A Location B

A B

Concept 1 Concept 1

Concept 2 Concept 2

Existing SlopeExisting Wall

Existing SlopeExisting Wall

Existing North Cut Face

Merced River

Existing North Cut Face

Merced River

Existing North Cut Face

Merced River

Existing North Cut Face

Merced River

Page 4: Project Overview - National Park Service€¦ · Project Overview Reconstruction of Failing Section of El Portal Road East of the Big Oak Flat Intersection Big Oak Flat Road El Portal

National Park ServiceU.S. Department of the InteriorReconstruction of Failing Section of El Portal

Road East of the Big Oak Flat Intersection

Potential Solutions

Big Oak Flat Road

El Portal Road

Merced River

Pohono Bridge

Failing Section

ApproximateProject Area

Location A Location B

Concept 3: Cantilever Wall This concept holds the existing edge of pavement adjacent to the existing cut face. The outside of the roadway is supported by a cantilever bridge section, supporting a portion of the roadway over the Merced River.

Concept 4: Base of Existing Slope/WallThis concept holds to the base of the existing slope or wall and minimizes cuts into the existing cut wall where possible.

Note: Graphics based on 11 foot travel lanes per Park Road Standards (1984)

A B

Concept 3 Concept 3

Concept 4 Concept 4

Existing SlopeExisting Wall

Temporary reinforcedexcavation limits to

build cantilever foundation.

Merced River

Existing North Cut Face

Possible excavation limits to retain 1-lane of traffic

Temporary Concrete Barrier

Existing North Cut Face

Merced River

Temporary reinforcedexcavation limits to

build cantilever foundation.

Existing Slope

Existing North Cut Face

Merced River

Existing Wall

Existing North Cut Face

Merced River