Project Office C-PMSE • Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG c-pmse.research-project.de • [email protected]A research project in co-operation of industry and science Publicly sponsored by C-PMSE – Improving frequency utilization and coexistence for PMSE systems by cognitive procedures
14
Embed
Project Office C-PMSE Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG c-pmse.research-project.de [email protected] A research project.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
A research project in co-operationof industry and science
Publicly sponsored by
C-PMSE – Improving frequency utilization and coexistence for PMSE systems
by cognitive procedures
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG
PMSE – Programme Making Special Event
01.08.2011, Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH
2
PMSE covers• Services Ancillary for Programme-Making (SAP)
• Services Ancillary for Broadcasting (SAB)
• Electronic News Gathering (ENG) and Outside Broadcasting (OB)
As defined in ERC Report 38 and ERC Report 42 (see also ITU-R Report BT.2069 and ECC Report 002) including wireless production tools used for front-end solutions (audio, video, data) in the field of professional multimedia production (from radio and television to art, culture, conferences, trade fairs, entertainment applications, education, sport events and much more).
Examples for PMSE Components:• Video cameras• Microphones • In-ear monitors • Conference systems• Intercom devices• Data links (e.g. for remote control)
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG
PWMS – Professional Wireless Mikrophone Systems
01.08.2011, Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH
3
PWMS is a part of PMSE and includes:All wireless equipment used at the front end of all professional audio productions, like: stage productions, public events, TV program production, installation in conference centres/rooms, city halls, musical and theatres, sport/event centres or other professional entities/ installations.
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG
PWMS-related Frequency Assignment below 1 GHz
01.08.2011, Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH
4
29,7 – 47 174 – 216 470 – 786 78
6 –
78
9
82
3 –
82
68
26
– 8
32
86
3 –
86
5
►UHFVHF ◄
Europe
Germany
0 MHz 1000 MHz
TV-Broadcasting (DVB-T)
470 – 862
PMR, ENG, SAB, SAP (470 – 790) SRD (863 – 865)
Wireless Microphones SAB/SAP
LTE
791 - 862
LTE duplex gap
SAB = Services Ancillary to Broadcasting SAP = Services Ancillary to Programme-makingENG = Electronic News GatheringPMR = Private Mobile RadioSRD = Short Range Devices
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG
Challenges
01.08.2011, Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH
7
Spectrum Scarcity (PMSE operates mainly in 470-862 MHz)• Digital Dividend in Germany: PMSE lost 72 MHz of spectrum, 790-862 MHz
• (Digital Dividend II: Under discussion for Public Safety Services)
• More Digital TV Transmission: DVB-T and DVB-T2 in parallel
• More Events, More Productions
• Higher Quality in Video and Audio
Coexistence of PMSE with• Analogue / Digital TV Transmission – with ATV since 50 years
• Cellular Mobil Services – since Digital Dividend, in Germany: April 2010
• Other PMSE
• Other Short Range Devices – New kinds of TV Band Devices (ECMA-392, IEEE 802.11af) ???
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG
C-PMSE Project Data Sheet
01.08.2011, Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH
8
Duration: 1.4.2011 – 31.5.2013 (26 months)
Budget: about 7.5 mil. € (about 4.5 mil. € gov. funding)
Partner:
Project Office: Robert Bosch (project lead)Sennheiser (consortium lead)
Publicly funded by German Ministry of Economics and Technology (BMWi)
Project Management Agency: German Aerospace center (DLR)
• beyerdynamic• eesy-ID • Huawei• RF mondial• Robert Bosch• Sennheiser
• Institut für Rundfunktechnik• University Nuremberg-Erlangen• University Bochum• University Hannover
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG
Objectives of C-PMSE Project
01.08.2011, Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH
9
R&D on the cognitive system and procedures for PMSE• Development of system components, like antennas, scan receiver, scan controller,
cognitive engine, data base and so on.• Measurement- and test procedures as well as channel-, interference- and co-existing
models as reference for the standardization and regulation activities
Field trial platform• Setting up a field trial platform for cognitive PMSE applications at the fair grounds of
Messe Berlin• Technical and economical proof of concept of the cognitive methods for PMSE• Realizing an open and modular R&D platform for future research
Frequency regulation and standardization• Setting up a forum to discuss and prioritize necessary actions concerning cognitive
PMSE on national, European and worldwide level• Active collaboration in meetings ITU, ETSI, CEPT und Bundesnetzagentur by using
the project results and the preparatory work of the Special Task Force ETSI STF 386
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG
Overview Work Packages
01.08.2011, Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH
10
WP7Research Platforms
WP7Research Platforms
WP2Analysis, Concepts & Specifications
WP2Analysis, Concepts & Specifications
WP1Project Management
WP1Project Management
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG
C-PMSE Project Phases
01.08.2011, Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH
11
C-PMSE Project
Preparation and Definition
6 months
Preevaluation and analyis Concepts and specificationWorkshop
System Development and Proof of Concept
16 months
Development of system components
System integration and proof of conceptSetting up of lab and field trial platforms and demonstration
Phase 1 Phase 2
Standardisation and Frequency Regulation Activities
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG
Basic structure of lab and field trial platforms
01.08.2011, Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH