10’ Shoulder 12’ Travel Lane 12’ Travel Lane 12’ Travel Lane 12’ Travel Lane 14’ Two-Way Left-Turn Lane 10’ Shoulder 10 10’ S S S S houlder 12 12’ Travel Lane 12 12’ Travel Lane 12 12’ Travel Lane 12 12’ Travel Lane 14 14’ Two-Way Left-Turn Lane 10 10’ Shoulde er r r r Project Information Sheet Project Map Typical Roadway Section Project Description: US 20 Section 2 in Elkhart County, near Middlebury, IN will soon be under construction to widen the roadway in order to improve safety and mobility along the corridor. The 2-mile corridor project will begin at County Road 35 and end at State Route 13. The purpose of this project is to improve corridor mobility, vehicular congestion and pedestrian safety. This project will also provide roadway and intersection improvements, new traffic signals to replace the existing signals, and curb and gutter throughout the corridor to handle stormwater runoff. This section of US 20 will provide 10-foot wide shoulders on both sides of the road that will accommodate horse and buggy traffic along the corridor. These improvements will greatly enhance safety while traveling within the corridor. Improved Signalized Intersection Proposed Detention Area New Sidewalk New Sidewalk Improved Pedestrian Crossing Begin Project Right-of-Way acquisition was reduced along entire corridor due to the use of curb and gutter. End Project Pumpkinvine Trail Tunnel Extension Proposed Cul-de-Sac Improved Signalized Intersection Improved Roadway Curve/Geometry ± 200 0 800 FEET INDOT Des. No. 1900095 Page 1