Top Banner
10’ Shoulder 12’ Travel Lane 12’ Travel Lane 12’ Travel Lane 12’ Travel Lane 14’ Two-Way Left-Turn Lane 10’ Shoulder 10 10’ S S S S houlder 12 12’ Travel Lane 12 12’ Travel Lane 12 12’ Travel Lane 12 12’ Travel Lane 14 14’ Two-Way Left-Turn Lane 10 10’ Shoulde er r r r Project Information Sheet Project Map Typical Roadway Section Project Description: US 20 Section 2 in Elkhart County, near Middlebury, IN will soon be under construction to widen the roadway in order to improve safety and mobility along the corridor. The 2-mile corridor project will begin at County Road 35 and end at State Route 13. The purpose of this project is to improve corridor mobility, vehicular congestion and pedestrian safety. This project will also provide roadway and intersection improvements, new traffic signals to replace the existing signals, and curb and gutter throughout the corridor to handle stormwater runoff. This section of US 20 will provide 10-foot wide shoulders on both sides of the road that will accommodate horse and buggy traffic along the corridor. These improvements will greatly enhance safety while traveling within the corridor. Improved Signalized Intersection Proposed Detention Area New Sidewalk New Sidewalk Improved Pedestrian Crossing Begin Project Right-of-Way acquisition was reduced along entire corridor due to the use of curb and gutter. End Project Pumpkinvine Trail Tunnel Extension Proposed Cul-de-Sac Improved Signalized Intersection Improved Roadway Curve/Geometry ± 200 0 800 FEET INDOT Des. No. 1900095 Page 1
2

Project Map - in.gov

Nov 08, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Map - in.gov

10’

Shoulder

12’

Travel Lane

12’

Travel Lane

12’

Travel Lane

12’

Travel Lane

14’

Two-Way

Left-Turn

Lane

10’

Shoulder

1010’

SSSSShoulder

1212’

Travel Lane

1212’

Travel Lane

1212’

Travel Lane

1212’

Travel Lane

1414’

Two-Way

Left-Turn

Lane

1010’

Shouldeerrrr

Project Information Sheet

Project Map

Typical Roadway Section

Project Description:

US 20 Section 2 in Elkhart County, near Middlebury, IN will soon be under construction to widen the roadway in order to improve safety and mobility along the corridor. The 2-mile corridor project will begin at County Road 35 and end at State Route 13.

The purpose of this project is to improve corridor mobility, vehicular congestion and pedestrian safety. This project will also provide roadway and intersection improvements, new traffi c signals to replace the existing signals, and curb and gutter throughout the corridor to handle stormwater runoff . This section of US 20 will provide 10-foot wide shoulders on both sides of the road that will accommodate horse and buggy traffi c along the corridor. These improvements will greatly enhance safety while traveling within the corridor.

Improved Signalized Intersection

Proposed Detention Area

New Sidewalk

New Sidewalk

Improved Pedestrian Crossing

Begin Project

Right-of-Way acquisition was reduced along entire

corridor due to the use of curb and gutter.

End Project Pumpkinvine Trail Tunnel Extension

Proposed Cul-de-Sac

Improved Signalized Intersection

Improved Roadway Curve/Geometry

±2000 800FEET

INDOT Des. No. 1900095 Page 1

Page 2: Project Map - in.gov

Construction

Land AcquisitionLand Acquisition

Environmental Study and Analysis

Winter 2023Spring 2023Utility RelocationUtility Relocation

Public Hearing Opportunity

Begin Construction

Spring 2021

Fall 2021Fall 2020

Spring 2023Spring 2022

Spring 2024

20242020 2021 2022 2023

Estimated TimelineEstimated Timeline

Project Highlight:

The project features a new pedestrian crossing in front of the Northridge High School to connect pedestrians from adjacent neighborhoods across US 20. New sidewalks will also be constructed on the north side of US 20 from Northridge High School to the US 20/CR 16 intersection, and on the south side of US 20 from Westlake Drive to Spring Valley Drive. In addition, new pavement markings and a special traffi c control device, commonly referred to as a HAWK signal, will be installed at the pedestrian crossing at Northridge High School. HAWK, which is an acronym that stands for High intensity Activated crossWalK, is a combination of a beacon fl asher and a traffi c control signaling device. The purpose of the HAWK signal is to both warn and control traffi c at an un-signalized location to assist pedestrians in crossing a street or highway at a marked crosswalk.