Team P14029: McKibben Muscle Robotic Fish. Project Manager: Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver Wrisley Controls and Instrumentation Lead : Felix Liu. Agenda. Project Background Problem Statement Deliverables Updates to Engineering Reqs - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

Project Manager: Zachary Novak

Mechanical Design Lead: John Chiu

Lead Engineer: Seaver Wrisley

Controls and Instrumentation Lead: Felix Liu

Team P14029: McKibben Muscle Robotic Fish

Page 2: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

AGENDA• Project Background

• Problem Statement• Deliverables• Updates to Engineering Reqs• Feedback from Last Review

• Concept Breakdown

• Internal System Diagram• Subsystem Identification• Critical Subsystem Identification

• Orientation Control Feasibility

• Buoyancy Calculations• Design Concept

• Power System Feasibility

• Power Flow Analysis• Power Source Selection• Battery Life Analysis

• Propulsion System Feasibility

• Pressure Drag Calculations• McKibben Muscle Test Results

• Control System Feasibility

• Electronics Schematic• Logic Flow Chart• Microprocessor Options/Selection• Solenoid Options/Selection• Solenoid Control Circuit Schematic• Kinematic Analysis

• Preliminary Subassembly Design

• CAD• Materials

• Updated Budget Assessment

• Updated Risk Assessment

• Detailed Design Schedule

Page 3: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

PROJECT BACKGROUND

Page 4: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

PROBLEM STATEMENT

This project is designed to prove the feasibility of McKibben muscles for use in underwater robotic applications, and to develop core technology and a platform for other teams to use in the future.

The project specifically seeks to develop a soft-bodied pneumatic fish that looks, moves, and feels like a fish. The robotic fish should be capable of swimming forward, backward, and turning, most likely using Body Caudal Fin propulsion, and the primary mechanism for generating the swimming motion must be McKibben muscles.

Page 5: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

DELIVERABLES

• A functional prototype which meets all customer requirements, and that may be used as a platform to be expanded upon by future MSD teams

• Detailed documentation covering project design, testing, and fabrication

• Appropriate test data ensuring all customer needs are met

• Detailed user manuals for operation and troubleshooting

• Suggestions for future expansion

Page 6: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

ENGINEERING REQUIREMENTS

Selected engineering specifications

• Maximum turning radius: Two body lengths

• Maximum height: 3 feet

• Operation time: .25 hour

• Corrosion spec: ASTM B-117

• Safety

• Maximum voltage present: 24V DC• Maximum allowable pressure: 70psi• Maximum pinching force in joints: 10lbs

• Body and fin motions: 30% tolerance to published values (next slide)

Page 7: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

QUESTIONS FROM LAST REVIEW

• Buoyancy Calculations

• How do known components affect the buoyancy? Will we be able to offset this to achieve our neutral buoyancy desired?

• Power Analysis

• How much power is needed to run the components and how does that translate into expected operating time?

• Spatial Analysis

• How will all the components fit? How big will the robot be?• Muscle Testing

• In the operating range of the centrifugal pump, will the muscles be able to produce enough force/displacement to make the fish “swim”?

Page 8: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

CONCEPT BREAKDOWN

Page 9: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

INTERNAL SYSTEM DIAGRAM

Page 10: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

SUBSYSTEM IDENTIFICATION

• Skin

• Body Structure

• Frame/Supports• Locomotion System

• Linkages• Muscles

• Actuation System

• Pump• Solenoids• Manifold• Plumbing

• Control System

• Microcontroller• Voltage Regulation• Programming• Wiring

• Orientation System

• Air Bladders• Power System

• Battery• Wiring• Waterproofing

Page 11: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

CRITICAL SUBSYSTEM DETERMINATION GUIDELINES

• Highest Technical Risk

• Most Challenging Technically

• Most Important Engineering Requirements

• Most Important System Level Behavior

Page 12: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

CRITICAL SUBSYSTEM DETERMINATIONS

• Actuation System

• Locomotion System

• Control System

• Power System

Honorable Mention: Orientation Control System

“Propulsion System”

Page 13: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

ORIENTATION CONTROL SYSTEM FEASIBILITY

Page 14: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

BUOYANCY CALCULATIONS

Page 15: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

• Inflatable Air Bladders

• Side Mounted (Trim Tanks)

• Will allow Roll Control• Front and Rear Bladders

• Will allow Pitch Control• Passive System

• Manually inflate• Fine tune for neutral

buoyancy before run• Butyl/Schrader Valve

• Capacity (4 total)

• 20-25 cubic inches each• Easily fit design footprint• Feasible

DESIGN IDEA

Page 16: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

POWER SYSTEM FEASIBILITY ANALYSIS

Page 17: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

POWER FLOW CHART

Page 18: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

POWER CONSUMPTION (MAIN COMPONENTS)

Thanks Thermoelectric team!

Page 19: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

SUMMARY

• Found that Lithium polymer batteries were the best combination of power, weight, and cost.

• Does require the use of a “smart charger” for safe charging.

• Presents additional risk item: Battery catching on fire, happens during charging if done incorrectly.

• Action to mitigate risk: Design fish such that battery can be removed for charging.

Battery type Ext. Price Volts mAhr Weight (lb)Lithium polymer (LiPo) $51.98 25.9 4000 1.41Lithium polymer (LiPo) $64.58 25.9 5000 1.8Lithium ion $112.48 25.9 4400 1.97Lithium ferrophosphate (LFP) $121.20 25.6 3600 3

Page 20: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

DECISION/LIFETIME ANALYSIS

• Class: Lithium Polymer (LiPo)

• Specs: 25.9V, 4 Amp-Hour (4000mAh)

• Weight: 1.41 pounds

• Cost: $52

Component Voltage Quantity Watts

BLDC 50E series pump* 24 1 3.6 86.4

Solenoid valves (only half at once) 24 2 0.104 2.5

Microcontroller TBD 1 Negligible Negligible

Total: 3.70 88.90

*assuming worst case of maximum flow

Battery Voltage (V) 25.9

Battery Capacity (Ah) 4

Battery Capacity (Wh) 103.6

Expected Battery Life (Hours) 1.17

The customer requirement for power is only 15 minutes. It is important to have long enough

battery life to make testing proceed quickly, but there is

room to cut back here

Expected Battery Life Analysis

Page 21: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

PROPULSION SYSTEM FEASIBILITY ANALYSIS

Page 22: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

HOW MUCH FORCE IS REQUIRED?

Pressure and friction drag forces act to slow the fish down

The muscles, in order to move the fins, must overcome:

• Pressure drag of the fin due to rotation

• Pressure drag on the fin due to apparent incoming fluid velocity

• Reactions from the other fins• Friction drag slows the fish, but is

NEGLIGIBLE as far as muscle force is concerned

Page 23: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

PRELIMINARY DRAG CALCULATIONS

Page 24: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

FREE BODY DIAGRAMS

Page 25: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

• The pressure drag force is dependent on the perpendicular velocity squared.

• The torque is found by integrating the drag force times distance along the fin section.

DRAG CALCS (CONTINUED)

Page 26: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

DRAG CALCS (CONTINUED)

Page 27: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

DRAG CALCS (CONTINUED)

Page 28: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

MUSCLE TESTING

Test Rig Components:

• LabVIEW Interface

• Load Cell

• Air Compressor

Data Gathered

• Force vs. Pressure

• Deflection vs. Pressure

• To get Strain (%)

Page 29: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

1ST ROUND OF TESTING - LESSONS

Dead zone due to space between tubing and fabric mesh. 30 psi was the pressure required to take up the initial slack between the tubing and mesh.

Slope inversely related to rubber stiffness, and directly related to the ratio of inner circumference over wall thickness

Page 30: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

2ND ROUND OF TESTING

• Assembled new muscles with existing tubing and fabric mesh.

• Used tubing with high inner circumference to thickness ratio (it was thinner).

• Made sure there was no space between tubing and mesh.

• Tested the effect of using a slightly smaller mesh than needed, on the same tubing.

Page 31: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

2ND TESTING SESSION RESULTS

• Tighter mesh nearly eliminated the dead zone

• Obtained a force of approximately 4 pounds at 20psi

Page 32: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

2ND TESTING SESSION RESULTS

• No significant difference seen between mesh types as long as they are tight to the tubing, ~13% contraction @ 20psi

Page 33: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

FORCE FEASIBILITY

• Force required due to overcome pressure drag with a muscle lever arm of 4cm (1.57”): 1.83 pounds

• Force produced by first set of muscles: 4 pounds

• Reaction forces from other fin sections are significant, but also actuate out-of-phase. Are ultimately due to the drag as well, so should be on the same order.

• Clearly within feasibility, using a muscle assembled from a limited selection of scrap materials.

Page 34: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

STRAIN FEASIBILITY• Strain level of 13% at 20psi found during testing.

• A lever arm of 4cm, and maximum angle of 30 degrees requires a 30.8cm (12.2”) muscle

• Has to actuate the section 30 degrees, as well as accommodate 30 degrees of motion in the other direction

• Larger muscles can be used, making it possible to lower the lever arm length, decreasing the required muscle length.

Page 35: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

CONTROL SYSTEM FEASIBILITY ANALYSIS

Page 36: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

ELECTRICAL CONTROL SCHEMATIC

Page 37: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

LOGIC DIAGRAM

Page 38: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

MICROCONTROLLER OPTIONS

Page 39: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

SELECTION: ARDUINO MEGA 2560

PROS

• Vast amount of resources available• 54 Channel for future expansion capability• 8 KB SRAM • Ease of coding and debugging• Shields compatibility• Used by Roboant team

CONS

• More expensive ($50)

Page 40: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

SOLENOID VALVE OPTIONS

Key requirements:

• Inexpensive

• Compatible manifolds

• Ease of system integration (electrical connections)

• Reliability

• Additional considerations: Prior experience (reputation)

Page 41: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

SOLENOID SELECTION: PUGH ANALYSISClippard Parker Omega NITRA Pneumadyne

Power consumption + - + sCost - - - -Manifold options - - s -Wiring options - - s sPrior experience - - - -Size - - s s

Totals: + 1 0 1 0s 0 0 0 0- 5 6 2 3

DATU

M

• Clippard valves were selected as the best option

• Superior for all critical aspects except for power consumption

Page 42: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

SELECTION: CLIPPARD 15MM 3-WAY VALVES• 12V and 24V choices

• Moderate but acceptable power consumption

• Several manifold options

• Variety of wiring options

• Least expensive, total cost around $160

• Used in previous air muscle projects at RIT, such as muscle test stand

• Professor John Wellin has been using them for several years controlling flow of water

* There are some similar valves in the lab currently that we will can use for testing purposes. If they end up working well enough we may not need to purchase these at all.

Page 43: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

SOLENOID CONTROL CIRCUIT

Page 44: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

FISH MOTION ANALYSIS

Forward Tuning Parameters Value

l1 [in] 12l2 [in] 6l3 [in] 3l4 [in] 3

Theta_1 [deg] 30Theta_2 [deg] 45Theta_3 [deg] 75Theta_4 [deg] 10

Theta_2 Phase Delay [Rad] 3.5Theta_3 Phase Delay [Rad] 3.5

Angular Frequency [Rad/Sec] 6.28

Turning Tuning Parameters Valuel1 [in] 12l2 [in] 6l3 [in] 3l4 [in] 3

Theta_1 [deg] 20Theta_2 [deg] 20Theta_3 [deg] 20Theta_4 [deg] 10

Theta_2 Phase Delay [Rad] 0Theta_3 Phase Delay [Rad] 0

Angular Frequency [Rad/Sec] 6.28

Page 45: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

PRELIMINARY SUBASSEMBLY DESIGN

36in

13.5in

Side View

Page 46: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

ISOMETRIC VIEW

Page 47: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

PRELIMINARY SUBASSEMBLY DESIGN

Front View

Page 48: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

PRELIMINARY SUBASSEMBLY DESIGNTop View

Air Muscles

Air Bladders

Sealed Compartment

Pump

Tail Segments

Page 49: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

PRELIMINARY SUBASSEMBLY DESIGN

Sealed Compartment

Battery

Arduino Microcontroller

Solenoid Block

Foam or other structure

Page 50: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

PRELIMINARY SUBASSEMBLY DESIGN

Materials

- Outer skin and fish structure- Wire mesh for contoured outer shell- Larger gauge wire to support the wired mesh- Skin can be made of molded silicone, waterproof fabric, etc.

- Sealed Compartment- Made from acrylic/plexiglass walls for visibility of internals- The walls will be sealed with waterproofing silicone filler along the

seams.- Tail Segments

- ABS plastic or HDPE (high density polyethylene)

Page 51: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

UPDATED BUDGET PROJECTION

• This leaves ~$200 for:

• Body/Skin Structures• McKibben Muscles• Linkages

• Plumbing• Wiring• Air Bladders

Page 52: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

RISK ASSESSMENT SCALE

1This cause is unlikely to happen

1

The impact on the project is very minor. We will still meet needs on time within budget, but it will cause extra work

2

This cause could conceivably happen

2

The impact on the project is noticeable. We will deliver reduced functionality, go over budget or fail to meet some of our Engineering Specifications

3This cause is very likely to happen

3

The impact on the project is severe. We will not be able to deliver anything, or what we deliver will not meet the customer's needs

Severity ScaleLikelihood Scale

Page 53: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

RISK ASSESSMENT UPDATES

Page 54: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

SCHEDULE: NEXT GATE

Page 55: Project Manager:  Zachary Novak Mechanical Design Lead : John Chiu Lead Engineer : Seaver  Wrisley

QUESTIONS?CONCERNS?FEEDBACK?