Top Banner
P r o j e c t M a n a g e m e n t @ U F Practical management of projects Randy Graff, PhD
28

Project Management @ UF Practical management of projects Randy Graff, PhD.

Dec 30, 2015

Download

Documents

Ann Eaton
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Management @ UF Practical management of projects Randy Graff, PhD.

Project Managem

ent @ U

F

Practical management of projects Randy Graff, PhD

Page 2: Project Management @ UF Practical management of projects Randy Graff, PhD.

Goals• Basic understanding of a Project• Experience planning tools

Objectives• Terms• Example

• Brainstorm tasks• Share documents and tasks• Enter WBS and Resources

Page 3: Project Management @ UF Practical management of projects Randy Graff, PhD.

Formal Project Management• Introduction• Framework• Charter• Workload• Estimating• Scheduling• Timeline• Risk Management• Resources• Implementation• Tracking• Reporting• Life Cycle• Closure

• Tools– MS Project– MS Outlook

• Email• Tasks• Calendar

Day 1 Day 2 Day 3 Day 4

Page 4: Project Management @ UF Practical management of projects Randy Graff, PhD.

Practical Project Management

Scope Document

Work Breakdown Schedule

Gantt Chart

ResourcesImplementation

Tracking

Reporting

Hour 1

Page 5: Project Management @ UF Practical management of projects Randy Graff, PhD.

Planning and Management

MS Project

Collaborative Work Space

Brainstorm Tools

Tools

Hour 2

Page 6: Project Management @ UF Practical management of projects Randy Graff, PhD.

Scope Document

Very well defined “What”

Page 7: Project Management @ UF Practical management of projects Randy Graff, PhD.

Scope DocumentIntroduction and Background

Description

Objectives

Measures of Success

Impact (customers, operations, systems)

Costs

Constraints

Team

Page 8: Project Management @ UF Practical management of projects Randy Graff, PhD.

Work Breakdown Schedule

• Tasks• Duration• Grouping• Order

Task1 Hour1 Day1 Week1 Month

Task

1 Hour1 Day1 Week1 Month

Task

1 Hour1 Day1 Week1 Month

Task

1 Hour1 Day1 Week1 Month

Task

1 Hour1 Day1 Week1 Month

Task

1 Hour1 Day1 Week1 Month

Group

Group

1

2

3

4

5

Page 9: Project Management @ UF Practical management of projects Randy Graff, PhD.

Gantt Chart

• Visual of tasks and resourcesID Task Nam e Start

4 CANOES- TDC grant $ available Thu 9/18/085 GALLERIA- Expend Soltis NSF $ (or extend 1 yr) Tue 6/30/096 CANOES/GAL- Bid process, contract award Mon 7/20/097 CANOES/GAL- Expend all state match funds Fri 5/28/108 CANOES/GAL -- Fabrication Wed 7/1/099 CANOES/GAL- Outsourced const.dwgs&Fabrication Mon 9/14/0910 CANOES/GAL- In-house fabrication Wed 7/1/0911 CANOES/GAL- Object mounts Tue 6/1/1012 CANOES/GAL- Install (outsource components) Mon 5/3/1013 CANOES/GAL- Install Contingency Mon 5/24/1014 CANOES Tue 1/1/0815 CANOES -- Content Development Tue 1/1/0816 CANOES/GALLERIA- Prelim content develop Tue 1/1/0817 CANOES- Final script Mon 9/29/0818 CANOES- Graphics Wed 10/8/0819 CANOES- Objects Fri 8/1/0820 CANOES- Preliminary Object list Fri 8/1/0821 CANOES- Final Object List Mon 3/2/0922 CANOES- Finalizing Object Loans Fri 8/1/0823 CANOES- Initial Condition Reports (exhibit) Fri 8/1/0825 CANOES- Final Condition Reports Mon 5/3/1026 CANOES- Spanish translation Wed 7/1/0927 CANOES- Educators' Guide Mon 5/4/0928 CANOES- Programming Ideas due Mon 3/1/1029 CANOES -- Design Tue 4/1/0830 CANOES- Concept/Schematic Design Tue 4/1/0831 CANOES- Design Concept Tue 7/1/0832 CANOES- Schematic/Specs Mon 6/1/0933 CANOES- Bid Package Wed 7/1/0934 CANOES -- Media Mon 11/3/08

Darcie,Purchasing,Pam

Darcie,Ian,Purchasing

Darcie

contractors

in-house team

TBD

contractors,staff

Darcie,Donna Haritha

Darcie,Donna,Haritha

Darcie,Donna,Haritha

Outsource -- Carlos Plaza

Jay F,Ian

Ian,Prov idence

Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q22006 2007 2008 2009 2010 2011 2012 2013Tasks Duration

Group

Page 10: Project Management @ UF Practical management of projects Randy Graff, PhD.

Resources• People• Things• Schedules• Cost

Implementation• Signed approvals– Project– Time commitments– Funding– Equipment

• Getting started– You– Others

Page 11: Project Management @ UF Practical management of projects Randy Graff, PhD.

Tracking

Being aware of everything Nagging Communicating Updating Gantt

and WBS

Regular progress Milestones Problems Completion

and closure

Reporting

Page 12: Project Management @ UF Practical management of projects Randy Graff, PhD.

Getting Started

MS Project

Collaborative Work Space

Brainstorm Tools

Tools

• http://bubbl.us/ • www.inspiration.com• http://www.mindjet.com/

Page 13: Project Management @ UF Practical management of projects Randy Graff, PhD.

Collaborative Workspace

• http://pbworks.com• http://www.activecollab.com• http://docs.google.com• http://lss.at.ufl.edu

– http://sakaiproject.org

Page 14: Project Management @ UF Practical management of projects Randy Graff, PhD.

Google docsPB Works

Active Colab

Page 15: Project Management @ UF Practical management of projects Randy Graff, PhD.

Agenda

Brief Overview

Project Components

Glimpse of Project

Task

Recurring Task

Report

Backup

Page 16: Project Management @ UF Practical management of projects Randy Graff, PhD.

Brief Overview

Project•Group of linked tasks•Particular sequence•Predefined resources

Manage a project Schedule

Views and reports

Page 17: Project Management @ UF Practical management of projects Randy Graff, PhD.

Project Components

• Toolbars• Properties

Window• Tasks• Linking• Milestones

• Lag and lead time

• Resources• Printing• Saving• Backing up

Page 18: Project Management @ UF Practical management of projects Randy Graff, PhD.

ID Task Name Duration

1 Project meetings 96 days

22 Test standards 9 days

23 Develop test plan 3 hrs

24 Conduct test 5 days

25 Evaluate results and modify as needed 1 day

26 Update project plan 3 hrs

27 Review with stakeholders 2 hrs

28 Phase end 0 days

29 Implementation 19 days

30 Develop implementation plan 6 hrs

31 Develop training plan 5 days

32 Execute training plan 2 wks

33 Implement 1 wk

34 Review with stakeholders 2 hrs

35 Phase end 0 days

Tom,Jane,Erin

Tom,Erin

Project Team

Project Team

Tom,Jane,Erin

3/27

Jane

Erin

Erin

Erin,Jane

Jane,Erin,Project Team

4/10

Mar 2, '03 Mar 9, '03 Mar 16, '03 Mar 23, '03 Mar 30, '03 Apr 6, '03 Apr 13, '03 Apr 20, '03 Apr 27, '03

Final Product: Gantt Chart

Page 19: Project Management @ UF Practical management of projects Randy Graff, PhD.

ID Task Name Duration

1 Project meetings 96 days

22 Test standards 9 days

23 Develop test plan 3 hrs

24 Conduct test 5 days

25 Evaluate results and modify as needed 1 day

26 Update project plan 3 hrs

27 Review with stakeholders 2 hrs

28 Phase end 0 days

29 Implementation 19 days

30 Develop implementation plan 6 hrs

31 Develop training plan 5 days

32 Execute training plan 2 wks

33 Implement 1 wk

34 Review with stakeholders 2 hrs

35 Phase end 0 days

Tom,Jane,Erin

Tom,Erin

Project Team

Project Team

Tom,Jane,Erin

3/27

Jane

Erin

Erin

Erin,Jane

Jane,Erin,Project Team

4/10

Mar 2, '03 Mar 9, '03 Mar 16, '03 Mar 23, '03 Mar 30, '03 Apr 6, '03 Apr 13, '03 Apr 20, '03 Apr 27, '03

ID Task Name Duration

1 Project meetings 96 days

22 Test standards 9 days

23 Develop test plan 3 hrs

24 Conduct test 5 days

25 Evaluate results and modify as needed 1 day

26 Update project plan 3 hrs

27 Review with stakeholders 2 hrs

28 Phase end 0 days

29 Implementation 19 days

30 Develop implementation plan 6 hrs

31 Develop training plan 5 days

32 Execute training plan 2 wks

33 Implement 1 wk

34 Review with stakeholders 2 hrs

35 Phase end 0 days

Tom,Jane,Erin

Tom,Erin

Project Team

Project Team

Tom,Jane,Erin

3/27

Jane

Erin

Erin

Erin,Jane

Jane,Erin,Project Team

4/10

Mar 2, '03 Mar 9, '03 Mar 16, '03 Mar 23, '03 Mar 30, '03 Apr 6, '03 Apr 13, '03 Apr 20, '03 Apr 27, '03

Task SideTask Side

Page 20: Project Management @ UF Practical management of projects Randy Graff, PhD.

ID Task Name Duration

1 Project meetings 96 days

22 Test standards 9 days

23 Develop test plan 3 hrs

24 Conduct test 5 days

25 Evaluate results and modify as needed 1 day

26 Update project plan 3 hrs

27 Review with stakeholders 2 hrs

28 Phase end 0 days

29 Implementation 19 days

30 Develop implementation plan 6 hrs

31 Develop training plan 5 days

32 Execute training plan 2 wks

33 Implement 1 wk

34 Review with stakeholders 2 hrs

35 Phase end 0 days

Tom,Jane,Erin

Tom,Erin

Project Team

Project Team

Tom,Jane,Erin

3/27

Jane

Erin

Erin

Erin,Jane

Jane,Erin,Project Team

4/10

Mar 2, '03 Mar 9, '03 Mar 16, '03 Mar 23, '03 Mar 30, '03 Apr 6, '03 Apr 13, '03 Apr 20, '03 Apr 27, '03

ID Task Name Duration

1 Project meetings 96 days

22 Test standards 9 days

23 Develop test plan 3 hrs

24 Conduct test 5 days

25 Evaluate results and modify as needed 1 day

26 Update project plan 3 hrs

27 Review with stakeholders 2 hrs

28 Phase end 0 days

29 Implementation 19 days

30 Develop implementation plan 6 hrs

31 Develop training plan 5 days

32 Execute training plan 2 wks

33 Implement 1 wk

34 Review with stakeholders 2 hrs

35 Phase end 0 days

Tom,Jane,Erin

Tom,Erin

Project Team

Project Team

Tom,Jane,Erin

3/27

Jane

Erin

Erin

Erin,Jane

Jane,Erin,Project Team

4/10

Mar 2, '03 Mar 9, '03 Mar 16, '03 Mar 23, '03 Mar 30, '03 Apr 6, '03 Apr 13, '03 Apr 20, '03 Apr 27, '03

Gantt Side

Page 21: Project Management @ UF Practical management of projects Randy Graff, PhD.

Tasks Entered

Page 22: Project Management @ UF Practical management of projects Randy Graff, PhD.

Alternate Task Input/Edit

Page 23: Project Management @ UF Practical management of projects Randy Graff, PhD.

Enter Recurring Tasks

Page 24: Project Management @ UF Practical management of projects Randy Graff, PhD.

Recurring Tasks Entered

Page 25: Project Management @ UF Practical management of projects Randy Graff, PhD.

Viewing and Printing Reports

Page 26: Project Management @ UF Practical management of projects Randy Graff, PhD.

Backup

Page 27: Project Management @ UF Practical management of projects Randy Graff, PhD.

Backup

Page 28: Project Management @ UF Practical management of projects Randy Graff, PhD.

MS Project Review• Task• Recurring Task• Report• Backup

Review• Terms• Example

• Brainstorm tasks• Enter WBS and Resources• Share documents and tasks