PROJECT MANAGEMENT REPORT(MGT 60403/ ARC 3612/ ARC 3614)
NAME:ADIBAHBAHIAHAWANG
ID:0316318
TUTOR:MSALIAAHAMAD
DATE:JULY2017
Marksfor3component :1.______/10 2.______/10 3.______/10
TOTAL : ______/30
PROJECT : PROPOSED URBAN FARMING CENTER, ON PASAR SENI PARKING LOT,JALAN HANG KASTURI, KUALA LUMPUR.
Page 2
0 0 C O N T E N T
01INTRODUCTION1.1PROJECTINTRODUCTION
1.2CLIENT
02PROPOSEDPROGRAMME2.1URBANFARMINGCENTER
2.2OBJECTIVE
03SITEINTRODUCTION3.1INTRODUCTION
3.2SWOTANALYSIS
3.3PESTLEANALYSIS
04PROGRAMMEVIABILITY4.1PROGRAMOBJECTIVE
4.2PROGRAMGOALS
4.3SUCCESSCRITERIA
4.4STAKEHOLDERS
05DESIGNSTRATEGY5.1KEYFEATURES
5.2SPATIALPROGRAMMING
06MAINTENANCESTRATEGY
07RISKANALYSIS
08WORKBREAKDOWNSTRUCTURE
09GANTTCHART
Page 3
0 1 I N T R O D U C T I O N
The design brief calls for a proposal of an Urban Farming Center,along Jalan Tun Tan Cheng Lock, in Kuala Lumpur. The site is located
right next to Central Market- hence the aim of the design is to build
an extension of the building, which was originally a wet market, in
hopes of reactivating the space by pulling in local communities to
run the center. The project also aims to reshape the city, in hopes of
reducing the heat island effect, as well as changing lives by
introducing small scale farms to reduce carbon footprint and change
the unsustainable lifestyle of the local people. It will also apply the
hydroponic planting system, which utilizes water from the river and
discharges clean water back into it. The main program of the
building should consist of urban farms and a marketspace that
distributes its produce to the community. Supplementary programs
include a farm to table themed restaurant, as well as offices and a
workshop for visitors.
Basicrequirementsfromtheclient;
• Opennessandtransparency,toallowtheactivitieswithinthe
buildingtoreachouttothepublic
• VisualpermeabilityandwalkabilitytoCentralMarketnot
disrupted.
• Lightweightstructure,andopenplanconcept
• Smoothaccessibilityandcirculationbetweenfarmsand
distributioncenters
• Replaceexistingplazafromthesitetoallowpublicactivitiesto
takeplace.
• ConnectivitytotheKlang River
• 20-30parkingspacesforvisitors
1 . 1 P R O J E C T I N T R O D U C T I O N 1 . 2 C L I E N T
The Kha Seng Group Sdn Bhd is a privately owned conglomerate of
companies that has acquired a few notable properties in the area of Kuala
Lumpur. They began venturing into property development when they first
acquired the Central Market building in 2004 – which completely
transformed the fate of the world heritage site. The biggest impact of the
acquisition is the transformation of the building into a world renowned
tourist attraction and shopping destination, without compromising the
original purpose of the building, which was to hold the nations art, culture
and heritage.
Page 4
0 2 P R O P O S E D P R O G R A M M E
The over commercialization and development of the area results in
the loss of sense of space. The over-reliance on tourism therefore
makes it almost irrelevant to the local people. What was once a
market that served the people are now not even being used by the
local community. The lack of greenery in the area also creates an
issue of comfort and walkability. The loss of sense of space also
stems from the decreasing number of locals in the city. The absence
of the local community results to the lack of attachment to the city,
therefore creating more of a visitor center, rather than a livable
city.
The idea is to bring in farms into the city in order to create a more
self sustaining/liveable city. It acts as a center for the production
and distribution of local fruits and vegetables, and an education
platform for the future generation.
The introduction of urban farming into the city also creates a sense
of awareness in sustaining the environment. The major role of the
center is to also educate visitors, locals, tourists and especially
children the importance of leading a sustainable lifestyle in order to
ensure the future of the city.
2 . 1 U R B A N F A R M I N G C E N T E R 2 . 2 O B J E C T I V E
• TorevamptheareaofCentralMarketandreinstill thesenseof
belonginginthearea.
• ToexpandtheroleofCentralMarketbyintroducingnewprograms
whichisbothinteractiveandeducationaltoattractpeopletothearea.
• Toprovideapublicspacethatfurtherencouragesinteractionbetween
communities.
• TotransformCentralMarketintoaonestopcenterthatmeetsthe
peoplesneeds.
Page 5
0 3 S I T E I N T R O D U C T I O N
The proposed site is located directly in front of Central Market, which is currently
an open air carpark, approximately 3852 sqm after setback. The Klang River flows
on the west of the site which then overlook high rise buildings such as Daya Bumi
and an upcoming City Point. The traffic along Jalan Tun Tan Cheng Lock is
exceptionally busy during peak hours and is even more congested sue to on going
construction activities. The area also has a high percentage of pedestrians travelling
from the Pasar Seni LRT station to nearby attractions such as Petaling Street, Pudu
and Dataran Merdeka.
3 . 1 C E N T R A L M A R K E T , K U A L A L U M P U R
3 . 2 S W O T A N A L Y S I S
WEAKNESS• LocatedrightinfrontofCentralMarket
whichmaypotentiallyblockitsfrontage.
• LRTlinesblockingconnectivitytothe
river
• Highlycongestedtraffic
STRENGTH• Highlyaccessiblebyallmodesof
transportation
• Strategicallylocatedalongaprominent
roadthatishighlyvisibletopublic
• Goodvantagepointtootherpartsof
KualaLumpur
OPPORTUNITIES• Potentiallycreateaproper
connectionfromCentralMarketto
theKlang River
• Introductionofgreenspacesthat
actsastoppingpoint/majornode
THREATS• Numerousongoingconstruction
maydisruptthecomfortofusers
onsite
• Riverarepronetoflooding,flood
preventionmethodstobe
considered
Page 6
0 3 S I T E I N T R O D U C T I O N
3 . 3 P E S T L E A N A L Y S I S
ECONOMICALThe main source of income of Central Market mainly depends on the
tourists that visits the area, as it has less attachment t the local
community. Located on a prime site, rental rates have sky rocketed due
to the increasing value of the site. Over dependency on tourism may
eventually hamper the development of Central Market as it is not being
supported by the local people.
POLITICALUncoordinated development in the area that is not properly monitored
by the government is a major issue that affects the quality of space in
general. Authorities such as DBKL, and companies like AECOM, ROL,
PEMANDU and Think City are not working hand in hand in carrying out
future developments of the area.
SOCIOLOGICALThe area is made up of a very diverse community. Locals, tourists,
foreign workers are all congesting the area with very little control. With
high traffic also comes problems pertaining social issues and security.
TECHNOLOGYThe use of technology is of utmost importance in developing the area
further. Technological advancement is needed to clean and utilize the
river properly.
ENVIRONMENTALPollution of the river is one of the biggest issue faced by the city. The
lack of awareness of the people and the increase in construction works
in the area is also contributing to a lot of existing environmental
problems.
LEGALBesides the basic regulations set out by DBKL, new regulations are also
being imposed in parallel with the River of Life project. Standardization
of signage, pathway finishes and building façade are some of the
requirements that should be taken into consideration.
Page 7
0 4 P R O G R A M M E V I A B I L I T Y
4 . 1 P R O J E C T O B E C T I V E S
• Toensurethequalityoftheprojectandfulfiltheclientsbrief
• Toensuresmoothmanagementoftheproject
• Toreducetherisksoftheprojectthroughoutthegiventimeframe
• Toensuretheprojectwillbedeliveredontime,withingivenbudget
andofthebestquality
4 . 2 P R O J E C T G O A L S
• Toaidclientinensuringsmoothmanagementoftheproject,with
establishedandhighlyexperiencedteammembers.
• Toensuretheconsistencyoftheoperationoftheproposedbuilding,
withconsistentproductionanddistributionoffruitsandvegetablesto
thepublic
• Toencouragethecommunitytoadoptahealthierlifestylethrough
educationthattakesplacewithintheprogramproposedandfurther
impactthefoodindustryofthenation.
4 . 3 S U C C E S S C R I T E R I A
QUALITYThe final product should meet the requirement of the client, but at the
same time do not compromise the architecture values of the building. It
should also be completed within the timeframe and budget allocated
without compromising it’s quality. Due to the sensitivity of the program in
dealing with plants and living beings, it is crucial to observe and control the
quality of the building materials to ensure the success of the program upon
completion of the project.
TIMEThe time frame given for the project is within a period of 16 months, from
1st of May 2017 to 9th of September 2018. The given time is sufficient as
the proposed project utilizes prefabricated structures and materials. The
entire project will be executed according to the work breakdown structure
and Gantt chart laid out to ease and ensure smooth flow of the project.
COSTThe budget allocated for the proposed project is RM5 million, fully funded
by Kha Seng Group Sdn Bhd. It encompasses pre construction costs,
construction costs and building operation and maintenance. Locally sourced
materials are an important element to ensure that the project effective.
Besides that, the implementation of natural design strategies are also used
to reduce the cost of building operation in the future.
Page 8
0 4 P R O G R A M M E V I A B I L I T Y
4 . 4 S T A K E H O L D E R S
DEWAN BANDARAYA KUALA LUMPURThe Kuala Lumpur City Hall is the city council that administers the city of
Kuala Lumpur. It ensures the the development of the city which covers
aspects relating to cleanliness, public transportation, city beutification,
public housings, public amenities, legislations, etc.
THINK CITYThink City is a wholly-owned subsidiary of Khazanah Nasional Berhad. It
works closely with local governments, international agencies and various
local communities, building effective partnerships and enhancing
capacity along the way.
RIVER OF LIFEThe River of Life Public Outreach Programme (ROL-POP) is a programme
to foster partnerships and to improve attitudes and behaviours of target
groups to reduce pollution in the Klang River, Malaysia. The main
objective of ROL-POP is towards river care and preservation in order to
improve water quality and reduce pollution within the project area
KHA SENG GROUP (CENTRAL MARKET)a privately owned conglomerate of companies that has acquired a few
notable properties in the area of Kuala Lumpur. They began venturing
into property development when they first acquired the Central Market
building in 2004 – which completely transformed the fate of the world
heritage site.
LOCALCOMMUNITYThelocalcommunityintheareamerelypassthrough
CentralMarkettogettootherareasandhasverylittle
attachmenttotheexistingsite.
TOURISTCOMMUNITYThesitehighlydependsonthetouristcommunityto
ensuregenerationofprofit.
VENDORS/STALLOWNERSThestallsparkedoutsideofCentralMarketattractsa
significantnumberofvisitorsfromthebuildingandin
thearea.
TAXIThetaxipointoutsideofCentralMarketisaprominent
featureastheirmaintargetusersaremostlytourists.
Page 9
0 5 D E S I G N S T R AT E G Y
5 . 1 K E Y F E A T U R E S
PUBLIC REALMSOne of the main aim of the building is to also expand its architecture
the public realm. The building was elevated to free up the ground
space in order to give back to the community. Plazas were also inserted
to reach out to its surrounding areas of Kasturi Walk and the river of
Life. Open floor plan systems are adopted to give a sense of
transparency to the building, allowing users to freely explore the
spaces.
GREEN SPACESThe entire building functions as a huge plot of green space that is
lacking in the city. The introduction of farms and green spaces will
reduce the heat island effect of the city and naturally cool down the
area. A public park on the ground floor allow users to gather and
socialize while still being educated about the purpose of the building
and the importance of farming.
LIGHTWEIGHT STRUCTUREThe absence of solid walls allows visual permeability to Central Market.
The lightweight structure of the building also poses an inviting feeling
to visitors and allows the activities inside to be seen to public on the
streets.
Greenspacesutilizedtocooldownthebuilding
Farmsorientatedtomaximizesunexposure
Loosefloorplanencouragescrossventilation
WaterrecyclingsystemfromKlang River
Page 10
0 5 D E S I G N S T R AT E G Y
5 . 2 S P A T I A L P R O G R A M M I N G
Theprogramsareseparatedverticallyaccordingtoitsfunctionandusergroups.Theprivacyofthebuildingincreasingasit progressesupwards,
howeverthetransparencyofthebuildingremainsthesame.Thegroundfloorintendstoservethepublic,asanopenparkthat canbeusedby
passersbyinthearea.Thefirstflooropensuptoacommercialspace,consistingofmarketsandanorganicrestaurant.Thesecondfloorconsistsof
managementandhandlestheoperationalaspectsofthebuilding.Finally,thetopmostflooractsasthecoreofthebuilding, whichholdsamajorityof
thefarms,overlookingthepublicactivitiesbelow.
FIRSTFLOOR,NTS SECONDFLOOR,NTS THIRDFLOOR,NTS
Page 11
0 6 M A I N T E N A N C E S T R AT E G Y
6 . 1 P R O G R A M M E M A I N T E N A N C E
ELEMENTS FREQUENCY STRATERGY
FARMS• Farmingstructures
• Farmingequipment
• Toolsandmachinery
• Livingplants
• Quarterly
• Monthly
• Quarterly
• Daily
• Toensurefarmingstructures aredurableandsafetobeused
• Toensurefarmingequipmentaresafetobeusedandtobereplacedwhen
necessary.
• Toensuretoolsandmachineryarewellfunctioningandsafetobeused
• Toensurethequalityofproducebycloselymonitoringthequalityofplants.
MANAGEMENT• Officeequipment
• Furniture
• Quarterly
• Annually
• Toensure equipmentsuchascomputersandprintersarewellmaintained.
• Toensurefurnitureareofgoodconditionandarecomfortabletobeused.
RESTAURANT• Kitchen equipment
• Toolsandmachinery
• Furniture
• Quarterly
• Quarterly
• Annually
• Toensure equipmentsuchascomputersandprintersarewellmaintained.
• Toensuretoolsandmachineryinthekitchenaresafetobeused
• Toensurefurnitureareofgoodconditionandarecomfortabletobeused.
MARKET• Stalls
• Marketequipment
• Daily
• Monthly
• Toensurethecleanliness ofthestallsforthecomfortoftheuser
• Toensureequipmentsuchastrolleysandstorageboxesarewellmaintainedand
safetobeused.
PARK• Planterbox
• Pavement/walkway
• Pond
• Benches/seatingareas
• LivingPlants
• Monthly
• Weekly
• Weekly
• Annually
• Daily
• Toensureplanterbox arestillusableandaretobereplacedifdamaged
• Toensurethecleanlinessofthepavementsandthewalkway
• Toensurethecleanlinessofthepondbyhavingweeklycleanups
• Toensureparkequipmentaresafetobeusedbythepublic
• Toensurethequalityoftheplantsbymonitoringthedaily
Themainprogramofthebuildingconsistsofvegetablefarms,whichneedspropercareandmaintenancetoensurethequalityofitsproduce.Other
majorspacessuchasmarketsandcommunaldiningneedsfrequentmaintenanceasitisexpectedtobeahightrafficarea.
Page 12
0 6 M A I N T E N A N C E S T R AT E G Y
6 . 2 B U I L D I N G M A I N T E N A N C E
Frequentmaintenanceisrequiredinordertoensuresmoothoperationofthebuilding.Mechanicalsystemneedstobemonitored regularlyandpublic
spacesshouldberegularlycleanedandequipmenttobereplacedwhennecessary.
ELEMENTS FREQUENCY STRATERGY
SERVICES• Mechanicalventilationsystem
• WaterPumpsystem
• Pipingutilities
• Lifts
• Refusechamber
• Quarterly
• Monthly
• Annually
• Bi-annually
• Monthly
• Toensuremechanicalsystemsarerunningsmoothlyforthecomfortofthepeople.
• Toensurethequalityofthewaterbyfrequentlymonitoringthewaterpump.
• Toensurenodefectsorleakagesarepresent.
• Toensuresmoothandsafeoperationofthelifts
• Toensurethecleanlinessandhygieneoftherefusechamber
BUILDING• Building fenestration
• Greenwall
• Externalwalls
• Flooring
• Annually
• Weekly
• Annually
• Daily
• Toensure thefenestrationiswellmaintainedandtobereplacedwhennecessary
• Toensurethequalityofthelivingplantsonthewallbycloselymonitoringit
• Toensurethecleanlinessandmaintenanceoftheexternalwalls
• Toensurethecleanlinessofthefloorsforthecomfortofthepeople
Page 13
0 7 R I S K A N A LY S I S
RISKNAME LIKELI-HOOD
SEVERITY EFFECT MITIGATION CONTIGENCY
PROJECTDESIGNPHASE
Designproposalnot
approvedbyclient
Medium Medium Constantamendmentswiththe
proposal willcauseclientstolose
interest,andaffectreputation
Reallytakeintoconsiderationof
theclientsrequirementsand
negotiatewhennecessary
Providemultipleproposals toallow
clienttohaveoptions
Client isindecisiveand
keepchangingdesign
scheme
Medium Medium Constantamendmentswiththe
proposal willdelaytheproject,due
totheinabilitytofinalizedesign
scheme
Setaspecific timeframeonwhen
tostopmakingamendmentsto
thedesignscheme
Project managertoensure thatthe
clientisawareandisontrackofthe
projectscheduleandthecurrent
progressoftheproject
Preliminarydrawingsnot
approvedbyauthority
Medium High Delay inprojectscheduleduetothe
inabilitytoproceedtoconstruction
phase
Ensurethatalldrawingssentfor
approvalarethoroughlychecked
and fulfillalltherequirementsby
theauthority
Revisepreliminarydrawingsand
makeamendmentswhennecessary
to complywithDBKLrequirements
CONSTRUCTIONPHASE
Delayinconstruction
worksduetoweather
conditions
High High Delay inconstructionworkswill
prolongthethetimeofthe
completionoftheproject,whichwill
alsoaffectthecost
Apply forpermittoprolong
workinghourstocompensatefor
therain andincreasemanpower
whennecessary
Projectmanagertokeeptrackof
theproject scheduleandinformthe
clientifthereisaneedforan
extensionoftime
Affect existingparking
spaceofCentralmarket
High High Theentireexistingparkingspacewill
betakenupbytheconstructionsite,
leavingnoparkingspaceforCentral
Marketvisitors.
Givenotificationof
closure/partial closureofparking
spacepriortoconstructionworks
and providealternativeparking
spotsnearby
Projectmanagertoensure thatthe
clientisawareofthenoticeandwill
beabletohelpindealingwith
upcomingissues/problems
Shortageofmaterialdue
towastage/improper
planning
Medium Medium Additionofcosttocoverupfor
insufficientmaterial
Ensurethattherearesufficient
materialsreadyonsite,with
formalagreementwithsupplier
toensuretheconsistencyof
materialprices.
Projectmanagertoregularlycheck
theinventorytoensurematerials
arenotbeingwasted
7 . 1 R I S K A N A L Y S I S & M I T I G A T I O N S T R A T E G Y
Page 14
0 7 R I S K A N A LY S I S
RISKNAME LIKELI-HOOD
SEVERITY EFFECT MITIGATION CONTIGENCY
BUILDINGOPERATION&MAINTENANCE
Poormaintenance of
plantingsystemsand
landscape
Medium High Objectiveoftheprogram willfailand
itwilldistributeproduceoflow
quality
Regularlymaintainplanting
systemsandcreateaweekly
scheduletoensurethe
cleanlinessandqualityofspace.
Building managementtoclosely
monitorandensuretheschedule
createdisenforced
Openness ofthebuilding
mayinviteunwanted
visitors
High High Security andprivacyofusers
inhabitingthespacewillbe
threatened
Enforceda 9am- 6pmoperation
hourandincreasesecurity
systemduringclosinghours.
Building managementtowork
togetherwiththeauxiliarypolicein
theareatomakeregularrounds.
Programfailstoattract
targetedvisitors
Medium High Buildingwontbeabletogenerate
enoughincometosustain
Activelyreachouttothepublic
andfrequently introducenew
programstobringinpeople
Building managementtoanalyze
targetusergroupsandcarefully
planoutproposedweeklyprograms
7 . 1 R I S K A N A L Y S I S & M I T I G A T I O N S T R A T E G Y
Page 15
0 8 W O R K B R E A K D O W N S T R U C T U R E
U R B A N F A R M I N G C E N T E R , K U A L A L U M P U R
CONSTRUCTIONPHASEPOST-
CONSTRUCTIONPHASE
PRELIMINARYMobilization
Dilapidation
Survey
SettingOut
SiteLevelling
Hoarding&
Signboard
FOUNDATIONSoilExcavation
Pilingof
foundation
InsertionofRC
footing
STRUCTURALGroundFloorto
ThirdFloorSteelBeam,
Columns
CompositeDecking
Slab
Staircase
LoadBearingBrick
Wall
SteelRoofing
Structure
RCLiftCore
InternalWalls&
Partition
InstallationofDoors
andWindows
ROOFINGGutter&
Drainage
System
M&ESERVICESLiftInstallation
Fan&Air
Conditioning
Earthing System
Fusebox
Installation
Telephone&
DataSystem
LightFitting
Lighting
Protection
CCTV
Installation
FireProtection
BUILDINGFINISHES
DoorInstallation
Window
Installation
FloorFinishes
Staircase
Finishes
SanitaryFinishes
WallFinishes
CeilingFinishes
EXTERNAL/LANDSCAPESurfaceWater
Drainage
ExternalM&E
Work
Landscape
Pathway
Landscape
Vegetation
Turfing
Signage
Miscellaneous
PAHSEOUTFinalCleaning
Inspectionand
HandingOver
IssuanceofCCC
Page 16
0 9 G A N T T C H A RT
Page 17
0 9 G A N T T C H A R T