Project Check List Updated 6-26-12 YouSendIt Section Tr Date Created Date Due Project Title - City Rep Project Emailed Coordinator Project Folder Project Docs Uploaded Blueprint Folder Blueprints Uploaded Client Access Pre- Bidding Pending Funding On Hold Architect / Engineer Bidding 11/16/2012 11/15/2012 Shop at the Eagle Rock - Eagle Rock F F F F 11/16/2012 11/20/2012 Santa Ana College Repair - Santa Ana F F F F F F F 11/16/2012 11/29/2012 Renovation of the Personnel Building - Torrance F F F F F F F 11/16/2012 11/30/2012 HomeGood Huntington Beach F F F F 11/19/2012 11/27/2012 OVMC Child Care Center - Sylmar F F F F F F F 11/19/2012 11/23/2012 Camille La Vie - Glendale F F F F F F F 11/19/2012 11/29/2012 LDS - Los Angeles Temple Apartments - Los Angeles F F F F F F F 11/19/2012 11/26/2012 El Zocalito Bldgs A,B,C&D - Pacoima F F F F F F F 11/20/2012 12/12/012 Beswick Senior Apartments F F F F 11/28/2012 12/17/2012 Riverwalk at Reseda- Los Angeles F F F F F F F 11/28/2012 12/11/2012 Lululemon Athletica #13021- Santa Barbara F F F F F F F 11/30/2012 11/29/2012 Civita Apartments #2 F F F F F F F 11/30/2012 Hilton Garden Inn - Palo Alto F F F F F 11/30/2012 The Levering Apartments - Los Angeles F F F F F Projects Already Sent 11/23/2011 12/7/11 1304 Figueroa LA 8/24/2011 12/1/11 180 Valencia - Summerland 5/19/2011 5/31/11 1860 Hill Center - LA 2/2/2012 2/14/12 1st & Rosemary Family Affordable Housing - San Jose 11/28/2011 12/15/11 21 Union Jack
180
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

YouSendIt Section Tracking

Dat

e Cr

eate

d

Dat

e D

ue

Project Title - City Rep

Proj

ect E

mai

led

Coor

dina

tor

Proj

ect F

olde

r

Proj

ect D

ocs

Upl

oade

d

Blue

prin

t Fol

der

Blue

prin

ts U

ploa

ded

Clie

nt A

cces

s

Pre-

Bid

ding

Pend

ing

Fund

ing

On

Hol

d

Arch

itect

/ E

ngin

eer B

iddi

ng

Unc

onfir

med

GC

Bidd

ing

Sub

Bidd

ing

In C

onst

ructi

on

Clos

ed

11/16/2012 11/15/2012 Shop at the Eagle Rock - Eagle Rock F F F F

11/16/2012 11/20/2012 Santa Ana College Repair - Santa Ana F F F F F F F

11/16/2012 11/29/2012 Renovation of the Personnel Building - Torrance F F F F F F F11/16/2012 11/30/2012 HomeGood Huntington Beach F F F F11/19/2012 11/27/2012 OVMC Child Care Center - Sylmar F F F F F F F11/19/2012 11/23/2012 Camille La Vie - Glendale F F F F F F F

11/19/2012 11/29/2012 LDS - Los Angeles Temple Apartments - Los Angeles F F F F F F F

11/19/2012 11/26/2012 El Zocalito Bldgs A,B,C&D - Pacoima F F F F F F F11/20/2012 12/12/012 Beswick Senior Apartments F F F F11/28/2012 12/17/2012 Riverwalk at Reseda- Los Angeles F F F F F F F11/28/2012 12/11/2012 Lululemon Athletica #13021- Santa Barbara F F F F F F F11/30/2012 11/29/2012 Civita Apartments #2 F F F F F F F11/30/2012 Hilton Garden Inn - Palo Alto F F F F F11/30/2012 The Levering Apartments - Los Angeles F F F F F

Projects Already Sent11/23/2011 12/7/11 1304 Figueroa LA8/24/2011 12/1/11 180 Valencia - Summerland5/19/2011 5/31/11 1860 Hill Center - LA2/2/2012 2/14/12 1st & Rosemary Family Affordable Housing - San Jose

11/28/2011 12/15/11 21 Union Jack12/28/2011 TBD 2802 Pico Affordable Housing - Santa Monica

Page 2: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

1/30/2012 1/20/12 430 Pico Affordable Housing - Santa Monica10/29/2012 TBA 463 Salem Street Multi-Family - Glendale F F F F

8/19/2011 8/25/11 4s Medical Office Plaza - San Diego4/16/2012 4th Fl. Medical Office - Los Angeles Flor F F F F x

7/6/2012 7/20/2012 4th St. Patagonia- Santa Monica F F F F F7/11/2011 PT 50 Unit Mixed Use - Sherman Oaks B B B x4/16/2012 529 Spring St Mixed Use - Paso Robles Ranjit F F F F x

Closed 6225 Zumirez - Malibu PROJECTS WAS NEVER EMAILED TO CLIENTS X12/4/2011 12/30/11 688 Berendo St 7/7/2012 TBD 700 Block of K Street-Sacramento F F F F F

12/28/2011 TBD 7441 Edigner Ave Mixed Use12/28/2011 1/16/12 7th & Arizona Apartments - Santa Monica6/15/2012 TBD 99 Cents Only Store - Oaks ranjit f f

5/16/2012 A & R Wholesale - Anaheim Flor F B F F F b F x9/14/2011 9/14/11 Adler Remodel - Newport Beach1/12/2012 P.Trade Albers Apartments - LA B x4/12/2011 TBD Alhambra One Podium - Alhambra

10/24/2011 11/9/11 Allaince Broadway - LA3/28/2012 Closed AMC Marina 6 Remodel - Marina Del Rey ? ? ? ? ? ? ? X5/31/2011 6/12/11 American Saint Hill Org and Advanced Org - LA5/10/2012 5/19/12 Antico Pizza Napoletana - LA

5/19/2012 Antico Pizza Napoletana - Los Angeles Ranjit r F F F F x7/14/2011 TBD Appian Way Residence - Long Beach6/2/2011 6/20/11 Ararat home of Los Angeles-Skilled Nursing Faclity Exp. - Mission Hills

TBD Archstone Mixed Use - Mountain View Ranjit r F F F x9/16/2011 4/18/12 Arlington Child Care Facility B1/30/2012 1/24/12 Arlon - Santa Ana4/22/2011 5/2/11 Artisan - Oxnard5/17/2011 TBD Arts District Mixed Use Facility - Glendale9/1/2011 9/14/11 Ashley Furniture - Laguna Hills

8/31/2011 9/7/11 Ashley Furniture - Northridge8/9/2011 8/31/11 Atria Hillcrest - Thousand Oaks

6/15/2012 7/10/2012 Awnings And Canopies– At Divisions- Chatsworth Flor f f f f X

Page 3: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

4/25/2012 Babaian Residence - Glendale B x4/25/2012 Babain Residence - Glendale B x

5/31/2012 Bakersfield Memorial Hospital Ranjit r F F F x4/30/2012 Closed Bakersfield Senior Housing - Bakersfield X2/13/2012 Ball & Torrance - Torrance ? ? B ? ? F F X

11/22/2011 Barker Block Bldg 5 & 6 - Los Angeles B x4/25/2012 Bed Bath & Beyond- Palm Street Flor F F F F8/14/2011 4/8/00 bed skilled nursing facility Phase 3 - Moreno Valley5/10/2012 5/22/12 Behavioral Health Unit - Santa Cruz

5/22/2012 Behavioral Health Unit - Santa Cruz Ranjit r F F F F x6/6/2011 6/24/11 Bel Sir Highlands - Bel Air

4/18/2012 Bella Terra Senior Housing - Morgan Hill Flor F B F F x x9/21/2011 12/28/11 Belmont Town Homes Phase 2 - Cypress4/18/2012 Bldg GG Student Services Design/Build - Long beach Ranjit F x

10/15/2012 10/30/2012 BLUE LINE TROLLEY STATION IMPROV - SAN DIEGO Ranjit x BA F F F X10/29/2012 12/14/2012 Blue Line Trolley Station Improvements F F F F F F F

1/12/2012 TBD Blythe Hampton Inn and Suites ? ? B B xClosed Boardwalk Fresh Burgers & Fries - GC Notice B XClosed Boardwalk Fresh Burgers & Fries - Hermosa Beach PROJECTS WAS NEVER EMAILED TO CLIENTS XClosed Boardwalk Fresh Burgers & Fries - Huntington Beach x X

5/31/2011 6/7/2011 Bonita Duplex - Redlands B x x3/12/2012 4/4/2012 Brand Library & Arts Center - Glendale F X4/16/2012 Breakthru Fitness Speed School - Pasadena BA x x x x4/18/2012 5/1/2012 Broadway Triangle Development - Sacramento F x x4/18/2012 Broadway Trianlge Development - Sacramento Flor F F F x7/12/2011 7/21/2011 Bru Grill Market TI - Lake Forest f F f f X3/28/2012 4/10/2012 Buffalo Wild Wings - Long Beach F X

12/28/2011 ASAP Burbank Medical TI B X4/19/2012 Burbank Retail Lot B X5/8/2012 TBD Burns Pacific Office Bldg - Thousand Oaks Ranjit B F F x

1/12/2011 1/20/2011 CA LA Sky - Los Angeles1/12/2011 CA LA Sky - Los Angeles F x6/20/2011 7/12/2011 Caloptima - Orange

Page 4: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

5/8/2012 TBD Camino Nuevo Charter Academy - Los Angeles Ranjit f F F F x5/18/2012 TBD Camino Nuevo Charter Academy - Los Angeles f B f f x7/14/2011 8/19/2011 Canby Woods - Reseda7/28/2011 8/9/2011 Capelin Distribution Center - Los Angeles7/7/2012 TBD Carbide Industrial Buildings- Corona F F F F F7/7/2012 TBD Carbide Industrial Buildings- Corona F F F F F6/5/2012 6/18/2012 Carl’s Jr. #103- Irvine F F F F F F

4/25/2012 TBD Carlos Ortega Villas - Palm Desert Ranjit R B X3/28/2012 Carlton Oaks Golf Resort - Santee ? f B f f X2/3/2011 TBD Carson Housing f B f f x

1/30/2012 Casita Zen - Alhambra ? ? F ? B B B x6/11/2012 7/10/2012 CDM Enclave- Newport Beach F F F F F F F

11/14/2011 11/30/11 Centinela Hospital 5th floor Conversion7/12/2011 TBD Central Park Village - Brea X

11/22/2011 12/14/11 Chase - Los Angeles1/30/2012 2/9/2012 CI Student Housing Phase 3 - Camarillo F X3/23/2012 4/10/2012 Civic Center Conceputal Layout - Visalia F X X

5/14/2012 Cliffhouse Restaurant - La Quinta Flor F F F F F X4/13/2011 TBD Colorado at lake - Pasandena4/25/2012 5/8/2012 Corner Bakery - Redlands F F B F F F X

10/29/2012 TBA Cornerstone Enterprise Mixed-Use Development F F F F12/21/2011 1/4/12 Cotton On- Westminster4/16/2012 Court St Condos - Martinez Ranjit F F F F X4/18/2012 Courtyard at Mandaly Bay - Oxnard Ranjit B F X1/18/2012 Courtyard at Marriott - Long Beach B x1/18/2012 TBD Covington Hills - Ladera Ranch ? ? F ? ? x5/15/2012 5/23/2012 Crestview Cadillac Remodel - West Covina F x x5/15/2012 Crestview Cadillac Remodel - West Covina Ranjit F F F F8/14/2011 8/24/11 CSMC 8th Floor Pathology Lab Remodel - LA7/7/2012 TBD Cuestas Villas- Cerritos F F F F F7/7/2012 P.Trade Culver City Office F F B F F F x

8/16/2011 8/18/11 CVS Pharmacy 9726 - Santa Monica8/16/2011 9/2/11 CVS Huntington Beach

Page 5: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

6/30/2011 7/13/11 CWA New Offices - Culver City10/24/2011 10/31/2011 Cypress Village Park - Irvine5/10/2012 5/23/2012 Deckers TI - Goleta Flor F F F F x7/7/2012 P.Trade Del Ano 6 Unit - Van Nuys F F B F F F x2/2/2012 2/13/2012 Dicks Sporting Goods - Huntington Beach x x

4/18/2012 Dinuba Village - Dinuba Ranjit F x4/16/2012 District Cold Storage Facility - Pomona Ranjit F X F F F x5/8/2012 5/11/2012 Doheny Faculty Center- Los angeles Flor F F F x

2/20/2012 Closed Dos Lagos - Corona x x6/11/2012 TBD Doubletree Hotel Renovation- San Diego F F F F F x

09/0/11 9/15/11 Downer Gateway - Downey4/16/2012 Driffill ES - Oxnard Flor F F F F x

10/30/2012 11/6/2012 Duarte High School - Duarte F F F f f b4/25/2012 TBD Eagle Vista - Los Angeles Ranjit R B F F x x1/30/2012 Closed Edison St Service Station - Santa Ynez x11/6/2011 El Corazon - Costa Mesa B4/18/2012 El Corazon - Oceanside Ranjit B F x

12/28/2011 TBD El Monte Entertainment Facility B x x7/1/2011 7/13/11 El Super Store 24 - La Puente7/7/2012 TBD Element Hotel-Irvine F F F F F

1/12/2012 2/13/12 Elephant Bar - Northridge4/25/2012 Engineering Services- Los Angeles Flor F X F F F8/16/2011 8/22/11 Entradero Project - Torrance6/13/2011 8/31/11 Equinox - Marina Del Rey6/8/2011 7/30/11 ERA - Fountain Valley

6/15/2012 TBD Estates Drive Commercial Center - Dr. Thousand Oaks ranjit f f x11/8/2012 TBD Etiwanda Freeway Center - Ontario F F F F x

5/8/2012 5/22/2012 Expand and Renovate Research Labs - San Diego Ranjit F F F x10/15/2012 10/26/2012 FAIRFIELD INN & SUITES - NORCO Ranjit x BA F F B X

10/30/2012 10/30/2012 Fairfield Inn & Suites - Norco F F F F F F F4/24/2012 Fairvalley High School- Covina Flor F X F4/12/2012 Fairvalley HS - Covina BA x X x B x8/29/2011 9/6/11 Fame - Senior Housing - Santa Monica

Page 6: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

6/15/2012 6/27/2012 Family Dollar - Gardena ranjit f f f X4/16/2012 Family Dollar - South Gate Flor F F F F x2/2/2012 4/2/12 FE waymouth WTP Oxidation Retro - La Verne7/1/2011 0/05/11 fogo de chao - Bevely Hills

6/4/2012 Fontana Truck Stop Flor F F F F F x10/30/2012 Food 4 Less # #399 (Bldg. & Site) (ATHENS) - Los Angeles, CA. F F F F

4/18/2012 Foothill Blvd Mixed Use - Hayward Flor F F F x10/13/2011 Forester Sq Apartments Development - Santee ? ? ? ? ? ? B x11/14/2011 Four Detached Homes - Temple City ? ? B B B B B x3/12/2012 TBD Four Seasons Mall - Techacpi F x4/16/2012 Gerhart Childcare Center - Los Angeles BA x x x x1/18/2012 Glendora Cheverolet F x7/11/2011 9/21/11 Goddard School- Ladera Ranch 4/13/2012 Golden West Condos - Arcadia x x x x

12/28/2011 Goudy Honda - Alhambra B x4/13/2011 TBD Grand Blvd medical Offices - Corona5/16/2011 5/24/11 Green Hills Pacific Terrace9/21/2011 Green Residence - Long Beach ? ? B ? ? ? F B x

5/16/2012 Green St Apartments - Pasadena Flor F F F F F B F x3/28/2012 4/4/2012 Ground Up Commercial Project - Claremont F x1/24/2012 2/1/12 Guest House Renovation - Beverly Hills4/25/2012 5/3/2012 Guppy House Restaurant - Temple City F F F F F7/26/2011 7/29/11 H & M Redondo beach3/2/2011 3/9/11 Hampton Inn - Victorville6/5/2012 6/20/2012 Hampton Inn- San Diego F F F F F F

4/16/2012 7/23/2012 Hanless Toyota - Davis BA f f f x B x9/14/2011 10/26/11 Hanson Residence - Lguna Beach9/14/2011 9/22/11 Harbor Freight & tools - N. Hollywood2/20/2012 2/24/2012 Harbor Freight Tools - F6/5/2012 6/15/2012 Harbor Freight Tools- La Mirada F F F F F F F x

7/17/2012 Harden Buick GMC - Anaheim F F B F F F x5/7/2012 HD Supply - GC Notice

4/16/2012 HD Supply Repair & Remodel - Santa Ana Flor F F F F F F x

Page 7: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

12/28/2011 1/9/12 Helzberg Diamonds #351 - Ontario5/31/2011 06/0/11 Henry bendel - Santa Clara3/23/2012 Henry Mayo MOB1 - Valencia ? ? ? ? x

11/14/2011 TBD Hercules Campus Conversion - Los AngelesHidden Hills Residence x

7/5/2011 8/9/11 Hillcrest Housing - Thousand Oaks3/23/2012 4/6/12 Hilton Garden Inn - Marina Del Rey7/18/2011 Closed Hollywood Hills - Los Angeles x x8/7/2011 8/11/11 Holt Apartments - Los Angeles

11/28/2011 12/14/11 Home Depot - fullerton8/24/2011 9/13/11 Home Depot - Lodi4/18/2012 5/11/12 Home Goods - Lakewood4/18/2012 4/30/2012 Home Goods - Lakewood Ranjit F F F F F x4/16/2012 HomeGoods TI - Torrance Ranjit F F F F x

11/14/2011 11/30/11 Homes for Heros5/15/2012 5/18/2012 Hope St. - LA Ranjit F F F F x5/24/2011 5/31/11 House of imports Phase 27/13/2011 11/11/11 Howard Custom Residence - Malibu4/24/2012 HR Renovation - Glendale ? ? ?

12/28/2011 1/6/12 Hudson Groupe- I love LA - Los angeles6/13/2011 6/16/11 Huitt Zollars Office Spaces - Irvine9/7/2011 9/21/11 Hyatt Place

1/19/2011 TBD ICAC Vendor Applications8/1/2011 8/10/11 Icon at UCSB - Goleta

6/20/2011 7/1/11 Inland empire Center Façade Remodel Phase 14/25/2012 5/2/12 Innovative Restaurant - W. Hollywood4/25/2012 5/2/2012 Innovative Restaurant-West Hollywood Flor F F F x B3/15/2012 3/28/12 Inshape #50 -orcutt3/15/2012 3/29/12 InShape Health Club # 487/5/2011 7/20/11 Irving Place

1/16/2012 2/17/12 It Irwin Replacement Hospital8/11/2011 8/1/11 Ivda Bldg 48 TI- San Bernadino1/30/2012 2/22/12 JC Penny Remodel - Victorville

Page 8: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

4/16/2012 Jefferson Blvd Apartments - Los Angeles Ranjit F F F F B F x4/24/2012 Jefferson Park Terrace-Los Angeles Flor F F F ? ? ? x4/18/2012 Johnson Middle School- Westminster Flor6/15/2012 6/26/2012 Jos. A. Bank- Tustin Flor f f f f f6/13/2011 6/22/11 Kay jewelers - Culver City

12/13/2011 12/21/11 Kiddie Academy - Diamond Bar2/2/2012 Kino Flo - Burbank F x x5/8/2012 Kirklands - GC Notice X x

3/28/2012 4/5/2012 Kirklands - Palmdale f f f x9/14/2011 9/27/11 Koonce Residence - Santa Barbara5/7/2012 Krisers Pet Supply - GC Notice

3/28/2012 4/5/2012 Krisers Pet Supply - Newport Beach xKTLA Studio Redevelopment R R B F F F

4/12/2012 La Cienega Retail Renovation - Los Angeles BA f f f x x4/16/2012 LA Conference & Guest Ctr - Los Angeles BA x x x x6/13/2011 6/20/11 La Costa Town Square - Carlsbad

7/6/2012 P.Trade La Floresta- Brea F F F F F4/25/2012 TBD LA Marriot Courtyard Residence - Los Angeles Ranjit R B F F x x2/13/2012 La Palma Retail - Anaheim B x

10/24/2011 10/27/11 La Paz Village - Laguna Hills11/9/2011 1/2/12 La Quinta HS - La Quinta2/20/2012 P. Trade La Quinta Memory Care Ctr - La Quinta f ? B f f B B x2/2/2012 2/29/12 La Verne Maintenance Shops Upgrade 4 - La Verne

4/18/2012 Laboratory Upgrade & Expansion - Indio Ranjit B F x10/30/2012 11/7/2012 Lancaster Marriott Towne Places Suites - Lancaster b b b b b

4/26/2011 9/1/11 Las Casitas Apt Copmlex - Irwindale8/1/2011 8/10/11 Laurelmont DR. - Los Angeles6/6/2011 6/7/11 Layne Christensen Company - Colton

5/24/2011 5/30/11 Le Pain Quotiden Fashion Island - Newport Beach8/24/2011 9/23/11 Legendary Tower - Glendale8/31/2011 9/15/11 Lewis Retail Ctr Dr Rothbard Optometrist - Cucamonga

12/28/2011 TBD Lex on Orange - Glendale1/19/2011 TBD Lido Village Rehab - Newport beach

Page 9: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

10/25/2011 10/2/11 Lids - Hollywood4/30/2012 5/10/2012 Lincoln ES - San Bernardino F x x

TBD Loews Hotel - Santa Monica Ranjit r F F F x11/9/2009 TBD Loma Bonita Residences - San Dimas ? ? B x3/8/2012 P. Trade Loma Linda Assisted Living B x x3/8/2012 TBD Loma Linda Assisted Living - Loma Lina ? ? B x x

4/18/2011 4/28/11 Longo Toyota Façade Remodel - El Monte11/19/2010 11/30/10 Lorena Apartments - Los angeles4/30/2012 Los Angeles Ave Medical Office Bldg - Simi Valley B x4/30/2012 Los Angeles Medical Office - Simi Valley Flor F F F F x

P. Trade Los Angeles Pediatrics Ranjit r F F F x5/10/2012 P. Trade Los Angeles Pediatrics F x x7/7/2012 TBD Los Robles Apartments- Thousand Oaks F F F F F

5/10/2012 Lowes Hotel - Santa Monica B x x11/6/2011 11/14/11 Lush Cosemtics - Newport Beach9/23/2011 1/4/12 Luxe at Washington - LA9/23/2011 10/5/11 Luxe at La Cienega - LA4/16/2012 Lynwood Schools Concession Bleacher - Lynwood Ranjit F F F F B B x4/25/2012 5/18/2012 Lyons Park - Buena Park Flor F F F F B B X3/23/2011 4/5/11 Macys Fashion Valley TI - San Deigo1/24/2011 TBD Magnolia Apartments - Sherman Oaks

12/21/2011 P. Trade Manhatten Beach Residence B B B B B X6/13/2012 6/22/12 Manheim Auto Auction6/11/2012 6/21//12 Manheim Auto Auction- Riverside F F F F F B F4/13/2012 Mar Vista Housing Development - Pasadena BA x x x x6/5/2012 6/11/2012 Marconi Self Storage Center- Sacramento F F F F F F F

10/29/2012 11/6/2012 Marguerite Parkway Median Island Civic - Mission Viejo F F F F b x12/4/2011 TBD Marian Medical TI7/7/2012 TBD Mariposa Avenue Subdivision-Riverside F F F F F

11/22/2011 12/1/11 Marlay Distribution center - Fontana5/17/2011 10/27/11 Marriott - Goleta9/7/2011 9/16/11 Marshall - Beverly Connection

4/25/2011 5/7/11 Marshalls - Placentia

Page 10: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

4/25/2012 Marshalls- Placentia Flor F F F F4/5/2011 4/8/11 Mc donalds - La Puente

5/29/2012 Mc Donalds 40125 - Costa Mesa Ranjit r F F F b F x7/1/2011 7/1/11 Mc Donalds 42368 - LA

4/16/2012 Meadow Glen Apartments - Modesto Ranjit F F F F F B x10/13/2011 TBD Medical Offices TI - Valencia5/11/2011 5/14/11 Melodys Restaurant - Reseda5/31/2011 6/17/11 Mens Warehouse #2732 - West Covina

Mental Health 14th St Office TI R R F F F F3/7/2012 3/12/12 Merci Group Home - Moneerey Park7/1/2011 7/6/11 Michael Kors - Sherman Oaks

10/29/2012 12/13/2012 Michelson Water Recycling - Irvine F F F F10/29/2012 12/13/2012 Michelson Water Recycling - Laguna Niguel F F F F x

11/9/2011 11/14/11 Mid Cellis Apartments - San Fernando10/29/2012 10/29/2012 Mid-Valley Multi Purpose Ctr - Panorama City F F F F F F F

10/16/2012 10/29/2012 MID-VALLEY MULTIPURPOSE CTR - PANORAMA CITY Ranjit x BA F F X2/1/2011 3/18/11 Miller ifiniti - Van Nuys

6/20/2011 6/30/11 Mission Apartments - San Deigo4/16/2012 Monarch Beach Plaza Remodel - Monarch Beach Flor F F F F x5/2/2011 5/6/11 Montclair 4 - Montclair

10/13/2011 10/20/11 Monteray Towers - Santa Cruz F x4/19/2012 Monterey Towers - Santa Cruz B B B B B B X

TBD Monterey View Townhomes - Hermosa Beach Ranjit r F F F x8/31/2011 9/22/11 Montgomery Self Storage - Oxnard8/11/2011 8/18/11 Morrison Park Fire Station - Moreno Valley

TBD Morro del Mar Senior Housing R R F F F x7/6/2012 7/17/2012 Morton Village-Los Angeles F F F F F x

9/21/2011 Mosaic Gardens - Whittier B f B f F B B x6/15/2011 6/29/11 Mossy Nissan - Escondido4/26/2012 TBD Mountain Grove at Citrus Plaza - Redlands Ranjit f F F X5/26/2011 6/10/11 Multi- Tenant Bldg - Simi Valley5/15/2012 5/23/2012 Multi Tenant Retail - Thousand Oaks F x x5/15/2012 Multi-Tenant Retail- Thousand Oaks Flor F F F F F

Page 11: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

2/15/2011 3/4/11 Multiview Residence - LA9/14/2011 9/27/11 Munoz Residence - Gardena

12/14/2011 12/20/11 Museum on the Square - Santa Rosa4/2/2012 Music Art Studio Bldg - Santa Monica Flor F B B B B X

7/18/2011 8/2/11 Napa Century Center XD 1211/8/2012 Canceled National Chain Retail Store - Los Angeles County F F F F x

8/24/2011 9/3/11 Navy Federal Credit Union - Riverside7/12/2011 7/25/11 NCM Baptist Church Expansion - Paramount

tbd 7/29/11 New 2 Story Bldg - LA2/16/2012 TBD New 3 Story Bldg - Los Angeles ? ? x1/18/2012 3/1/12 New Construction Residence - Newport beach1/16/2012 1/25/12 New District Warehouse - Redlands5/24/2011 5/31/11 New Hotel Development - N. Hollywood12/4/2011 12/19/11 New Library - Rivera4/25/2012 TBD New Main Kitchen - Porterville Ranjit R X B F B B F x8/16/2011 9/8/11 New Student Services Bldg and Modernization of Holmes Hall - LA

TBD New Vista Transitional Living Center - Fullerton Flor F F F F x11/17/2010 12/31/10 Newton Residence - Palisades5/25/2011 5/27/11 Nichols Restaurant - Marina Del Rey7/19/2011 7/28/11 Nordstrom Rack TI

12/28/2011 1/3/12 Normandie 16 units - LA7/25/2011 TBD North Sierra Bonita Condos

10/11/2011 10/27/11 Northwood ctr Modernization - Irvine11/22/2011 12/11/11 Norwalk Bus Shelters - Norwalk9/15/2011 10/3/11 Nutmeg Professional Plaza - Murreta4/18/2012 Oak Creek Affordable Housing - Beaumont Flor F F F x4/18/2012 TBD Oak Knoll Community Development - Oakland Ranjit F x5/8/2012 5/14/2012 Oak Park Community - Paso Robles Ranjit F F F x

10/11/2011 10/14/11 Oak View Self Storage - Oak View5/8/2012 5/29/2012 Oakview Dr Apartments Flor F F F

8/16/2011 9/14/11 OC Fair Mall Renovation - Costa Mesa4/18/2012 Ocean St Commons - Santa Cruz Flor F F F B B x7/18/2011 9/23/11 Oceo - Palm Springs

Page 12: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

11/28/2011 12/13/11 Ochard Supply Hardware - LA10/29/2012 TBA O'Connell - Indio F F F F

9/21/2011 9/27/11 Old Golf Course Clubhouse Remodel7/1/2011 7/20/11 Old Navy Fox Hills Mall - Culver City

10/11/2011 10/25/11 Olive Garden #4407 - San Dimas1/16/2012 2/6/12 Olive Garden #4430 - Turlock3/23/2012 Olive Garden #4433 - Culver City ? ? ? ? B B x4/24/2012 Olive Garden -Culver City Flor F F3/25/2011 10/24/11 One Westside Plaza4/10/2012 Ontario Mills Food Court Renovation ? ? ? ? x2/13/2012 2/24/12 Operation Safehouse of the Desert - Thousand Palms5/12/2011 5/20/11 Orange Garden Apartments - Poway3/25/2011 4/1/11 Oriole Dr. Residence - Beverly Hills4/16/2012 Osborne St Multi-Units - Los Angeles BA x x x

5/9/2011 6/2/11 Our Lady Queen of Angeles Phase 212/21/2011 2/23/12 p2-89 - Huntington Beach11/28/2011 12/14/11 Pacific Point North - Long Beach3/28/2012 4/10/2012 Pacific Square - Long Beach ? ? ? ? ? x2/13/2012 2/23/12 Pad 4 Bldg San Manuel Village - Highland2/16/2012 tbd Palm Ave Development - Imperial Beach2/16/2012 Palm Ave Development - Imperial Beach ? x4/5/2011 4/17/11 Palmdale Medical Building - Palmdale

4/30/2012 5/31/2012 Palos Verdes HS 10 Classrrom Bldg F x x8/31/2011 9/7/11 Panera Bread 1597 - Cucamonga7/14/2011 7/23/11 Park Dr. - LA2/13/2012 TBD Park Lofts - National City ? ? x3/12/2012 3/23/12 Park Place Cafeteria - Irvine6/15/2012 TBD Parkside Estates- Huntington Beach Flor f f f f x3/7/2012 4/12/12 Pasadena Humane Society3/7/2012 Pasadena Humane Society ? ? B ? ? F F x8/4/2011 8/9/11 Paseo de Verdugo Mixed Used Development - Capistrano

6/15/2011 tbd Paseo nuevo - Oxnard2/20/2012 3/2/2012 Perris Station Sr Apartments - Perris ? ? x

Page 13: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

10/22/2010 11/5/10 Peter Lambert Home - Van Nuys2/2/2012 3/13/12 Pico Branch Library - Santa Monica

1/16/2012 1/23/12 Pier 1 Imports - Culver City3/23/2012 Pier 1 Imports - Goleta ? ? ? ? x 9/14/2011 9/14/11 Pieser Residence - Laguna beach

12/28/2011 1/23/12 PIH Bright Health - La Mirada6/5/2012 6/19/2012 Pioneer High School - Whittier F F F F F F

12/28/2011 1/10/12 Place of Worship Phase 23/18/2011 3/28/11 Planet Fitness - San Bernardino4/11/2012 Playa Del Oro West - Los Angeles BA x x x F x5/8/2012 5/17/2012 Playa Vista Community Center - Playa Vista Flor F F F F F F

Plaza Community Services - GC Notice X7/20/2011 TBD Plaza Mixed Use - West Hollywood B x x9/1/2011 9/9/11 Pomona Ranch Plaza Office bldg

10/3/2011 10/11/11 Port of Long Beach - Long Beach4/26/2012 Port of Los Angeles - San Pedro Ranjit f F F F F F X

11/28/2011 12/7/11 Portola Springs Park 4 - Irvine4/18/2011 4/20/11 PRES Bldg Offices - Newport beach4/18/2012 5/10/12 Progessive Reginal Claims Office - Pasadena5/8/2012 Progressive - GC Notice X

4/18/2012 4/27/2012 Progressive Regional Claims Office-Pasadena Ranjit F F F F F x5/25/2011 6/3/11 Propsed Residence - Dana Point

TBD Protasevich Residence - Pacific Palisades B xPS Culver City Restaurant R R F F F

10/29/2012 11/7/2012 Public Storage - San Diego F F F F b b b4/26/2012 5/2/2012 Puma - Cabazon Outlets - Cabazon B B

10/23/2011 11/10/11 PWC Family Housing - LA5/15/2012 5/30/2012 Quinn Catapillar - Industry F x x5/15/2012 Quinn Caterpillar - Industry Ranjit F F F F x x5/8/2012 5/15/2012 RACMH - North Hills Ranjit F F F x

Ralphs 209 R R B F F FP. Trade Ralphs 222 - Sherman Oaks ? ? F ? ? ? ? ? x

Ralphs 71 R R F F F F

Page 14: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

9/14/2011 TBD Rancheria Cottages - Santa BarbaraTBD Rancho Cucamonga Condos Ranjit r F F R x

9/23/2011 9/28/11 Rancho Harvest Office Bldg11/6/2011 11/14/11 Razavi House - Dana Point

10/11/2011 11/2/11 Readiness Center headquarters - Los Alamitos5/12/2011 5/24/11 Red Lobster - Thousand Oaks

10/11/2011 10/14/11 Red Lobster # 6378 - Palm Desert2/2/2012 TBD Red Maple Village - Residential Portion F x x

2/16/2012 2/2/12 Redhawk Towne Center - Temecula6/11/2012 TBD Redlands Distribution Center- Redlands F F F F F

Redlands Distribution Ctr - Bldgs 9 & 10 R R F F F F9/21/2011 9/26/11 Redondo Landing - Redondo beach

10/24/2011 11/10/11 Reebok - Camarillo7/11/2011 7/13/11 Renovate BEQ B24 and B25 at pt Mugo - Ventura County7/11/2011 7/18/11 Renovate BEQ PH1184 - Port Hueneme4/16/2012 Renovate Bldg 1 First Floor - San Diego Flor F F F F F F x3/12/2012 3/21/12 Renovating Housing Unit C8/16/2011 8/22/11 Residence Addititon - Tarzana

5/31/2012 Revere MS - Los Angeles Ranjit r F F F x1/18/2011 TBD Richardson Rolon Residence - Redondo Beach6/15/2012 TBD Rio Rancho and 71 Retail Center- Pomona Flor f f f f x7/25/2011 8/4/11 Riverlakes Ranch Community Park Improvments - BakersField8/11/2011 8/22/11 Riverside Ctr 2nd Flr TI - riverside8/24/2011 2/1/12 Rodney Gardens - LA7/1/2011 8/11/11 Rodov - Long Beach

7/26/2011 8/16/11 Rose Bowl Renovation - Pasadena11/9/2011 11/14/11 Rosemead Retail - Rosemead4/25/2012 TBD Rosewood Hotel - Palm Desert Ranjit R F B B X

11/14/2011 11/17/11 Ross Dress 4 Less #1558 - Montebello4/16/2012 Rowland HS Partial Mod - Rowland Heights Ranjit F F F F x

12/21/2011 1/6/12 Royalton - LA4/13/2012 S New Hampshire Ave Multi-Units - Los Angeles BA x x B x x11/6/2011 Saddle Ranch Chop House - Costa Mesa B

Page 15: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

2/27/2012 Saddle Ranch Chop House - Orange B10/29/2012 11/16/2012 Saint John Baptist Church - Oxnard b b b b

10/19/2011 10/25/11 Salley Residence - Yorba Linda11/14/2011 11/23/11 Saloma - Sherman Oaks

10/30/2012 11/8/2012 Sam's Club #4767 - Palmdale F F F F b b b7/7/2012 TBD San Bernardino Industrial Buildings- San Bernardino F F F F F

7/6/2012 TBD San Diego Mixed Use- San Diego F F F F F1/11/2012 San Fernando Community Housing ? ? B F F F F X5/31/2011 6/7/11 Sand Canyon Shooping Ctr Renovation - Santa Clairta6/15/2012 TBD Sandy Lane- San diego Flor f f f f x11/2/2010 12/1/10 Sansei Center - Torrance4/25/2011 TBD Santa Anita Townhouses - Burbank5/15/2012 5/31/2012 Santa Monica HS Design - Santa Monica B x x5/15/2012 Santa Monica HS Design - Santa Monica Ranjit F F F

10/11/2011 Santa Monica Residence x10/11/2011 12/9/11 Santa Monica Residence - Santa Monica12/24/2012 12/30/11 Santa Rita Village - Lompoc B x

11/8/2012 TBD Saticoy Avenue Residential Development - Ventura F F F F F F F x glendale re-bid7/6/2012 7/18/2012 Saturn Orbiter Business Park- Brea F F F F F

6/16/2011 7/6/11 Save our Shelter - Long beach3/12/2012 03/23/12 Savers (Store Remodel & TI) - Riverside F x9/13/2011 TBD SB Bonneau - Santa Barbara6/24/2011 9/30/11 SB Keltner Residence - Santa Barbara7/1/2011 7/8/11 SB Scott - Santa Barbara3/1/2011 3/25/11 Schlosser Residence - Palm Desert7/7/2012 7/20/2012 Science Ctr - Long Beach F F B F F x x x

7/28/2011 8/17/11 Scripps Hospital Phase 2 - Encinitas12/14/2011 12/20/11 Scripps Mercy Hospital - MRI project - San Diego

6/9/2011 6/30/11 Sea Breeze Villas - Carlsbad6/15/2012 6/26/2012 Sears # 1378- Orange Flor f f f f f X4/18/2012 Season 52- Century City Flor B B B X4/25/2012 Season 52- San Diego Flor F F F F B X

12/28/2011 Selma Community Housing Apartments - Los Angeles B x x

Page 16: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

4/26/2012 Sepulveda Ambulatory Care Ctr B200 - North Hills Ranjit F F F F B X8/9/2011 8/22/11 Sepulveda Lofts

12/28/2011 TBD Shafter Parmacy Renovations - Shafter5/22/2012 Sharp Grossmont Hospital - New central energey center - La Mesa Ranjit r F F F b F x

5/10/2012 5/15/2012 Shelyn ES Modernization - Rowland Heights Flor F F F F F F F x6/9/2011 6/30/11 Shi/ Li Custom Residence - Pasadena

4/30/2012 Sierra View District Hospital Laboratory - Porterville Flor F F F F x8/17/2011 9/16/11 Silverado Towing - Indio

11/17/2011 TBD Silverlake Residence - LA10/11/2011 4/16/12 Single Family Residence - Rowland Hights8/31/2011 9/12/11 Sizzler - Sacrmento6/5/2012 6/11/2012 Smart & Final #408- Ontario F F F F F x

11/9/2011 11/17/11 Smohi Science & Tech Bldg8/11/2011 8/15/11 Smugglers Range House Rehab at Channel Island - San Buenaventura6/15/2012 6/20/2012 Social Tap - Ventura ranjit f f x x10/2/2011 TBD Somoa Ave Apartments - Tujunga x

11/28/2011 12/13/11 Sorenson 305k - Santa Fe Springs2/13/2012 2/21/2012 Springhill Suites - Anaheim B x

TBD Springhill Suites - Anaheim x4/30/2012 Springhill Suites - Bossier City Flor B X8/24/2011 9/7/11 Sprouts - La Canada7/11/2011 7/14/11 SSMCI Office TI - Alhambra8/17/2011 8/29/11 St Demetrios Greek Orthodox Church - Camarillo6/24/2011 6/28/11 St Michaels Hospice TI - Tustin3/12/2012 3/22/12 Stacy Middle School - Huntington beach

12/21/2011 1/2/12 Stadium Nissan - Orange7/1/2011 7/5/11 Staples - Anaheim

2/20/2012 2/28/12 Staples - La Harbra7/28/2011 8/9/11 Star Apartments - LA

11/8/2012 11/28/2012 Stonegate I and Stonegate II Apartments - Anaheim F F F F F F F x4/30/2012 5/4/2012 Storage West Office Renovation - Fullerton F x x4/30/2012 Storage West Office Renovation - Fullerton Flor F F F F7/25/2011 9/8/11 Sumerset Commons - Brentwood

Page 17: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

3/28/2012 Sunland Gardens - Sun Valley ? ? B ? ? F F F X2/2/2012 5/11/2012 Sunrise & Zinfandel Retail Pad 1 - Rancho Cardova B B B X6/9/2011 6/28/11 Sunrise at Sterling Canuon Renovation - Valencia2/2/2012 5/11/12 Sunriseand Zinfandel Retail Pad 1 - Rancho Cardova5/8/2012 TBD Sunset Cove Senior Housing - San Bernardino Ranjit F F x5/8/2012 TBD Sunset Cove Sr Housing - San Bernardino B x x

1/24/2012 1/31/12 Surf City Nissan - Huntington Beach9/14/2011 9/27/11 Taavon Residence - Agoura hills7/25/2011 8/3/11 Taco Bell - Irvine4/30/2012 5/10/2012 Taco Bell - San Pedro Flor f F F F B F X4/25/2012 Taylor Yard Apartments- Los Angeles Flor F F F F B X8/19/2011 8/23/11 TD Serivce Finacial TI 4th Flr6/9/2011 6/16/11 Teavana - Temecula7/7/2012 TBD Temescal Canyon Road-Corona F F F F F

6/16/2011 8/18/11 Temple Isreal- Long Beach4/30/2012 TBD Temple St. Multi-Family - Los Angeles F x7/12/2011 8/23/11 Tequesquite Park Improvements - Riverside7/12/2011 7/15/11 Terra Francesco Facility - Ontario4/16/2012 Texton 9 Houses - Sylmar x B x x x4/18/2012 The Burton - Pasadena Flor F F F B B B x4/12/2012 The Courtyard at La Brea - West Hollywood F x2/20/2012 2/23/12 The Marke - Santa Ana2/3/2011 2/7/11 The Mason 16 Unit Project

2/16/2012 The Pearl - Soloano Beach ? ? ? ? x6/15/2012 6/20/2012 The Preserve at Main - Dr Corte Madera ranjit f f f f x11/9/2011 11/10/11 The SG residence - Fullerton

11/22/2011 The Terraces of Los Gatos ? f B f f ? ? x7/12/2011 7/22/11 The Vault - Long Beach4/2/2012 The Whittier Apartments - Los Angeles ? ? B B B B B x

7/12/2011 7/28/11 Thousand Oaks Toyota - Thousand Oaks6/20/2011 7/8/11 Tigertail Residence - LA10/2/2011 10/24/11 Tilden Terrace - Culver City5/31/2011 6/24/11 TJ Maxx - Pasadena

Page 18: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

8/14/2011 8/29/11 TJ Maxx - Sherman Oaks7/20/2011 7/26/11 Todd Cancer Pavilion - Long Beach8/31/2011 9/5/11 Togos - Santa Margarita8/7/2011 8/19/11 Togos - Ventura

8/8/2011 8/16/11 Togos - Westminster10/30/2012 TBD Tom Belle Chevrolet - Redlands F F F F F

4/13/2011 7/12/11 Toyota Dealership Showroom - Torrance12/28/2011 1/19/12 Toys R US - Seal Beach7/18/2011 7/19/11 Travel Traders - Rancho Mairage4/12/2012 Trinity Espiscopal Church School Remodel - Santa Barbara B x

11/11/2010 12/20/10 TS Emporium - City of Industry10/29/2012 TBA TT- Trade - Glendale F F F F

6/6/2011 6/23/11 TV Center Expansion Phase 1 - LA8/29/2011 9/8/11 UC Irvine Chao Comprehensive - Orange3/12/2012 UCLA Landfair & Glenrock Apartments Redevelopment ? ? ? ?7/18/2011 7/20/11 Universal Showroom Repairs4/24/2012 Unocal - Los Angeles ? ? ? x

11/14/2011 12/8/11 USC Bagle - LA11/6/2011 12/21/11 USCA Company - Baldwin Park Redidence - Baldwin Park7/12/2011 7/29/11 UVC Bldg - San Diego9/1/2011 9/20/11 Valencia Chevy - Valencia

5/21/2012 Valencia Grocery Store Ranjit r F F F b F x4/18/2012 Valle Verde Retirement Community - Santa Barbara Flor F F F x8/14/2011 9/6/11 Valley View Retail - Garden Grove7/18/2011 8/9/11 VAPAHCS Mountain View Admin bldg - Mountain View1/18/2012 1/25/12 Vega Residence - Perris

12/21/2011 1/10/12 Verdugo Park Aquatic Facility - Burbank4/2/2012 4/11/2012 Victoria Secret #335 - Westminster x x7/1/2011 7/7/11 Villa Marina Market Place Phase 2 - Marina Del Rey

11/1/2012 11/8/2012 Vineland Commercial - Los Angeles F F6/13/2011 6/29/11 Vivante on the Coast - Costa Mesa

12/28/2011 1/19/12 Volcan Materials - riverside2/16/2012 Vons #2101 - Santa Barbara ? ? B B B B x

Page 19: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

8/31/2011 9/30/11 Vons / Planet Fitness -Inglewood6/15/2012 6/26/2012 W Hotel - Los Angeles ranjit B f f f x8/1/2011 8/5/11 walgreens 12529 - LA

7/12/2011 7/19/11 Walmart #1899 - Riverside7/19/2011 7/22/11 Walmart # 2495 - Westminster8/11/2011 8/22/11 Walnut HS Band Bldg - Walnut5/15/2012 Warner MS- Westminster Ranjit F F F B F x

11/16/2010 11/19/10 Wat Suddhavasa Buddist Meditation Ctr - Riverside10/11/2011 TBD Waterman And Mill Retail2/27/2012 3/20/12 Watson 1062/2/2012 TBD Weisberg Residence - Laguna Beach

9/23/2011 TBD Wentworth apartments - Santa Barbara1/30/2011 2/4/11 Wesrchester bldg 4 Buildout - Moreno Valley3/8/2011 3/25/11 West LA Apartment Prject - LA

12/15/2010 12/17/10 Westair Gases & Equipment - Anaheim12/9/2010 12/14/10 Western Plaza - Gardena10/6/2010 TBD whileshrine Blvd Mixed Use - Santa Monica9/9/2011 9/23/11 Wielenga Medical Bldg. - Downey

2/27/2012 Wienerschnitzel - Jurupa ? ? x7/7/2012 TBD Wilbur Road storage Facility - Thousand Oaks F F F F F

7/6/2012 TBD Willow Lane Animal Hospital-Thousand Oaks F F F F F4/2/2012 Wilshire Blvd Bldg - Beverly Hills B x x4/2/2012 TBD Wilshire BLvd Bldg - Beverly Hills B x

1/18/2012 1/30/12 Wilson Plaza - LA8/17/2011 8/23/11 Wingstop - LA4/25/2012 Wood Ranch Village Center- Simi Valley Flor F F F F1/28/2011 TBD Woodland Hills Residence - Woodland Hills6/15/2012 6/7/2012 Worthington Square- Imperial Flor f B f f f X4/18/2012 WP Carey Housing Development - Pleasanton Ranjit F x4/18/2012 WP Carey Housing Development - Pleasenton B x x7/25/2011 5/22/2012 Xebec Realty Partners Industrial Facility - Chino f f f x11/9/2011 1/5/12 Y Infantry Squad Battle Course8/8/2011 9/6/11 Yale St - Santa Monica

Page 20: Project List (Updated 11 30 12 )BA

Project Check List Updated 6-26-12

4/16/2012 Yale St. Affordable Apartments - Los Angeles Flor F B F F F x2/6/2011 2/11/11 Yorba Linda Medical Ctr - Yorba Linda

5/14/2012 Yulupa ES - Santa Rosa Flor F F F F F F x8/17/2011 8/24/11 Yunes Laundromat - Indio4/16/2012 Zia's Deli - Sacramento BA x x F x F x3/31/2011 4/8/11 Zorada Dr. Residence - LA

Page 21: Project List (Updated 11 30 12 )BA

Civita Apartments #2Florence please make sure to move all project documents in the CBB project folderFlorence please make sure to move blueprints and give my clients accessProject Notes: 11.30.12 - Jessica from Wermers Company is still excepting bid till 12/07/12 5pm send via emailGeneral Contactor: add email [email protected] notes:

Page 22: Project List (Updated 11 30 12 )BA

Project Notes: 11.30.12 - Jessica from Wermers Company is still excepting bid till 12/07/12 5pm send via email

Page 23: Project List (Updated 11 30 12 )BA

Civita Apartments #2See Attached PDF(this is a new project)Florence please make sure to move all project documents into CBB project foldersFlorence please make sure to move the blueprints and give my clients accessFlorence please add [email protected] under the wermers company contact informationProject Notes:

11/29/12 -

Page 24: Project List (Updated 11 30 12 )BA

Florence please add [email protected] under the wermers company contact information

Page 25: Project List (Updated 11 30 12 )BA

OVMC Child Care Center - SylmarSend Addendum NoticeProject Notes: 11.27.12 - Addendum #1 been issued and is ava. In Box. Bid due date has been extended to; Tues 12/04/12 @ 2:00pmChange Bid Due Date to 12/4/12 @ 2pmSend MemoGeneral Contractor: 11.27.12 Add new GC bidding:Cal City Construction : Ph: 562-404-4820 Fx: 562-404-4830

Stongate l and Stonegate ll Apartments - AnaheimSend MemoProject Notes: 11.27.12 - Per Architect GC's negotiator is: R & O ConstructionFlorence please add on upper right hand corner "GC Negoitated

Public Storage #2046 - San DiegoSend Award NoticeProject Notes: 11.27.12 - General Contractor awarded: Eleven Western Builders, Inc. Florence please put on upper right hand corner "GC Awarded"

Fairfield Inn & Suites - NorcoSend MemoProject Notes:Per Tagg Architects owner submitted bid waiting for bank approval. Some changes for "site" required not much of delay, estimates beginning of year

Lululemon Athletica #13021 - Santa BarbaraSee Attached PDF (this is a new project) Florence please make sure to move all project documents into the CBB project foldersFlorence please make sure to move the blueprints and give my clients access

Riverwalk at Reseda- Los AngelesSee Attached PDF (this is a new project) Florence please make sure to move all project documents into the CBB project foldersFlorence please make sure to move the blueprints and give my clients access

Page 26: Project List (Updated 11 30 12 )BA

Project Notes: 11.27.12 - Addendum #1 been issued and is ava. In Box. Bid due date has been extended to; Tues 12/04/12 @ 2:00pm

General Contractor: 11.27.12 Add new GC bidding:Cal City Construction : Ph: 562-404-4820 Fx: 562-404-4830

Per Tagg Architects owner submitted bid waiting for bank approval. Some changes for "site" required not much of delay, estimates beginning of year

Page 27: Project List (Updated 11 30 12 )BA

Renovation of the Personnel Building - TorranceSend MemoProject Note:

11.16.12 - Blueprints and PHL are ava on BoxFlorence please make sure to move the blueprints and give my clients access today thank you

Santa Ana College Repair - Santa AnaFlorence please make sure to move the blueprints and give my clients access

Shop at the Eagle Rock - Eagle RockSend MemoProject Notes: 11/16/12 - Per A.J Padelford still excepting bids till 11/19/12 @ 4:30pm

OVMC Child Care Center - SylmarSee Attached PDF (this is a new project)Florence please make sure to move all docuements to the CBB project foldersFlorence please make sure to move blueprints and give my clients access

Camille La Vie - GlendaleSee Attached PDF (this is a new project)Florence please make sure to move all docuements to the CBB project foldersFlorence please make sure to move blueprints and give my clients access

LDS - Los Angeles Temple Apartments - Los AngelesSee Attached PDF (this is a new project)Florence please make sure to move all docuements to the CBB project foldersFlorence please make sure to move blueprints and give my clients access

El Zocalito Bldgs A,B,C&D - PacoimaSee Attached PDF (this is a new project)Florence please make sure to move all docuements to the CBB project foldersFlorence please make sure to move blueprints and give my clients access

LDS - Los Angeles Temple Apartments - Los AngelesSend Bid CorrectionFlorence - 11/20/12 - please add date due: 11/29/12Florence - 11/20/12 - please add the project address: 10777 Santa Monica Blvd., Los Angeles

El Zocalito Bldgs A,B,C &D - PacoimaSend Bid CorrectionFlorence - 11/20/12 - please add upper righthand corner "GC Negotiated"

Florence did you create CBB project folders and did you move all documents in project folders?

Beswick Senior Apartments - Los Angeles

Page 28: Project List (Updated 11 30 12 )BA

Florence - 11.20.12 - please add this project to "project list"

Vineland Commercial - Los AngelesSend Bid Date ExtendedFlorence - 11.20.12 - Please send to clients that "KPRS" is still excepting bids till 11.28.12 / 5pmFlorence - 11.20.12 - Please change the "due date" to 11.28.12 / 5pm

Page 29: Project List (Updated 11 30 12 )BA

yes maam I moved all the project on CBB projects

Page 30: Project List (Updated 11 30 12 )BA

Fairfield Inn & Suites - NorcoSend MemoFlorence under GC Contacts for Premier Builders Corp add "[email protected]"Project Notes:

11/15/12 - Premier Builders Corp. still excepting bids till 11.19.12 by 5pm, if emailing send to: Jennifer

Shops at Eagle Rock- Eagle RockSee Attached PDF (this is a new project)Florence please give plans to client as I already uploaded them for you.

National Chain Retail Store - Los Angeles CountySend Project CanceledProject Notes:

11/15/12 - Project Cancelled. All GC's listed are not bidding.

Renovation of the Personnel Building - TorranceSee Attached PDF (this is a new project)Florence please make sure to move all project documents to the CBB project folders

Homegoods - Huntington BeachSee Attached PDF (this is a new project)Florence please make sure to move all project documents to the CBB project foldersFlorence please make sure to move the blueprints and give my clients access

Page 31: Project List (Updated 11 30 12 )BA

11/15/12 - Premier Builders Corp. still excepting bids till 11.19.12 by 5pm, if emailing send to: Jennifer

Page 32: Project List (Updated 11 30 12 )BA

Fairfield Inn & Suites - NorcoSend MemoProject Notes: 11.15.12 - Per Premier Builders Corp. is still excepting bids till 11.19.12 5pm, if emailing bid send to Jennifer: ([email protected])

Page 33: Project List (Updated 11 30 12 )BA

Project Notes: 11.15.12 - Per Premier Builders Corp. is still excepting bids till 11.19.12 5pm, if emailing bid send to Jennifer: ([email protected])

Page 34: Project List (Updated 11 30 12 )BA

Florence: Are you sure you are clear on "Highlighting the items on "project list" once work has been done?

Blue Line Trolley Station ImprovementsSend Addendum NoticeProject Notes: 11.12.12 - Per GC bidding: Stacey & Witbeck Inc. Bid Date has been extended 12.14.12Send MemoProject Notes: 11.12.12 - Addendum notices 1 - 6 have been uploaded in Box

Mid-Valley Multi Purpose Ctr - Panorama CitySend Addendum NoticeProject Notes: 11.12.12 - Addendum notices 1-4 have been uploaded in Box

Page 35: Project List (Updated 11 30 12 )BA

11.12.12 - Per GC bidding: Stacey & Witbeck Inc. Bid Date has been extended 12.14.12

Page 36: Project List (Updated 11 30 12 )BA

Duarte High School - DuarteSend Memo:Project Notes: 11/9/12 - confirmed with owner no decision on GC awarded, "blind bid" results within a week.

Florence please change email address for "Visual Glass" new email is: [email protected]

Page 37: Project List (Updated 11 30 12 )BA

Project Notes: 11/9/12 - confirmed with owner no decision on GC awarded, "blind bid" results within a week.

Page 38: Project List (Updated 11 30 12 )BA

Stonegate I and Stonegate II Apartments - AnaheimSee attached PDF (this is a new project)Florece pleas make sure to move all the project documents to the CBB Projects FoldersFlorence please make sure to move the blueprints and give my clients access this needs to get done.

Saddle Ranch - Costa MesaFlorence this is one project in it self. Please correct project title.Florence please remove Dave Love as the contact PM.

El Corazon - Costa MesaFlorence this is one project in it self. Please correct project title.Florence please remove Dave Love as the contact PM.

Saddle Ranch Chop House - OrangeFlorence this is one project in it self. Please correct project title.Florence please remove Dave Love as the contact PM.

Saticoy Ave Residential Development - VenturaSee attached PDF (this is a new project)Florece pleas make sure to move all the project documents to the CBB Projects FoldersFlorence please make sure to move the blueprints and give my clients access this needs to get done.

Etiwanda Freeway Center - OntarioSee attached PDF (this is a new project)Florece pleas make sure to move all the project documents to the CBB Projects Folders

National Chain Retail Store - Los Angeles CountySee attached PDF (this is a new project)Florece pleas make sure to move all the project documents to the CBB Projects Folders

Page 39: Project List (Updated 11 30 12 )BA

Florence please make sure to move the blueprints and give my clients access this needs to get done.

Florence please make sure to move the blueprints and give my clients access this needs to get done.

Page 40: Project List (Updated 11 30 12 )BA

Florence: Please remove #4 Michelson Water Recycling - Laguna Niguel - This job is duplicated in "project list" #11 is correct file name.

Sam's Club #4767 - PalmdaleSend Memo:General Contractor: 11/7/12 - Per Grant General construction, if awarded will be excepting bids 30days from awarded date.

Public Storage - San DiegoSend Memo:General Conrtractor: 11/7/12 Add New GC"s Bidding: AJ Padelford & Sons Inc. Ph: 562.924.3364 / Eleven Western Builders Inc. Ph: 760.796.6346Project Notes: 11/7/12 - AJ Padelford confirmed accepting bids till thursday 11/8/12 / Eleven Western Builders Inc. still excepting bids

Public Storage - San DiegoSend Memo:Project Notes: 11/7/12 - Bidders List ava. On Box

Page 41: Project List (Updated 11 30 12 )BA

Michelson Water Recycling - Laguna Niguel - This job is duplicated in "project list" #11 is correct file name.

General Contractor: 11/7/12 - Per Grant General construction, if awarded will be excepting bids 30days from awarded date.

General Conrtractor: 11/7/12 Add New GC"s Bidding: AJ Padelford & Sons Inc. Ph: 562.924.3364 / Eleven Western Builders Inc. Ph: 760.796.6346Project Notes: 11/7/12 - AJ Padelford confirmed accepting bids till thursday 11/8/12 / Eleven Western Builders Inc. still excepting bids

Page 42: Project List (Updated 11 30 12 )BA

463 Salem Street Multi FamilySend Memo:Project Notes: 11/6/12 - CBB confirmed with architect still in design stage for the next 2mons or so.

Saddle Ranch - Costa Mesa Send Memo:Project Notes: 11/6/12 - Project estimated to complete in December 2012. CBB to confirm current phase in construction.Contact: Project Manager Steve Harmon 714-453-9817

El Corazon - Costa Mesa Send Memo:Project Notes: 11/6/12 - Project estimated to complete in December 2012. CBB to confirm current phase in construction. Contact: Project Manager Steve Harmon 714-453-9817

Saddle Ranch Chop House - Orange Send Memo:Project Notes: 11/6/12 - Project estimated to complete in December 2012. CBB to confirm current phase in construction. Contact: Project Manager Steve Harmon 714-453-9817

Mid-Valley Multi Purpose Ctr - Panorama City Send Memo:Project Notes: 11/6/12 - CBB confirmed bid date has been extended to 11/13/12. GC bidding info: AMG GC Contact: Add: AMG & Associates Fx: 661-251-7405 or email bid [email protected]

Florence please eliminate an email from one of our collaborators; RMS Engineering: delete: ([email protected]) then add: (

Page 43: Project List (Updated 11 30 12 )BA

Project Notes: 11/6/12 - CBB confirmed with architect still in design stage for the next 2mons or so.

Project Notes: 11/6/12 - Project estimated to complete in December 2012. CBB to confirm current phase in construction.Contact: Project Manager Steve Harmon 714-453-9817

Project Notes: 11/6/12 - Project estimated to complete in December 2012. CBB to confirm current phase in construction. Contact: Project Manager Steve Harmon 714-453-9817

Project Notes: 11/6/12 - Project estimated to complete in December 2012. CBB to confirm current phase in construction. Contact: Project Manager Steve Harmon 714-453-9817

Project Notes: 11/6/12 - CBB confirmed bid date has been extended to 11/13/12. GC bidding info: AMG GC Contact: Add: AMG & Associates Fx: 661-251-7405 or email bid [email protected]

Florence please eliminate an email from one of our collaborators; RMS Engineering: delete: ([email protected]) then add: (

Page 44: Project List (Updated 11 30 12 )BA

Florence please take care of the project updates fro 11/1/12 & 10/31/12If you are having issues with the system tell me because you are indicating that you did the work and you didn’t do it correctly

Duarte High School - DuarteFlorence per the project list you indicated that you created the folder and put the blueprints in there. This was not done correctlyFlorence if you have the blueprints why aren't you giving my clients access to them?

Vineland Commercial - Los AngelesSend Reminder To BidAdd "GC Awarded" icon on the rightProject Notes: 11/5/12 - Reminder to bidChange Bid Due Date: 11/9/12

Sam's Club 4767 - PalmdaleSend Addendum:Project Notes: 11/5/12 Addendum 1,2,3,4 have been issued. Bid date has not been extended.

Page 45: Project List (Updated 11 30 12 )BA

If you are having issues with the system tell me because you are indicating that you did the work and you didn’t do it correctly

Florence per the project list you indicated that you created the folder and put the blueprints in there. This was not done correctly

Page 46: Project List (Updated 11 30 12 )BA

Sam's Club #4767 - Palmdale:Send MemoProject Notes: 11/1/12 - Blueprints are now ava. On Box

TT Trade - Glendale: Florence: Please remove Shrader Corp from this project

Marguerite Prkwy - Mission ViejoSend Memo: Project Notes: 11/5/12 - Plans and specs are now ava. On Box.

Sam's Club #4767 - Palmdale:Send AddendumProject Notes: 11/1/12 - Addendum 2-3 has been issued. Bid date has not been extended.

Page 47: Project List (Updated 11 30 12 )BA

Lancaster Marriott Towne Places Suites Send MemoProject Notes: 10/31/12 - Full bidders list is ava. Per the engineer. Blueprints are now avaliable on Box.

Mid-Valley Multi Purpose - Panorama CitySend Addendum Project Notes: 10/31/12 - Addenum 3 has been issued. Bid date has not been extended.

Saint John Baptist Church - Oxnard: Send MemoProject Notes: 10/31/12 - Blueprints are now ava. On Box.

Sam's Club # 4764 - Palmdale: Send MemoProject Notes: 10/31/12 - Blueprints are now. Ava. On Box.

Tom Bell Chevrolet - RedlandsSend MemoProject Notes: 10/31/12 - Blueprints are now ava. On Box.

Duarte Hisgh School - Duarte:Send MemoProject Notes: 10/31/12 - Plan holders list is now ava on Box.

Page 48: Project List (Updated 11 30 12 )BA

Project Notes: 10/31/12 - Full bidders list is ava. Per the engineer. Blueprints are now avaliable on Box.

Page 49: Project List (Updated 11 30 12 )BA

Blue Line Trolley - San DiegoSee PDFSend MemoProject Notes: 10/29/12 - Full bidders list is now uploaded to project folderFlorence please move the bidders list into the blueprint folder

Marguerite Parkway Median Island Civic - Mission ViejoSee PDFFlorence please move the Full Bidders list into the blueprint folder and give clients access

Page 50: Project List (Updated 11 30 12 )BA

FAIRFIELD INN & SUITES - NORCO

General Contractor Add: Magnum Enterprises Ph: 714-828-1191Ph: 714-828-6455

Davis Reed Construction Ph: 858-523-9760Ph: 858-523-9546

Page 51: Project List (Updated 11 30 12 )BA

BLUE LINE TROLLEY STATION IMPROV - SAN DIEGOSee attached PDF

Page 52: Project List (Updated 11 30 12 )BA

Parkside Estates- Huntington BeachSend memoAdd Closed IconProject notes : 8/6/12 Pre John no subs will be need and they will be developing the project themselves.

Science CenterSend memoAdd Sub biding IconProject notes: 8/6/12 Per Roger All trade bids must be in by this week and will be awared soon

Loma Linda Assisted Living - Loma LinaSend memoAdd In ConstrcutionProject Notes: Per PM John all trades open for bid are roofing , Interior glass and mirrors.Bids should be in before or by two weeks

La Quinta Memory Care Ctr - La QuintaSend MemoAdd Closed IconProject Notes: 8/6/12 Per John all trades have be let and job is near compleation

Bella Terra Senior Housing - Morgan HillSend MemoAdd In Construction logoProject Notes: 8/6/12 All trades have been let and the foundation is being poured this week

Carlos Ortega Villas - Palm Desert Send MemoStill In desing not sure if it will go to be built

Page 53: Project List (Updated 11 30 12 )BA

Project notes : 8/6/12 Pre John no subs will be need and they will be developing the project themselves.

Project Notes: Per PM John all trades open for bid are roofing , Interior glass and mirrors.Bids should be in before or by two weeks

Page 54: Project List (Updated 11 30 12 )BA

Rio Rancho and 71 Retail Center- PomonaSend MemoAdd GC AWARED ICONProject notes: 7/27/2012 - Parks Contstruction awareded Gc Per Developer. Working on getting contact information for Parks

Red Maple Village - Residential PortionSend MemoProject notes: 7/27/2012 - Not taking bids yet but you can pre-quilify on their website Kitchell.com

Selma Community Housing Apartments - Los AngelesSend memoAdd GC AwaredProject notes: 7/27/12 Benchmark Construction has been awared GC pre DeveloperAdd In contact information: Benchmark Construction Mark Montia 310-399-1600

Sears # 1378- Orangesend memoUpdate contacts delete Fortnet & Weygandt and On-site from gc list.

Sharp Grossmont Hospital - New central energey center - La MesaSend memoAdd GC awarededProject notes: Kitchell Awared GC

Smart & Final #408- OntarioSend MemoAdd Gc awaredProject notes: 7/27/12 Per arch project has been awared and all trades are full. Construction has started. We will be trying to get information on GC.

Sandy Lane- San diegoSend MemoAdd Sub Bidding

Add Dore Kingham and Lisa Galloway to Contacts

Santa Rita Village - LompocSend MemoAdd Closed Project notes 7/27/12 Per GC this project is closed to all trades.

Savers (Store Remodel & TI) - RiversideSend MemoAdd ClosedProject Notes: 7/27/12 Per Owner project hs been completed

Project notes: Bidders for vertical trades should contact Dore Kingham in our office at [email protected].  Bidders for horizontal trades should contact Lisa Galloway at [email protected].  Grading/demo will start in early September.

Page 55: Project List (Updated 11 30 12 )BA

Social Tap - VenturaSend MemoAdd ClosedAdd Ellis Contracting as GC and Dmitriy Redka as contact 8588645903Project Notes: Spoke to Demitriy he said all trade have been let and they are in construction

Trinity Espiscopal Church School Remodel - Santa BarbaraSend MemoIn construction IconProject Notes: 7/27/12 - Per Bill's assistant all tade have been let and construction is almost complete

Page 56: Project List (Updated 11 30 12 )BA

Project notes: 7/27/2012 - Parks Contstruction awareded Gc Per Developer. Working on getting contact information for Parks

Project notes: 7/27/2012 - Not taking bids yet but you can pre-quilify on their website Kitchell.com

Project notes: 7/27/12 Per arch project has been awared and all trades are full. Construction has started. We will be trying to get information on GC.

Project notes: Bidders for vertical trades should contact Dore Kingham in our office at [email protected].  Bidders for horizontal trades should contact Lisa Galloway at [email protected].  Grading/demo will start in early September.

Page 57: Project List (Updated 11 30 12 )BA

Project Notes: Spoke to Demitriy he said all trade have been let and they are in construction

Project Notes: 7/27/12 - Per Bill's assistant all tade have been let and construction is almost complete

Page 58: Project List (Updated 11 30 12 )BA

Project notes: Bidders for vertical trades should contact Dore Kingham in our office at [email protected].  Bidders for horizontal trades should contact Lisa Galloway at [email protected].  Grading/demo will start in early September.

Page 59: Project List (Updated 11 30 12 )BA

Goudy Honda - AlhambraSend MemoWe can not reach GC. If you are interested in bidding try to contact GC on your own.

Fiat Santa Monica RemodelSend MemoBids due Asap Project note: 7/26/12 All trades are open to bid to Wells construction

Soft demoMilwork, Finish CarpentryCarpet ,Painting, ceramic tile, DrywallAppliancesElectrical

Add Wells Construction to contacts Jack Trucker 916-788-4485 [email protected]

Oak Park Community - Paso RoblesSend MemoAdd GC awared IconProject note: 7/26/12 Roem has been awared the Gc contract for this project.

Ryedell Chevrolet - NorthridgeSend Invite to bidBid due no later then 8/2/12Project note: 7/26/12 All trades are open for biddingAdd Sauers Lopez Consturction to contacts

Ryan Garcia Phone (949) [email protected] Fax (949) 362-0599

Ocean St Commons - Santa CruzSend MemoAdd Closed IconProject note: 7/26/12 All trades are closed at this time and prject is almost complete

Olive Garden #4433 - Culver CitySend MemoAdd GC awared Icon and / Or closed IconProjet notes: 7/26/12 Haley Construction awarded GC. All tradesahve be let and project almost complete

Quinn Caterpillar - IndustrySend MemoAdd GC awared iconPorject Notes: Per Steven at KPRS Oltham has been awared as GC. We are in the process of contacting them but feel free to call yourself aswell.

Page 60: Project List (Updated 11 30 12 )BA

Add Wells Construction to contacts Jack Trucker 916-788-4485 [email protected]

Projet notes: 7/26/12 Haley Construction awarded GC. All tradesahve be let and project almost complete

Porject Notes: Per Steven at KPRS Oltham has been awared as GC. We are in the process of contacting them but feel free to call yourself aswell.

Page 61: Project List (Updated 11 30 12 )BA

LA Marriot Courtyard Residence - LASend MemoAdd In construction"All trades filled excet Stone and Millwork

Lincoln ES - San BernardinoSedn Memo Add GC AwardedAll trades are filled at this time per Project manager Brian

Los Angeles Ave Medical Office Bldg - Simi ValleySend MemoAdd On HoldProject on hold due to funding.

LA Conference & Guest Ctr - Los AngelesSend MemoAdd In Design or Pre biddingSt Chris the arch. Said project is 1 year from bidding

Laboratory Upgrade & Expansion - IndioSend MemoIn design or pre biddingShould be ready for gc bids in the fall still signing on engineer firm

Morro del Mar Senior HousingSend MemoPending fundingStill pending tax credits should be open for bidding by end of the year

Monteray Towers - Santa CruzSend MemoIn ConstructionPer a convesation with PM Eric only trade open is Fire alarm system.

Mc Donalds 40125 - Costa MesaSend MemoInconstruction IconGC awared and in construction - was told to go to job site to find out GC and trades still open

New Vista Transitional Living Center - FullertonSend MemomGC BiddingProject is posted in OC Registar and Has all information On GC and bidding

Ontario Mills Food Court Renovation Send MemoAdd In construction

Page 62: Project List (Updated 11 30 12 )BA

GC awared is VCC contact Joe Vetters for open trades

Page 63: Project List (Updated 11 30 12 )BA

GC awared and in construction - was told to go to job site to find out GC and trades still open

Page 64: Project List (Updated 11 30 12 )BA

Kirkland - PalmdaleSend Memo"Closed"

Hanless Toyota - DavisSend MemoAll trades are open for rebidding

La Cienega Retail Renovation - Los AngelesSend Memo"Closed"

Page 65: Project List (Updated 11 30 12 )BA

Morton Village-Los AngelesSend memoPorject Notes: Bids due 7/19/2012 send bids to [email protected] for their GC bidNo GC awarded yet

The Terraces of Los GatosSend MemoAll trades have been filled

50 Unit Mixed Use - Sherman OaksAdd "In Construction"Send MemoProject Notes :Trades still open wrought Iron, Roofing, drywall, painting, and sheet metal

Carson Housing - Carson Send memoProject Notes: On hold for 3 months till it starts construction all trade are open

Xebec Realty Partners Industrial Facility - ChinoAdd In Construction logoSend MemoProject Notes : 7/19/12 All trades filled excpet Final Clean which wont be filled to closer to end of construction

Green ResidenceSend MemoAdd " In Construction Logo"All trades are filled excpet Painting , Finish carpenty, and Cabinets

Bru Grill Market TI - Lake ForestSend MemoClosed

Carlton Oaks Golf ResortProject note: Design should be finished by 2 weeks and ready for bidding

Camino Nuevo Chater Academy - Los AngelesSend MemoAdd " Closed"Project notes: 7/19/12 : All trades have been filled

Mosaic Gardens - WhittierSend MemoAdd "Closed"Project Notes: 7/20/2012 : All trades filled project is closed

Page 66: Project List (Updated 11 30 12 )BA

Science Cetner - Long BeachSend MemoProject Notes: 7/20/12 Uploaded all new ammendums on yousendit

Donovan House - DowneySend MemoClosed for all trades

Jefferson Blvd ApartmentsSend Memoadd on hold logoProject notes: 7/20/12 per the GC project on hold by developer

Kirklands PalmdaleSend MemoAdd GC AwaredProject nots OakStone Construction awared GC Gary Hammond in charge.Update contact info with Garys Email [email protected]

Decker TI -GoletaSend MemoProject notes: all subcontractors and suppliers selected presently.

Page 67: Project List (Updated 11 30 12 )BA

Porject Notes: Bids due 7/19/2012 send bids to [email protected] for their GC bid

Project Notes :Trades still open wrought Iron, Roofing, drywall, painting, and sheet metal

Project Notes : 7/19/12 All trades filled excpet Final Clean which wont be filled to closer to end of construction

Page 68: Project List (Updated 11 30 12 )BA

Florence do the updates for 7.6.12 first then do these

Science Ctr - Long BeachFlorence I uploaded the plans give the clients access to them

the blueprints is not yet added on my yousendit desktop app maam

Page 69: Project List (Updated 11 30 12 )BA

Goudy Honda - AlhambraFor some reason I could only find the old publisher doc ???Send MemoProject Notes: 6/19/12 - Per architect project is ready for bidding. Contact GC for more

information.

Florence please resend to the invites and blueprints that you sent out yesterday

Florence I kept getting emails from my clients that some of the blueprints they received were empty and I looked at your folder dated 6.15.12 and some of the plans were stillthere….i already moved them but why were they still in your folder?

Florence I changed the email address for Shrader CorpI received a message from Ranjit that you contacted him…….?

Deckers TI - GoletaSend MemoAdd "GC Award" icon on the upper rightProject Notes: 6/25/12 - Per Bob (PM) the only trades left open are window coverings,

acoustical panel, fire extingughers, projection screens, and budget for final clean.

Add to contact info: [email protected] Bob Fierro x 5112 P 805-495-9553

Florence add Clean Pro and Academy Awning to this notice

what was your requestion about Visual Glass email?

Albers Apartments - LASend MemoAdd "In Construction" iconProject Notes: 7/6/12 - Project has broke ground. Developer requesting updated

proposals. Florence check the Project Cover sheet as I deleted and added new subs (see attached pdf)

Manhatten Beach ResidenceSend MemoProject Notes: 7/6/12 - All steel trades have been awarded. New scopes for upcoming

trade will be released soon.

Page 70: Project List (Updated 11 30 12 )BA

Goudy Honda - AlhambraSend MemoProject Notes: 6/19/12 - Per architect project is ready for bidding. Contact GC for more

information.

Florence please resend to the invites and blueprints that you sent out yesterday

Florence I kept getting emails from my clients that some of the blueprints they received were empty and I looked at your folder dated 6.15.12 and some of the plans were stillthere….i already moved them but why were they still in your folder?

Florence I changed the email address for Shrader CorpI received a message from Ranjit that you contacted him…….?

W Hotel - Los Angeles Send "Reminder to Bid"Flornece please give the clients access to the blueprints

Social Tap - VenturaSend "Reminder to Bid"Flornece please give the clients access to the blueprints

Worthington Square- ImperialSend "Reminder to Bid"Flornece please give the clients access to the blueprints

Awnings And Canopies– At Divisions- ChatsworthSend "Reminder to Bid"

Jos. A. Bank- TustinSend "Reminder to Bid"

Blythe Hampton Inn and SuitesSend MemoProject Notes: 6/26/12 -Owners are out of town until 6/27. Unconfirmed if a GC has

been awarded.

Buffalo Wild Wings - Long BeachSend MemoAdd "In Construction" iconProject Notes: 6/26/12 - Glenn from SD Deacon is the PM. Unconfirmed as to current

status of project.

Deckers TI - GoletaSend Memo

Page 71: Project List (Updated 11 30 12 )BA

Add "GC Award" icon on the upper rightProject Notes: 6/25/12 - Per Bob (PM) the only trades left open are window coverings,

acoustical panel, fire extingughers, projection screens, and budget for final clean.

Add to contact info: [email protected] Bob Fierro x 5112 P 805-495-9553

Florence add Clean Pro and Academy Awning to this notice

El Monte Entertainment FacilitySend MemoProject Notes: 6/26/12 - No updates ava. Yet

Family Dollar - South GateSend MemoProject Notes: 6/26/12 - No GC has been awarded yetFlorence please remove E Roane Construction from this notice

Harbor Freight Tools- La MiradaSend "Award Notice"Add "GC Award" icon on the upper rightAdd to project contacts: Marco Contractors P 724-741-0300 F 724-741-0335Project Notes: 6/26/12 -Marco Contractors is the awarded GC. Unconfirmed if trades

are still open.

Henry Mayo MOB1 - ValenciaSend Award NoticeProject Notes: 6/26/12 - Unconfirmed if trades are all let.

4/2/12 - Intertex is the awarded GC.

Corner Bakery - RedlandsSend MemoAdd "In Construction" iconProject Notes: RC Pacific is the GC. Fred W. is the PM. Email him to confirm if your

trade is still open

Trinity Espiscopal Church School Remodel - Santa BarbaraSend MemoAdd "In Construction" iconProject Notes: 6/26/12 -unconfirmed which trades are still open or phase of construction

Covington Hills - Ladera RanchSend MemoBid Due: 7/18/12 @ 5pmAdd GC Award Icon on the upper rightProject Notes: 7/5/12 - Per Gary the project is now ready for final bid. Estimated

Page 72: Project List (Updated 11 30 12 )BA

construction start date is Sept. 2012. Make sure to note that you are a CBBmember. Blueprints will be avaliable shortly.

Casita Zen - AlhambraSend MemoProject Notes: 7/5/12 - Per BuildingWorx no GC has been awarded yet. Project delayed

due to owner.

Wienerschnitzel - JurupaSend MemoProject Notes: 7/5/12 - Per owner city approval will be determined by next week

Page 73: Project List (Updated 11 30 12 )BA

Marconi Self Storage Center- SacramentoSee attached PDF

Mental Health 14th St Office TISee attached pdf

Casita Zen - AlhambraSend MemoProject Notes: 6/15/12 - Per SBI no GC has been awarded yet. Owner is not accepting new GC

bids either.

A & R Wholesale - AnaheimSend "Award Notice"Add GC Award icon on the rightProject Contact Add: Clarion Construction P 909-598-4060

Bruce (PM)Project Notes: 6/15/12 - Clarion is the awarded GC. Unconfirmed with Bruce if trades are still

open.

Wienerschnitzel - JurupaSend MemoProject Notes: 6/14/12 - Per owner still pending with the cityFlorence add Shrader Corp / Glenn Chavez Construction / Tyushia Construction / SR Construction

to this project noticeFlorence remove Pride Roofing from this notice

Wilshire BLvd Bldg - Beverly HillsSend MemoProject Notes: 6/15/12 - Per Daniel the project is in revisions. Owner will be hiring subs directly

Civil Engineers and Landscape architect are still open to send qualifications.Florence please add Savage Land Design / Shrader Corp / Glenn Chavez Construction

SR Construction to this project notice

Vons #2101 - Santa BarbaraSend "Project Closed"Project Notes: 6/15/12 - Per new PM all trades are now let

Valencia Grocery Storesend MemoProject Notes: 6/13/12 - Per Wesfield this project is on temp. hold. CBB to follow up in 2 weeksFlorence add Shrader Corp / Riveria Developemnt / Tyushia Construction / SR Construction

to this project notice

Page 74: Project List (Updated 11 30 12 )BA

Taco Bell - San PedroSend MemoProject Notes: 6/13/12 - Per Magnum no GC has been awarded yetFlorence please add Shrader Corp to project noticeFlorence please remove Pride Roofing

Taylor Yard Apartments- Los AngelesSend MemoProject Contacts ADD Email: [email protected] notes: 6/15/12 - New email address addedFlorence add Shrader Corp / Glenn Chavez Construction

Capelin Distribution Center - Los Angeles (2011 Project)Send MemoPut the "In Construction" icon on the upper rightProject Notes: 6/13/12 - KPRS is the awarded GC.

Carson HousingFlorence please create the publisher doc for this one using the previous information I uploaded

on the project folderSend MemoPut the "In Construction" icon on the upper rightProject notes: 6/15/12 - Per Rich the project has started the site work. All trades are still open

for CBB members interested in biddingFlorence please give subs access to the plans I already uploaded them

Bldg GG Student Services Design/Build - Long beachSend MemoBid Due: 7/20/12 @ 2pmProject Notes: 6/13/12 - Per college all architects, engineers, designers and sub-contractors

interested in bidding this project should bid to the 3 GC's bidding.Florence please add shrader corp and glenn chavez construction

Oakview Dr Apartments Send MemoProject contacts add: McCook Construction P 805-384-9800

PacWest Builders P 805-955-9158Project Notes: 6/15/12 - Per the developer full bidders list is providedFlorence please add shrader corp and glenn chavez construction

Page 75: Project List (Updated 11 30 12 )BA

Four Detached Homes - Temple CitySend MemoPut the "In Construction" icon on the upper rightProject Notes: 6/10/12 - Per Sean in lathing stage. Previous listed trades are still open.

Contact Sean as soon as possible to confirm you will be bidding. Make sure to notethat you are a CBB Member

Florence please add glenn chavez construction

Season 52- San DiegoSend MemoProject Notes: 6/15/12 - Tim is the PM for this project. Extension 229Florence please add shrader corp and glenn chavez construction

Season 52- Century CitySend "Reminder to Bid"

Barker Block Bldg 5 & 6 - Los AngelesSend MemoProject Notes: 6/15/12 - Project has come back to term. Final 2 GC's are Hopkins and RCI.

GC is scheduled to be awarded next week.

Green St Apartments - PasadenaSend MemoProject Notes: 6/15/12 - Per Ken he is submitting his final number today. There will be another

sub bid round. CBB to follow upFlorence please add shrader corp and glenn chavez constructionFlorence please remove Pride Roofing

Four Seasons Mall - TechacpiSend MemoProject Notes: 6/15/12 -Per Ken this project is on temp. hold. CBB to follow up

Dos Lagos - CoronaSend "Project Closed"Project Notes: 6/15/12 - Per Ken all trades have been let

Guppy House Restaurant - Temple CitySend MemoPut the "In Construction" icon on the upper rightProject Notes: 6/15/12 - Project is currently under construction. Contact Shawn to confirm

if your trade is still open. Make sure to note that you are a CBB Member

Page 76: Project List (Updated 11 30 12 )BA

Fontana Truck StopSend MemoProject Notes: 6/15/12 - No trades have been let yet. Ok to submit. Florence add Shrader corp to this noticeFlorence remove E Roane Construction / Pride Roofing from this notice

Page 77: Project List (Updated 11 30 12 )BA

Florence add Shrader Corp / Glenn Chavez Construction / Tyushia Construction / SR Construction

Page 78: Project List (Updated 11 30 12 )BA

Florence im not sure if you did the updates for 6.12.12 so just in case if you didn’t please do .thank you

Temple St. Multi-Family - Los AngelesSend MemoProject Notes: 6/13/12 - Per owners rep the architect is already selected. Owner will hire

subs directly.

The Courtyard at La Brea - West HollywoodSend " Bid Correction"Add the In Construction icon on the header rightChange the Project to: Private Prevailing WageProject Notes: 6/13/12 - Per Ed the project is currently in construction. Most trades have been let

email to confirm if your trade is still open. Project is prevailing wage.Project Contacts Add Email Address: [email protected]

Courtyard at Mandaly Bay - OxnardSend MemoProject Notes: 6/13/12 -Per Yvette no updates ava. Yet.Florence remove Integrity Inspection Solutions / Pride Roofing from this noticeFlorence add Shrader Corp / Glenn Chavez Construction

Yale St. Affordable Apartments - Los AngelesSend MemoProject Contacts Add Email Address: [email protected] Notes: 6/13/12 - Per Rich not all trades are open. Email to confirm if your trade is open.

Drywall just closed. Looking into finishes.Florecen add Clean Pro to this notice

Page 79: Project List (Updated 11 30 12 )BA

Project Notes: 6/13/12 - Per Ed the project is currently in construction. Most trades have been let

Page 80: Project List (Updated 11 30 12 )BA

Florence please correct Glenn Chavez Construction Email address the correct is: [email protected]

Manheim Auto Auction- RiversideSend MemoProject Contacts Add:

Forza Construction P 661-755-3785Cass Construction P 951-837-2102 F 951-837-2105Quality Asphalt Maintenance P 951-942-1664 [email protected] Construction P 702-877-6111 F 702-258-6326 SR Construction P 888-501-1005 F 818-584-8919 (CBB Member)

Michael KnaptonProject Notes: 6/12/12 - FBL per owners rep. Owner is accepting additional GC Bids. Contact

Michael form Kimley-Horn.Add to Trades: General ContractorFlorence add Riviera Development & Tyshuia Construction to this project notice

CDM Enclave- Newport BeachSend MemoProjct Notes: 6/12/12 - Plan Holders list has been uploaded to project folderProject Documents: PHL: Uploaded 6.12.12

Redlands Distribution Ctr - Bldgs 9 & 10Florence I already uploaded the plans please give clients access

Morro del Mar Senior HousingSend MemoProject Notes: 6/12/12 - Per architect project is pending city tax credits. Projected 6 months out.

Harbor Freight Tools- La MiradaSend MemoProject Contacts Add:

Marco Contractors P 724-741-0300 F 724-741-0335

Project Notes: 6/12/12 - New GC Bidder confirmedFlorence make sure to correct Glenn Chavez / Academy Awning / Visual Glass email addresses

Hampton Inn- San DiegoSend MemoProject Contacts Add:

Summit Builders P 949-486-4550 F 949-486-4555

Owners Rep: Kimley-Horn P [email protected]

Page 81: Project List (Updated 11 30 12 )BA

Driver Urban P 949-261-5100 F 949-261-5167Project Notes: 6/12/12 - Additional GC Bidders confirmed. Per Developer the first round of

GC Bidding ends 6/27/12 at which time will determine if new GC bidders will beallowed to submit.

Florence add Riviera Development / Tysuchia Construction to this project noticeFlorence make sure to correct Glenn Chavez / Academy Awning / Visual Glass email addresses

Marconi Self Storage Center- SacramentoSend MemoProject Notes: 6/12/12 - Owner will be confirming full bidders list shortly.

Page 82: Project List (Updated 11 30 12 )BA

Florence did you update the email address for Visual Glass? Im showing all the updates you sent out yesterday came back bounced.

maybe I forgot to chage the email address when I send it maam sorry.. I have already updated my list maam :)

Florence please update your membership list and Ranjit for Academy Awning:New email address is michael@ academyinc.com

Florence check the spam folder under bidnotice1 and upload all the publisher docs that ranjit did to the correct project folder. Then delete the email from the spam folder. Thank you(why is this in green?) maybe I was mistaken chosing a color it was a simple accident maam :)

Florence just in case whenever I tell you to remove or add someone to the project notices please updatethe Project Cover excel sheet so we can keep an updated record of who is working on the projectand all the dates we send out notices. Thank you yes maam I will :)

Ball & Torrance - Torrance6/7/12 - Florence I got a compliant from my clients that the updated plans were not downloaded

I thought you downloaded them from the link I forwarded you? I downloaded thistoday and already uploaded it. And I checked Shrader corp was not added to the notice? (I already added him)

oh I forgot to tell you about this maam, you did not send me the link on this blueprint maam.. Sorry..

Hampton Inn- San DiegoSend MemoGeneral Contractor Add: Lusardi Construction P 760-744-3133 F 760-744-9064

Tyler Molesworth x 1280Florence remove E Roane Construction from this project notice.

Harbor Freight Tools- La MiradaFlorence remove E Roane Construction from this project notice.

Carl’s Jr. #103- IrvineFlorence remove E Roane Construction from this project notice.

PS Culver City RestaurantFlorence remove E Roane Construction from this project notice.

KTLA Studio RedevelopmentFlorence remove E Roane Construction from this project notice.

Page 83: Project List (Updated 11 30 12 )BA

Marconi Self Storage Center- Sacramentosee attached Pdf

Mental Health 14th St Office TISend MemoProject Notes : 6/6/12 - Blueprints are now ava.Project Notes: 6/6/12 - Blueprints are now ava. Via yousenditFlorence delete the icon for request blueprints and the text message that goes with itProject Documents: Blueprints Uploaded: 6-6-12Florence I already uploaded the plans please give my clients Florence please remove Randall steel from this project notification

Redlands Distribution Ctr - Bldgs 9 & 10Send MemoAdd under Contacts:

Fullmer P 909-947-9467Millie & Severson P 562-493-3611KPRS P 714-364-6620

Project Notes: 6/11/12 - Blueprints are currently being downloaded. Full bidder list now providedper the owners rep

Florence please remove the GC Awared Icon from the upper right hand corner

Page 84: Project List (Updated 11 30 12 )BA

Project Notes: 6/11/12 - Blueprints are currently being downloaded. Full bidder list now provided

Page 85: Project List (Updated 11 30 12 )BA

Florence please update your membership list and Ranjit for Visual Glass the new email address is

Florence check the spam folder under bidnotice1 and upload all the publisher docs that ranjit did to the correct project folder. Then delete the email from the spam folder. Thank you

Pioneer High School - WhittierWhere is the publisher doc for this one?Send MemoProject Notes: 6/6/12 - Plan holders list is now uploaded to project folderProject Documents: Job Walk Sheet: Uploaded 6.6.12Florence I already uploaded the plans please give the clients access

Smart & Final #408- OntarioSend MemoProject Notes : 6/6/12 - Blueprints are now ava.Project Notes: 6/6/12 - Blueprints are now ava. Via yousenditFlorence delete the icon for request blueprints and the text message that goes with itProject Documents: Blueprints Uploaded: 6-6-12Florence I already uploaded the plans please give my clients Where is the publisher doc for this one?

Hampton Inn- San DiegoFlorence I forwarded you the link to the plans for this one please download, upload and give

clients accessSee attached pdfSend MemoProject Contacts: ICE Builders P 714-491-1317 F 714-333-9700Project Notes: 6/6/12 - Blueprints are now ava. Via yousendit. Additional GC confirmedFlorence delete the icon for request blueprints and the text message that goes with itProject Documents: Blueprints Uploaded: 6-6-12

Mental Health 14th St Office TISee attached pdfFlorence here is a new task for you for this project. Click on this link. Find this project. Click on

view project details. Click on the Sign In Sheet folder. Download both docs and uploadthem in the blueprint folder on yousendit for this project.please also upload them in Mary's folder on yousendit

Send MemoProject Notes: Job walk sign in sheet now ava in project folderProject Documents: Job Walk Sheet: Uploaded 6.6.12

Ball & Torrance - Torrance

[email protected]

http://dfs.aandirepro.com/DFSTheme/ProductSearch.aspx

Page 86: Project List (Updated 11 30 12 )BA

Florence I forwarded you the link to the plans for this one please download, upload and giveclients access

Send MemoProject Notes: 6/6/12 - Blueprints are now ava. Via yousenditFlorence delete the icon for request blueprints and the text message that goes with itProject Documents: Blueprints Uploaded: 6-6-12

PS Culver City RestaurantSend MemoProject Notes : 6/6/12 - Blueprints are now ava.Project Notes: 6/6/12 - Blueprints are now ava. Via yousenditFlorence delete the icon for request blueprints and the text message that goes with itProject Documents: Blueprints Uploaded: 6-6-12Florence I already uploaded the plans please give my clients

Carl’s Jr. #103- Irvine not availablecheck the website of all the GC's bidding this project and see if any of them have the blueprints

to this project posted on their website. If they do please download, upload and give the clients access

Xebec Realty Partners Industrial Facility - Chinosee attached pdf

Hampton Inn- San DiegoSend Addendum NoticeHeader "Addendum"Project Notes: 6/6/12 - Addendum 2 issued. Bid date not extended

Page 87: Project List (Updated 11 30 12 )BA

Member List updated:I added another email address for Shrader Corp. please send projects to both

Sunland Gardens - Sun ValleySend MemoProject Notes: 6/5/12 - Per Vince the field PM had turned down bids due to an overabundance

of them. Drywall, stucco and paint will be reviewed today and awarded by this Fri.Trades still needed are windows, sliders, finish carpentry, doors and hardware anda budget number for final clean up.

The Whittier Apartments - Los AngelesSend MemoProject Notes: 6/4/12 - Per Todd all major trades have been let. Open for the following trades:

Appliances / Fire Sprinkler D&B / Countertops / Final Clean Budget / Toilet accessoriesCustom woodwork / Caulking & Sealants. Note this is a prevailing wage project.Make sure to note that you are a CBB Member.

Florence add Interior & Exterior design / Nabers Stone to this notice. Florene remove Pride Roofing & Construction / Risha Engineering / E Roane Construction from

this notice

Green Residence - Long BeachFlorence you sent this update yesterday but you sent it for the wrong project. Please redo but

for this project not the "Green St Apartments". And also send a correction notice

for the "Green St Apartments" that the memo was incorrect.Send MemoProject Notes: 6/4/12 - Per Jason the following trades are closed: Framing / Pool / Elevator /

Concrete / HVAC / Electrical / Plumbing / Solar. All remaining trades are open for bidding. Jason indicating delays have been due to owners lack of involvement. Make sure to note that you are a CBB Member.

Please add Glenn Chavez Construction / Agoura Sash & Door to notificationsPlease remove Interior & Exterior Designs / DSP Electric / Pride Roofing / Randall Steel

Lyons Park - Buena ParkSend MemoGC Award logo on right of headerProject Notes: 6/5/12 - Per Claudio will project is about to be closed out but still needs the

following subs: Drywall / Concrete and final clean budget. Final close out is this Friday.

Florence add Shrader Corp / Glenn Chavez Construction to this notice.Florence remove E Roane Construction / Pride Roofing & Construction from this notice

Ralphs 222 - Sherman OaksSend Memo

Page 88: Project List (Updated 11 30 12 )BA

Project Notes: 6/5/12 - Per Reid all trades have been let except for: Insulation / Waterproofing /Budget for final clean up. Project just started demo this week. Make sure to note thatyou are a CBB Member

Ball & Torrance - TorranceSend MemoProject Notes: 6/5/12 - Per Greg the following trades have been awarded: Roof / Structural

steel / concrete / plumbing / grading. All other trades are open for serious biddersincluding concrete pour. CBB is waiting for electronic blueprints.

Florence please remove Pride Roofing & Construction / Westcoast waterproof from this bidFlorence please add Shrader Corp / Glenn Chavez Construction to this notice

Four Detached Homes - Temple CitySend MemoAdd "In Construction" icon to the right of the headerProject Notes: 6/5/12 - Per Sean the following trades are still needed: painting / ironworks /

vinyl and wood fencing / landscaping / onsite storm drains / garage doors / wood stair handrails and final clean up. Make sure to note that you are a CBB MemberProject is currently in lathing

Florence please remove Interior & Exterior Designs / Pride Roofing from this noticeFlorence please add Glenn Chavez Construction

Red Maple Village = Residential PortionSend MemoProject Notes: 6/5/12 - Per Wava they are still accepting applications for architects / engineers /

General Contractors via their website. Fill out the pre-qualification form and submit

Season 52- San DiegoAward NoticeAdd the GC Award icon on the right headerProject Contacts Add: RD Olson Construction P949-474-2001 F 949-474-1534Project Notes: 6/5/12 - Morrissey is the awarded GC. Contact Tito x 229 (PM) to confirm if your

trade is still ava.Florence please add Clean Pro to this notice

Season 52- Century CityMemoAdd GC Award icon to right of headerProject Notes: 6/5/12 - Parkway has been awarded the contract. Contact Jared directly to confirm

if your trade is still openFlorence please add Glenn Chavez Construction / Clean Pro / Shrader Corp / PK Plumbing

Page 89: Project List (Updated 11 30 12 )BA

Florence please remove Pride Roofing / I already uploaded the plans please give the clients accessCreate an excel "cover sheet" for this project and upload to the project folder

Springhill Suites - AnaheimSend MemoProject Notes: 6/5/12 - NO GC has been awarded yet. Florence please add Shrader Corp / Glenn Chavez Construction to this noticeFlorence please remove Pride Roofing from this noticeSee attached pdf that I need you to re-create on excel and add to project folder

Sierra View District Hospital Laboratory - PortervilleSend MemoProject Notes: 6/5/12 - Per Jeanie the project is not ready yet to accept GC qualifications. CBB

to follow up in 2 months.Florence please add Intergrated CMSFlorence please remove about Integrity Inspection Solutions / Pride Roofing

S New Hampshire Ave Multi-Units - Los AngelesSend MemoProject Notes: 6/5/12 - Per Thomas there has been no changes in the project status. CBB to

follow up next month.Florence please add Shrader Corp / Glenn Chavez Construction to this noticeFlorence please remove about Integrity Inspection Solutions / Pride Roofing

Page 90: Project List (Updated 11 30 12 )BA

Appliances / Fire Sprinkler D&B / Countertops / Final Clean Budget / Toilet accessories

Page 91: Project List (Updated 11 30 12 )BA

wood stair handrails and final clean up. Make sure to note that you are a CBB Member

Project Notes: 6/5/12 - Parkway has been awarded the contract. Contact Jared directly to confirm

Page 92: Project List (Updated 11 30 12 )BA

Updates 6.4.12

New Member added to member list

Antico Pizza Napoletana - Los AngelesSend MemoProject Notes: 6/4/12 - SR is still in running with owner. A GC wil be awarded this week.

Carlton Oaks Golf Resort - SanteeSend MemoProject Notes: 6/4/12 - Per Taylor the blueprints are still going thru design and another set

will be issued shortly. Subs are currently bidding by option.

Behavioral Health Unit - Santa CruzSend MemoHeader "Addendum"Project Notes: 5/18/12 -Addendum 4 has been issued and uploaded to YouSendIt. Bid date not

extended.Project Documents:

Add 4: Uploaded 5.16.12

Casita Zen - AlhambraSend MemoNew Bid Date: 5/25/12 @ 5pmProject Notes: Per BuildingWorx they are accepting proposals until 5/25/12.Please add Glenn Chavez and Shrader Corp to the notice, excel sheet and on blueprints

San Fernando Community HousingSend MemoProject Notes: 6/4/12 - Per Hank currently finishing underground work for plumbing. All

remaining trades are still open for bidding. Please add Glenn Chavez and Shrader Corp to the notice, excel sheet and on blueprints

Protasevich Residence - Pacific PalisadesSend MemoFlorence you will need to re-create publisher doc please see attached pdfProject Notes: 6/4/12 - Owner is currently going thru funding with network finance groups.Please add Glenn Chavez and Shrader Corp to the notice, excel sheet and on blueprints

Page 93: Project List (Updated 11 30 12 )BA

La Quinta Memory Care Ctr - La QuintaSend MemoProject Notes: 6/4/12 - Blueprints are now ava. All trades are about to be let. Contact GC to

confirm if your trade is still open and to confirm how much time you have to bid.Make sure to note that you are a CBB Member.

Florence I already uploaded the plans please give all correct subs access to them

Jefferson Park Terrace-Los AngelesSend MemoProject Notes: 6/4/12 - Per Sam trades are still open but time is limited. Please add Glenn Chavez and Shrader Corp to the notice, excel sheet and on blueprintsRemove The Cutting Edge from the notices for this project

The Burton - PasadenaSend "Reminder to Bid"Add Glenn Chavez Construction to the notice

Green Residence - Long BeachSend MemoProject Notes: 6/4/12 - Per Jason the following trades are closed: Framing / Pool / Elevator /

Concrete / HVAC / Electrical / Plumbing / Solar. All remaining trades are open for bidding. Jason indicating delays have been due to owners lack of involvement. Make sure to note that you are a CBB Member.

Please add Glenn Chavez Construction / Agoura Sash & Door to notificationsPlease remove Interior & Exterior Designs / DSP Electric / Pride Roofing / Randall Steel

Page 94: Project List (Updated 11 30 12 )BA

Revere MS - Los AngelesSend MemoProject Notes: 5/11/12 - Plan Holders List is not avaliable yet. CBB is downloading full set

and will send notification once plans are avaliable.Florence please go to this site and download the blueprints. This needs to be done page by

page. Then upload it and give clients access

Behavioral Health Unit - Santa CruzBlueprints have been uploaded please give clients access

Antico Pizza Napoletana - Los AngelesSend MemoRemove the GC Awarded icon on the right of the pageProject Notes: 5/10/12 - JD Group is not the awarded GC. CBB will contact owner to confirm

bidders list. Blueprints are being uploaded to YouSendITFlorence I uploaded the plans already please give my clients access

Cliffhouse Restaurant - La QuintaSend MemoRemove the GC Awarded icon on the right of the pageProject Notes: 5/10/12 - JD Group is not the awarded GC. CBB will contact owner to confirm

bidders list. Blueprints are being uploaded to YouSendITFlorence I uploaded the plans already please give my clients access

Sunland Gardens - Sun ValleySend MemoProject Notes: Vince will be confirming directly with the owner as to which trades are still open

All Subs to submited a proposal please forward your bid to CBB to make sure thatyour bid was received by the owner as the Onsite Foreman may not have forwardedit thru.

Antico Pizza Napoletana - Los AngelesSend MemoGeneral Contractor: SR Construction 888-501-1005 818-584-8919

Sami R. [email protected] Notes: 5/15/12 - SR has been authorized by the owner to bid this project. A jobsite visit

will be scheduled. SR is also a CBB Member. Make sure to submit as soon as possible

Jefferson Park Terrace-Los AngelesSend MemoProject Notes: 5/15/12 - Per Sam all trades are still open. Will take new proposals. Make sure

to note that you are a CBB Member.

Click on This for Blueprints

Page 95: Project List (Updated 11 30 12 )BA

Cont. Below

The Burton - PasadenaSend MemoProject Notes: 5/15/12 - Per Arnold some trades are still open. Will email a confirmation of

which trades are still open. Make sure to note that you are a CBB Member.

Ball & Torrance - TorranceSend MemoNew Bid Date: 5/22/12 @ 2pmProject Notes: 5/15/12 - Full set has been released. New bid date set. Plans are already uploaded

to yousendit.Project Documents Add:

Upd. Set Uploaded: 5/15/12Florence I already uploaded the updated set on YouSEndItPlease add Glenn Chavez to the notice, excel sheet and on blueprints

Ralphs 222 - Sherman OaksHeader: Reminder To Bid (Florence just change the header from Memo to Reminder To BidFlorence please also add HVS Plumbing to the notice and on the excel sheet

Lyons Park - Buena ParkSend MemoNew Bid Date: 5/15/12 @ 5pmProject Notes: Per Claudio not publicly accepting bids but will take some new ones. This Friday

is the closing of all trades. Make sure to note that you are a CBB MemberPlease add Glenn Chavez to the notice, excel sheet and on blueprints

Sharp Grossmont Hospital - La MesaPlease add Glenn Chavez to the notice, excel sheet and on blueprints

Los Angeles PediatricsPlease re-add Glenn Chavez to the notice, excel sheet and on blueprints with the correct email

addressPlease add and send ICMS the project invite and add them to the excel sheet

Loews Hotel - Santa MonicaPlease re-add Glenn Chavez to the notice, excel sheet and on blueprints with the correct email

address

[email protected]

Page 96: Project List (Updated 11 30 12 )BA

Cont. Below

Bakersfield Memorial HospitalI uploaded the plans please move them to the right folder and give clients accessPlease re-add Glenn Chavez to the notice, excel sheet and on blueprints with the correct email

address

Valencia Grocery StorePlease re-add Glenn Chavez to the notice, excel sheet and on blueprints with the correct email

address

Fontana Truck StopI already uploaded the plans to your folder. Please move them and give the clients accessPlease re-add Glenn Chavez to the notice, excel sheet and on blueprints with the correct email

addressSend MemoProject Notes: 5/15/12 -Blueprints have been uploaded to YouSendIt

Deckers TI - GoletaI already uploaded the plans to your folder. Please move them and give the clients accessPlease re-add Glenn Chavez to the notice, excel sheet and on blueprints with the correct email

addressSend MemoProject Notes: 5/15/12 -Blueprints have been uploaded to YouSendIt

Cliffhouse Restaurant - La QuintaYou transferred the plans last week why didn’t you give the clients access?

New Vista Transitional Living Center - FullertonSend MemoProject Notes: 5/15/12 - Per CM this project is in early stages. CBB to follow up in 1 month.Please re-add Glenn Chavez to the notice, excel sheet with the correct email address

Multi-Tenant Retail - Thousand OaksFlorence please go on bidmail download, upload and give clients accesssend out invite see attached pdf

Page 97: Project List (Updated 11 30 12 )BA

Project Notes: 5/15/12 - Full set has been released. New bid date set. Plans are already uploaded

Header: Reminder To Bid (Florence just change the header from Memo to Reminder To Bid

Page 98: Project List (Updated 11 30 12 )BA

Palm Ave Development - Imperial Beach (did you do this?)Send MemoProject Notes 5/8/12 - Per Krystal the trades have not been let but will be very soon. Call ]

to confirm if your trade is still open.I also uploaded the blueprints in your transfer folder please move and give my clients access

Oak Park Community - Paso RoblesSend attached pdfI added more clients to the list so make sure to also give them access to the plans

Check the attachments in the Spam Folder and add the publisher docs Ranjit did to the correct Project Folder on YouSendIt.

Plaza Community Services - GC NoticeSee uploaded document in your transfer folderfinish the links at the bottom and email this notice to:

Tyschuia Construction / Riviera Development / The Cutting Edge

Mosaic Gardens - WhittierSend MemoChange to Private ProjectProject Notes: 5/10/12 -Per Brett this is a PRIVATE PROJECT no prevailing!

Playa Vista Community Center - Playa VistaSend MemoUnder Contacts Add:TG Construction P 310-321-5913 F 310-640-2907Fassberg 818-386-1800 818-784-5600 [email protected] Notes: 5/10/12 - Per the developer this is the full bidders list. Per the developer

Fassberg has a higher chance to be awarded

Shelyn ES Modernization - Rowland HeightsYou uploaded the plans please give the clients access Im sendin you the project info

Central Park Village - BreaSend MemoProject Notes: 5/10/12 - Per the architect passed planning commission but still in entitlements

Architect is open to new engineers. Make sure to note that you are a CBB Member

Page 99: Project List (Updated 11 30 12 )BA

Blythe Hampton Inn and SuitesSend MemoNew Bid Date : 5/31/12 @ 2pmProject Notes: 5/8/12 - Per Riviera Development (CBB Member) the bid date has been extended

due to updated set of plans. CBB to confirm dated set. Make sure to note to Rivierathat you are also a CBB Member.

Somoa Ave Apartments - TujungaI already made the changes and added the notes to the publisher doc just fix the links at the

bottom and send to correct list of clientsBlueprints are uploaded just move them into the correct place but do not give clients access

Oakview Dr Apartments See attached pdfsend out project to clientsdownload plans & Upload from bidmail.comgive clients access

Oakview Dr Apartments See attached pdfsend out project to clientsdownload plans & Upload from bidmail.comgive clients access

Playa Vista Community Center - Playa VistaSee attached pdfsend out project to clientsdownload plans & Upload from bidmail.comgive clients access

Page 100: Project List (Updated 11 30 12 )BA

Updates 5/8/12

Bakersfield Senior Housing - BakersfieldSend MemoProject Notes: 5/8/12 - Per the GC all trades are closed.

Carlos Ortega Villas - Palm Desert Send MemoProject Notes: 5/8/12 - Per the architect this project is not ready yet for inquires or bidding.

CBB to follow up.

Taco Bell - San PedroSee document in pdf make nescessary changes to publisher docSend MemoProject Notes: 5/8/12 - Additional GC Bidders confirmed

Mosaic Gardens - WhittierSend MemoProject Notes 5/8/12 - Addendums 1-5 documents have been uploaded to YouSendIt

Boardwalk Fresh Burgers & Fries - GC NoticeSee uploaded document in your transfer folderfinish the links at the bottom and email this notice to:

Tyschuia Construction / Riviera Development / The Cutting Edge

Palm Ave Development - Imperial BeachSend MemoProject Notes 5/8/12 - Per Krystal the trades have not been let but will be very soon. Call ]

to confirm if your trade is still open.I also uploaded the blueprints in your transfer folder please move and give my clients access

Progressive Regional Claims Office-PasadenaSend MemoGC Contacts Add:

Swinerton Builders P 213-896-3462 F 213-896-0027New Bid Date: 5/10/12 @ 12pmProject Notes: New GC bidder confirmed. Bid date extended. Owner is not releasing bidders

list. Asbestos report has been uploaded to YouSendIt

Progressive Casualty - GC NoticeSee uploaded document in your transfer folder

Page 101: Project List (Updated 11 30 12 )BA

Updates 5/8/12

finish the links at the bottom and email this notice to:Tyschuia Construction / Riviera Development / The Cutting Edge

San Fernando Community HousingSend MemoProject Notes: 5/8/12 - Per Hank all trades from Mechanical to completion are open. Will

be awarding as construction progresses. Currently starting rebar and pad footingsConstruction delays due to tight budgets. Make sure to note that you are a CBB Member

The plans are uploaded please just give my clients access

Page 102: Project List (Updated 11 30 12 )BA

Updates 5-7-12

Mosaic Gardens - WhittierSend MemoProject Notes 5/7/12 - Per Bret the following trades are still open. Make sure to note that you

are a CBB Member. Site and Offsite ConcreteMasonry(Planters)Landscaping and IrrigationSite FurnishingsMirrorsMailboxesFinal Clean

Blythe Hampton Inn and SuitesSend MemoProject Notes: 5/7/12 - Per Pinank (owner) got approval from city. Moving forward with funding

CBB will be assisting owner with providing fundingI have uploaded the plans under your "transfer folder" move them and give the right clients

access

Park Lofts - National CitySend MemoProject Notes: 5/7/12 - Per Joe it will be at least another 30 days before blueprints will be ava.

Perris Station Sr Apartments - PerrisSend MemoProject Notes: 5/7/12 - Per the developer no GC has been awarded yet. CBB to follow

up in 2 weeks

Monarch Beach Plaza Remodel - Monarch BeachSend MemoProject Notes: 5/7/12 - Per the owners rep they have a meeting with the new CM this

Tuesday to review and confirm status of project

La Cienega Retail Renovation - Los AngelesSend MemoProject Notes: 5/7/12 - Per Leor the project is pending the owners final decision as

to the final layout of the project.

Loma Bonita Residences - San DimasSend MemoProject Notes: 5/7/12 - Per the developer the revisions are still pending with the fire dept.

Page 103: Project List (Updated 11 30 12 )BA

Updates 5-7-12

review.

Kirklands - GC NoticeSee uploaded document in your transfer folderfinish the links at the bottom and email this notice to:

Tyschuia Construction / Riviera Development / The Cutting Edgekeep a copy of this new template for yourself for future reference

Krisers Pet Supply - GC NoticeSee uploaded document in your transfer folderfinish the links at the bottom and email this notice to:

Tyschuia Construction / Riviera Development / The Cutting Edge

HD Supply - GC NoticeSee uploaded document in your transfer folderfinish the links at the bottom and email this notice to:

Tyschuia Construction / Riviera Development / The Cutting Edge

El Monte Entertainment Facility - El MonteSend MemoProject Notes: 5/7/12 - Per Sam they have not heard an update from the owner for the past

six months

Page 104: Project List (Updated 11 30 12 )BA

updates notes 5/1/12

Notes

Temple St Multi-FamilyYou sent it to the wrong client. You accidently sent it to Int & Ext Design and not Integrity

inspection solutions

Los Angeles Ave Medical Officethis project is PRE-Bidding not Invite to Bid

Taco Bell - San PedroSend MemoUnder Contacts Add:

Crabb Constuction Company

Project Notes: 5/1/12 - New GC Bidder confirmed

Page 105: Project List (Updated 11 30 12 )BA

Updates Notes 4-30-12

Notes:Before you send out an update check the Project cover sheet to see if any subs have been removed from

bidding since the last notice was sent out

Port of Los Angeles - San PedroSend MemoProject Notes: 4/30/12 - Full Bidders list has been uploaded to YouSendItUnder Project Documents Add another text box:

Full Bidders List Uploaded: 4-30-12

Sepulveda Ambulatory Care Ctr B200 - North HillsI already uploaded the plans please give my clients access

Taco Bell - San PedroSee the attached docs in the pdf fileI already uploaded the plans they are are the folder to be transferred please

give my clients access

Springhill Suites - Bossier CitySee the attached docs in the pdf fileI already uploaded the plans they are are the folder to be transferred please

give my clients access

Puma - Cabazon Outlets - CabazonI already uploaded the plans they are are the folder to be transferred please

give my clients access

Covington Hills - Ladera RanchSend MemoProject Notes 4/30/12 - Per Gary they will be submitting for permits at the end of this month.

Foothill Blvd Mixed Use - HaywardSend MemoProject Notes 4/30/12 - Per the Developer the project is 6 months away from finishing

entitlements. CBB to follow up at the end of Fall 2012.

Page 106: Project List (Updated 11 30 12 )BA

Updates Notes 4-30-12

Court St Condos - MartinezSend MemoProject Notes 4/30/12 - Per the Developer they will be performing all work in-house.

Project Closed

Osborne St Multi-Units - Los AngelesSend MemoProject Notes 4/30/12 - Per the Developer just went thru neighborhood review. Scheduled

to submit plans for review in May 2012. Will hire subs directly. CBB to follow up end of 2012.

Gerhart Childcare Center - Los AngelesSend MemoProject Notes 4/30/12 - Per the owners rep a GC will be awarded in a couple of weeks.

The Pearl - Soloano BeachSend MemoProject Notes 4/30/12 - Per the owners CM this project is still in design and may change locations

Fairvalley HS - CovinaSend MemoProject Notes: 4/30/12 - Full Bidders list has been uploaded to YouSendItUnder Project Documents Add another text box:

Full Bidders List Uploaded: 4-30-12

Rowland HS Partial Mod - Rowland HeightsSend MemoProject Notes: 4/30/12 - Full Bidders list has been uploaded to YouSendItUnder Project Documents Add another text box:

Full Bidders List Uploaded: 4-30-12

Page 107: Project List (Updated 11 30 12 )BA

Updates Notes 4-30-12

Project Notes 4/30/12 - Per the owners CM this project is still in design and may change locations

Page 108: Project List (Updated 11 30 12 )BA

Updates 4.25.12 Each update you finsih just highlight it in another color so I know its done

Saddle Ranch Chop House - Costa MesaSee document in pdf make nescessary changes to publisher docSend MemoProject Notes: 4/25/12 - Per David the orginal architect is been replaced. All finish plans are

currently being done. Final set should be ava. May 2012.

El Corazon - Costa MesaSee document in pdf make nescessary changes to publisher docSend MemoProject Notes: 4/25/12 - Per David the orginal architect is been replaced. All finish plans are

currently being done. Final set should be ava. May 2012.

Marshalls - OrangeGive clients access to blueprintsSend MemoUnder contacts Add:

B Davis P 408-436-4800Gluck Development P 818-880-8220

Project Notes: 4/25/12 - Per the owners rep this is the full bidders list

529 Spring St Mixed Use - Paso Robles Send MemoProject Notes: 4/25/12 - Per Nick this project will be ready for GC Bidding in about 2 months.Add under Contacts: Developer John Crauther P 805-459-6804

The Whittier Apartments - Los AngelesSend AddendumI forwarded a email with the link to the updated plans including addendum. Please download

and upload to YouSendit. Give clients access to blueprintsProject Notes: 4/25/12 - Per Todd all trades are still open. Revised plans and addendums A-D

have been issued and are uploaded to YouSendIt.Create a text box under Project Documents : Rev. Plans Uploaded 4/25/12Bid Date: Unconfirmed

Courtyard at Mandaly Bay - OxnardSend MemoProject Notes: 4/25/12 - Per Developer it is unconfirmed if they will build or sell. CBB to

follow up.

Season 52- San DiegoI already uploaded the plans please give my clients access

Page 109: Project List (Updated 11 30 12 )BA

Wood Ranch Village Center- Simi ValleyI already uploaded the plans please give my clients access

Bed Bath & Beyond- Palm StreetI already uploaded the plans please give my clients access

Innovative Restaurant-West HollywoodI already uploaded the plans please give my clients access

Taylor Yard Apartments- Los AngelesI already uploaded the plans please give my clients access

New Main Kitchen - PortervilleI already uploaded the plans please give my clients access

Home Goods - LakewoodSee document on pdf 4-25-12 part 2Send MemoUnder Contacts Add: Eleven Western Builders Inc P 760-796-6346 F 760-796-6360

Jefferson Park Terrace-Los AngelesI already uploaded the plans please give my clients access

Mosaic Gardens - WhittierI already uploaded the plans please give my clients access

Rowland HS Partial Mod - Rowland Heightsgo to bidmail.com and downloand addendums 1-3upload addendums 1-3 onto yousendit under the Blueprint Folder for clients to access(this was suppose to be done yesterday please upload today)

Broadway Trianlge Development - SacramentoPlease re-upload the blueprints that you deleted

Page 110: Project List (Updated 11 30 12 )BA

More Work Continued below……

HD Supply Repair & Remodel - Santa Anago to bidmail.com and downloand addendums 1upload addendum 1 onto yousendit under the Blueprint Folder for clients to accessSend MemoProject Notes: 4/25/12 - Addendum 1 is now uploaded to YouSendIt

Jefferson Blvd Apartments - Los AngelesSee document on pdf 4-25-12 part 2

Page 111: Project List (Updated 11 30 12 )BA

Updates 4.24.12

HD Supply Repair & Remodel - Santa AnaSee Document in Projects 4.24.12 part 2

Rowland HS Partial Mod - Rowland HeightsSee Document in Projects 4.24.12 part 2go to bidmail.com and downloand addendums 1-3upload addendums 1-3 onto yousendit under the Blueprint Folder for clients to access

Broadway Trianlge Development - SacramentoSee Document in Projects 4.24.12 part 2I forwarded you the email so you can downloand addendum 1upload addendum 1 onto yousendit under the Blueprint Folder for clients to access

Monarch Beach Plaza Remodel - Monarch BeachSend MemoProject Notes: 4/24/12 - Per the building owner the project is on temp. hold for a couple of weeks.

CBB to follow up

Fairvalley HS - CovinaSee Document in Projects 4.24.12 part 2

Valle Verde Retirement Community - Santa BarbaraSend MemoProject Notes: 4/24/12 - Per Sunseri there is exisiting structures that will be re-habed and

new construction of buildings as well. All trades are open.

Wienerschnitzel - JurupaSend MemoProject Notes: 4/24/12 - Per the owner it is still in permitting. CBB to follow up

Mosaic Gardens - WhittierSee Document in Projects 4.24.12 part 2I already marked the excel Project Cover Sheet with dates for this memo so you know how are

the few clients who should be recieveing this project memo.Make sure to give all the correct clients access to the blueprints. I already uploaded them

Olive Garden #4433 - Culver CitySee Document in Projects 4.24.12 part 2

Page 112: Project List (Updated 11 30 12 )BA

Project Notes: 4/24/12 - Per the building owner the project is on temp. hold for a couple of weeks.

Page 113: Project List (Updated 11 30 12 )BA

Project Updates 4.24.12

Casita Zen - AlhambraSee Document in Projects 4.24.12Make sure to give all the correct clients access to the blueprints. I already uploaded them

Four Detached Homes - Temple CitySee Document in Projects 4.24.12Make sure to give all the correct clients access to the blueprints. I already uploaded them

District Cold Storage Facility - PomonaSee Document in Projects 4.24.12

Renovate Bldg 1 First Floor - San DiegoI uploaded the "Bidders List" to the Blueprints FolderSend a "Memo" to clients and under project notes enter" 4/24/12 - Full bidders list provided

per the Fedbiz website. Bidders list has been uploaded to YouSendIt. "Under Project Documents add another text box and enter "Bidders list Upload 4/24/12"

Meadow Glen Apartments - ModestoI uploaded the "SignIn " sheet to the Blueprints FolderSend a "Memo" to clients and under project notes enter" 4/24/12 - Per the Housing Authority

this is not a complete bidders list as the jobwalk was not mandatory. Bid datechanged to 5/3/12. Job walk sign in sheet uploaded to YouSendIt"

New Bid Date: 5/3/12 @ 9amUnder Project Documents add another text box and enter "Bidders list Upload 4/24/12"

S New Hampshire Ave Multi-Units - Los AngelesSend a "Memo" to clients and under project notes enter

" 4/24/12 - Per the owners rep funding is currently being secured. Unconfirmed ifthey will be opening it for GC's to bid. CBB to follow up end of May 2012."

Mar Vista Housing Development - PasadenaSend a "Memo" to clients and under project notes enter

" 4/24/12 - Per the developer project is pending federal funding. They hire subs directly. CBB to follow up"

Page 114: Project List (Updated 11 30 12 )BA

Notes 4.24.12

Whenever you create updated publisher docs please save it with the date and your initialex: Casita Zen 4.24.12 F

Any email addresses on the publisher doc that are not on the Project Cover Sheet (excel) please removethem before you send out the updates

The layout you did for the memos is correct :)The updates you put on the excel Project Cover Sheet are correct :)

Four detached homesyou got the layout right and the due date :)But what did you mean about the email addresses?oh and you don’t have to add a text box under Project Documents for Memos issued

Please make sure to add me to every notice you send out under the BCC column so I know what was sent

Page 115: Project List (Updated 11 30 12 )BA

Notes

1 the memos that I had you create did you email it out to my clients? Is show norecord that you did in the sent items box?

2 Hours - For all publisher projects you create time will always be considered a 1/2 hr perproject. Anything you do outside of this I need you to clock in and clock out. With theunderstanding that I am expecting you to multi-task. While a set of blueprints isdownloading you can be transferring documents, updating the Project List sheet, etc.I have trained Ranjit on how to email the projects to my clients. So you will takecare of everything else after that point (i.e. uploading her publisher docs to Yousendit,Creating folders, update Project list sheet….etc). I need you to invoice me everyMonday not twice a month. And no matter what your cap-off is 40 hours in a week.Whenever you are reaching this amount I need you to inform me immediately.

3 Do you understand what I meant on Note 1 for yesterday?

4 Please do not email me a separate message indicating which blueprints you downloadedthat is what this project list is for. Enter it here.

5 In yesterdays note 4 I requested for daily timesheets from you. This is a requirementto get your invoice paid.

Page 116: Project List (Updated 11 30 12 )BA

Notes 4/17/2012

1 Under the column "Client Access" you only mark this box if the blueprints have been uploadedand you have given all the right clients access to the plans

2 Please mark the Project List with a F instead of an X so that way I know it is what you did and notme

3 All the projects that we send out if you see the blueprints listed on Bidmail.com please go inand download them, upload them to YouSendit and give the right clients access immediately

4 I have no daily timesheets from you to know how many hours you are doing

5 I have not received a Paypal request for payment for last week?

6 Every blueprint you download and upload to YouSendIt I need you to add it to the Project List so I know it is there. And mark the correct boxes.

7 When you have emailed the project to my clients from publisher please mark the columnlabled Project Emailed. That way I know at a quick glance what I need to do when I login in themorning

8 On the project papers I send you and Ranjit when I hand write additional trades to be listedI also need them to be inputed (i.e. like the 529 Spring St: I also hand wrote General Contractorsby the list of trades I needed this to be added to)

9 You uploaded the right documents to the Project Folders :)

10 You corrected the right things on Ranjit's file :)

11 When you create a folder for a project make sure to put the city as well (i.e. Court Condos - Martinez)

12 I trained Ranjit on how to email the projects to my clients so all I need you to do is upload the publisher docs that she created into the right Project Folder, take care of the blueprints, and give my clients access

13 Right now only you and me have access to this tracking sheet so what ever projectsRanjit and you send I need you to mark the Project List sheet accordingly

14 Monarch Beach Plaza - Under the GC contact why is there no firm name? It should also showMoorfield Construction Inc. I already fixed it just keep an eye out for things like this

15 HD Supply Santa Ana - If the blueprints have been uploaded to Yousendit why havent myclients received access? I already did it.

Page 117: Project List (Updated 11 30 12 )BA

Under the column "Client Access" you only mark this box if the blueprints have been uploaded

Please mark the Project List with a F instead of an X so that way I know it is what you did and not

labled Project Emailed. That way I know at a quick glance what I need to do when I login in the

I also need them to be inputed (i.e. like the 529 Spring St: I also hand wrote General Contractors