Project Level Traffic Estimate STIP Project BR-0013 NC 82 (Godwin-Falcon Road) Bridge No. 250019 Replacement over I-95 Cumberland County WBS # 67013.1.1 May 30, 2018 Prepared By: HNTB North Carolina, P.C. NCDOT Transportation Planning Division
Project Level Traffic Estimate
STIP Project BR-0013
NC 82 (Godwin-Falcon Road)
Bridge No. 250019 Replacement over I-95
Cumberland County
WBS # 67013.1.1
May 30, 2018
Prepared By: HNTB North Carolina, P.C.
NCDOT Transportation Planning Division
NOTTO
SCALE
N
COUNTY: Cumberland DIVISION: 6
TIP: BR-0013 WBS: 67013.1.1
DATE: May 2018
PREPARED BY: HNTB North Carolina, PC
L E G E N D### No. of Vehicles Per
Day (VPD) in 100s
1- Less than 50 VPD
X
( d, t )PM
DK
K
PM
D
( d, t )
Design Hour Factor (%)
PM Peak Period
Peak Hour Directional Split (%)
Indicates Direction of D
Duals, TT-STs (%)
Movement Prohibited
2018/2040BASE/FUTURE YEAR
NO-BUILD/BUILD
LOCATION: NC 82 & I-95 Interchange
AVERAGE ANNUAL DAILY TRAFFIC
= Study Area Intersection IDX
PROJECT: Bridge Replacement
2018 BASE YEAR NO-BUILD/BUILD
2040 FUTURE YEAR NO-BUILD/BUILD
8
3
95
95
Gordon Williams Road
(SR 1860)
1-
1-
4
1-1
7
NOTTO
SCALE
N
Godwin-Falcon Road
82
Godwin-Falcon Road
82
69
6
24
78
31
1
23
1-1
31/2
1117
70
9
PM
11 65
(5,2)
PM
55
8
(11,1
)
Gordon Williams Road
(SR 1860)
PM
70 15
(4,3)
PM
8 5
5
(4,1
1)
PM
8 5
5
(4,1
1)
PM
11 65
(5,2)
95
95
Godwin-Falcon Road
82
Godwin-Falcon Road
82
1-3 13PM
11 65
(5,2)
13 PM
70 15
(4,3)
49
65
05
PM
8 5
5
(4,1
1)
PM
8 5
5
(4,1
1)
1PM
55 8
(11,1)
NCDOT STIP PROJECT BR-0013 NC 82 (Godwin-Falcon Road) Bridge Replacement
Traffic Estimate Technical Memorandum
May 2018 1
1. PROJECT BACKGROUND
1.1. Forecast Request Information
The traffic forecast for this project was requested by Tierre Peterson of the North Carolina Department of Transportation (NCDOT) Structures Management Unit in May 2018 as part of the Traffic Forecasting Limited Services Agreement (7000016863) to be performed by HNTB North Carolina, P.C. NCDOT State Transportation Improvement Program (STIP) Project BR-0013 is located at the NC 82 (Godwin-Falcon Road) and I-95 interchange (Exit 65). This interchange will also be included in the larger traffic forecast for I-5986 that is currently being developed by HNTB and is expected to be delivered by October 19, 2018.
1.2. Project Description
NCDOT STIP Project BR-0013 includes the bridge replacement of bridge number 250019 on NC 82 (Godwin-Falcon Road) over I-95 in Cumberland County. The traffic forecast study area for BR-0013 includes a total of 3 intersections, including the I-95 and NC 82 (Godwin-Falcon Road) interchange and the Gordon Williams Road (SR 1860) intersection with the I-95 northbound off-ramp. Figure 1 shows the project study area for this forecast. STIP Project BR-0013 is not currently programmed in the current 2018 – 2027 STIP, approved by the NCDOT Board of Transportation on August 3, 2017 and most recently revised May 1, 2018. This traffic forecast includes two scenarios: Base Year No-Build (BYNB) and Future Year Build (FYB). Since this is a bridge replacement project, no specific design improvements would divert traffic volumes in the study area. Therefore, the traffic volumes are not expected to change between No-Build and Build scenarios. The BYNB and FYB forecasts can be used for both No-Build and Build scenarios.
2. SOURCES OF INFORMATION AND DATA
2.1. Travel Demand Model
The 2040 Fayetteville Area Metropolitan Planning Organization (FAMPO) Travel Demand Model (TransCAD 5, Build 2110, March 21, 2018 version) was used in the development of this traffic forecast. The model has a Base Year of 2010 and a Future Year of 2040.
2.2. Historic AADT Data
HNTB reviewed all available NCDOT Traffic Survey Unit AADT data from 1996 to 2016 (most recent published information). Linear growth trend line estimates were developed for relevant roadway segments in the study area using the NCDOT AADT historical data. Table 1 details available 1996 to 2016 historic AADT data for relevant roadway segments within the study area. Table 2 displays available AADT from 2013 to 2016, 10-year and 20-year linear annual growth rates based on historic AADT linear regression lines, and 2018 AADT that is estimated based on the 10-year and 20-year historic linear annual growth rates. Appendix A shows detailed linear regression graphs
NCDOT STIP PROJECT BR-0013 NC 82 (Godwin-Falcon Road) Bridge Replacement
Traffic Estimate Technical Memorandum
May 2018 2
used to determine 2018 and 2040 AADT estimates based on 1996 to 2016 and 2006 to 2016 historical AADT data.
2.3. Field Traffic Data Collection
The traffic count data for this forecast was collected by HNTB’s subconsultant, Quality Counts LLC, in April and May 2018 when Cumberland County schools were in session. 13-hour turning movement counts (TMCs) were collected. Table 3 provides a summary of the field traffic data collection completed for this forecast. Detailed reports of the traffic counts can be found in Appendix B.
3. 2018 BASE YEAR NO-BUILD TRAFFIC ESTIMATE
The 2018 BYNB scenario includes an estimate of existing study area conditions. Field collected 2018 count data was primarily used to determine the 2018 BYNB estimate, followed by comparing count data with recent historical AADT, historical trend line estimates, extrapolating historical AADT volumes to 2018 using 10-year historic growth rates (2006 – 2016) and 20-year historic growth rates (1996 – 2016), and applying engineering judgment. Table 4 provides BYNB design factors and Table 5 provides the estimated AADT from the existing count data, projected 2018 AADT based on historical AADT, and the 2018 selected BYNB Estimate volumes. NCDOT adjustable intersection analysis buddy (IAB) results for traffic forecast study area intersections are included in Appendix C.
4. 2040 FUTURE YEAR BUILD TRAFFIC FORECAST
The 2040 FYB forecast assumes that there are no STIP projects programmed for funding in the general vicinity of the BR-0013 interchange that will impact traffic volumes. I-95 is assumed to be widened to an 8-lane facility because of STIP Project I-5986 being in place. The 2040 FYB forecast uses extrapolations of historic AADT data in the study area, 2040 model data, and comparisons/adjustments from the 2018 BYNB volumes as they applied to the historic and model information. Table 6 provides traffic forecast study area road network segments that are included in the travel demand model and comparable recent AADT information that provide validation for the use of the travel demand model in project traffic forecasting methodologies used in this memo. The FAMPO model uses a 2010 base year for model calibration. The 2040 FYB traffic forecast volumes were primarily developed by applying a selected growth rate to the 2018 BYNB volumes. An applied growth rate was determined for each roadway segment based on the 2010 to 2040 model growth rates, 10- and 20-year historic AADT growth rates, and engineering judgment. Table 7 shows the historic growth rates, model growth rates, and the applied growth rates used to develop the 2040 FYB traffic volumes. NCDOT adjustable IAB results for traffic forecast study area intersections are included in Appendix C.
!(!(
!(!(
§̈¦95
Godwin-Falcon Road
"Ö82
N West Street
Gordon Williams Road
(SR 1860)
§̈¦95
Sherr
ill Bag
gett R
oad
(SR 18
06)
"Ö82
Exit 651
23
0 0.5 10.25Miles
Legend Traffic Forecast Study Area
Figure 1
COUNTIES: Cumberland
DATE: May 2018
PROJECT:
PREPARED BY:HNTB North Carolina, P.C.
343 E. Six Forks Rd, Suite 200Raleigh, NC 27609
Figure
1
§̈¦95
§̈¦95
£¤13
£¤13
§̈¦40
§̈¦40DunnErwin
Coats Benson
Four Oaks
Eastover
WadeSampsonCounty
HarnettCounty
CumberlandCounty
JohnstonCounty
Cape Fear
River£¤301
£¤301
£¤421
£¤421
MunicipalityBoundary
0 5 102.5Miles
NC 82 (Godwin-Falcon Road)Bridge Replacement over I-95
µµ
Water BodyNC RoutesLocal Road
Traffic ForecastStudy Area
InterstateUS Routes
!( Interchange#
!( Intersection#
CountyBoundary STIP: BR-0013 WBS: 67013.1.1
Intersection ID numbers correspond to IntersectionID numbers summarized in the traffic forecast scope.
NCDOT STIP PROJECT BR-0013 NC 82 (Godwin-Falcon Road) Bridge Replacement
Traffic Estimate Technical Memorandum
May 2018 4
Table 1 – Historic AADT Traffic Volumes
Roadway 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996
I-95 – South of NC 82 (Godwin-Falcon Road) 56,000 47,000 46,000 44,000 47,000 47,000 47,000 47,000 43,000 46,000 46,000 44,000 44,000 44,000 42,000 42,000 41,000 43,000 42,000 - 38,000
I-95 – North of NC 82 (Godwin-Falcon Road) 55,000 47,000 46,000 43,000 46,000 46,000 46,000 47,000 43,000 46,000 46,000 44,000 44,000 44,000 42,000 42,000 41,000 43,000 42,000 - 38,000
NC 82 (Godwin-Falcon Road) – West of I-95 Southbound Ramps 1,100 - 960 - 1,200 - 1,100 - 890 - 1,200 - 1,500 - 1,100 - 1,200 1,000 1,300 1,400 1,500
NC 82 (Godwin-Falcon Road) – East of I-95 Northbound Ramps 1,300 - 1,300 - 1,500 - 1,500 - 1,300 - 1,400 - 1,400 - 1,300 - 1,400 1,400 1,400 1,500 1,600
Source: NCDOT Traffic Survey Unit.
NCDOT STIP PROJECT BR-0013 NC 82 (Godwin-Falcon Road) Bridge Replacement
Traffic Estimate Technical Memorandum
May 2018 5
Table 2 – Historic AADT Traffic Volumes and Growth Rates
Roadway
NCDOT Historic Traffic Count Data
Annual Growth Rate
2018 10-Year AADT
Estimate 3
2018 20-Year AADT
Estimate 3 2013 2014 2015 2016 10-Year 1 20-Year 2
I-95 – South of NC 82 (Godwin-Falcon Road) 44,000 46,000 47,000 56,000 1.11% 1.09% 50,500 50,300
I-95 – North of NC 82 (Godwin-Falcon Road) 43,000 46,000 47,000 55,000 0.98% 0.99% 49,600 49,600
NC 82 (Godwin-Falcon Road) – West of I-95 Southbound Ramps - 960 - 1,100 - 0.25% - 1.32% 1,100 1,000
NC 82 (Godwin-Falcon Road) – East of I-95 Northbound Ramps - 1,300 - 1,300 - 0.52% - 0.44% 1,300 1,300
Historic AADT Source: NCDOT Traffic Survey Unit 1 10-year annual growth rate derived from a linear regression projection of all available historic AADT from 2006 – 2016 2 20-year annual growth rate derived from a linear regression projection of all available historic AADT from 1996 – 2016 3 AADT estimates are projected using historic AADT linear regression lines. Values are rounded to the nearest 100.
NCDOT STIP PROJECT BR-0013 NC 82 (Godwin-Falcon Road) Bridge Replacement
Traffic Estimate Technical Memorandum
May 2018 6
Table 3 – Field Traffic Data Collection
Location Count
Type Date(s)
Daily
Factor 1
ATR
Group
Seasonal
Factor
NC 82 (Godwin-Falcon Road) at I-95 Southbound Ramps 13-Hr TMC April 26, 2018 (Thursday) ** 1 0.95
NC 82 (Godwin-Falcon Road) at I-95 Northbound Ramps 13-Hr TMC April 26, 2018 (Thursday) ** 1 0.95
I-95 Northbound Off-Ramp at Gordon Williams Road (SR 1860) 13-Hr TMC May 1, 2018 (Tuesday) ** 1 0.97
TMC = Turning Movement Count 1 13-hour to 24-hour partial weekday adjustment factor (default values provided by Traffic Survey Group November 24, 2015)
** Combination of various 13-hour to 24-hour weekday adjustment factors were used:
0.8290 used for majority of movements (Traffic Survey Group default value for NC Routes)
0.8144 used for turns onto Gordon Williams Road (SR 1860) (Traffic Survey Group default value for SR/Local Routes)
0.7886 used for through movements coming from I-95 off-ramps (Traffic Survey Group default value for interstates)
NCDOT STIP PROJECT BR-0013 NC 82 (Godwin-Falcon Road) Bridge Replacement
Traffic Estimate Technical Memorandum
May 2018 7
Table 4 – 2018 Base Year No-Build Design Factors
Roadway
D - Directional Distribution % K - Peak Hour Factor % Heavy Truck % (Dual, TTST)
Existing Count Selected
2018 Value
Existing Count Selected
2018 Value
2016 AADT Shape File 1
Existing Count Selected
2018 Value
TMC VSC TMC VSC TMC VSC
I-95 – South of NC 82 (Godwin-Falcon Road) 2 - - 55 SB - - 8 4,10 - - 4,11
I-95 – North of NC 82 (Godwin-Falcon Road) 2 - - 55 SB - - 8 4,12 - - 4,11
NC 82 (Godwin-Falcon Road) – West of I-95 74 WB - 70 WB 15 - 15 5,2 4,3 - 4,3
NC 82 (Godwin-Falcon Road) – I-95 to Gordon Williams Road (SR 1860) 3 65 EB - 65 EB 11 - 11 - 5,2 - 5,2
NC 82 (Godwin-Falcon Road) – East of Gordon Williams Road (SR 1860) 65 EB - 65 EB 11 - 11 4,2 5,2 - 5,2
Gordon Williams Road (SR 1860) – Southeast of I-95/NC 82 (Godwin-Falcon Road) Interchange 4 100 WB - 55 WB 4 - 8 - 11,0 - 11,1 1 2016 Traffic Data Segment Shapefile provided by the NCDOT Traffic Survey Group 2 VSC counts are currently being counted and processed on I-95 as part of STIP Project I-5986. BR-0013 2018 BYNB selected design factors and truck percentages on I-95 were determined by using engineering
judgement and knowledge of the general area. Design factors will be updated as needed once I-5986 traffic count data has been collected and processed. 3 NC 82 (Godwin-Falcon Road), from I-95 to Gordon Williams Road (SR 1860), is a roadway segment that includes the Gordon Williams Road (SR 1860) turning movements that connect directly to the I-95 northbound
off-ramp. 4 Gordon Williams Road (SR 1860) – the PM peak and AM peak hours included only 1 vehicle and 2 vehicles, respectively. Therefore, engineering judgement was used to determine the design factors.
NCDOT STIP PROJECT BR-0013 NC 82 (Godwin-Falcon Road) Bridge Replacement
Traffic Estimate Technical Memorandum
May 2018 8
Table 5 – 2018 Base Year No-Build Selected AADT
Roadway NCDOT Historic AADT
2018 10-Year (2006 – 2016)
AADT Estimate 1
2018 20-Year (1996 – 2016)
AADT Estimate 1
2018 Project Specific Count Data AADT Estimate 2018 BYNB
Selected AADT 2013 2014 2015 2016 TMC VSC
I-95 – South of NC 82 (Godwin-Falcon Road) 2 44,000 46,000 47,000 56,000 50,500 50,300 - - 50,500
I-95 – North of NC 82 (Godwin-Falcon Road) 2 43,000 46,000 47,000 55,000 49,600 49,600 - - 49,600
NC 82 (Godwin-Falcon Road) – West of I-95 - 960 - 1,100 1,100 1,000 1,300 - 1,300
NC 82 (Godwin-Falcon Road) – I-95 to Gordon Williams Road (SR 1860) 3 - - - - - - 1,300 1,400
NC 82 (Godwin-Falcon Road) – East of Gordon Williams Road (SR 1860) - 1,300 - 1,300 1,300 1,300 1,300 - 1,300
Gordon Williams Road (SR 1860) – Southeast of I-95/NC 82 (Godwin-Falcon Road) Interchange - - - - - - <50 - 100
1 AADT estimates are projected using historic AADT linear regression lines (volumes rounded to the nearest 100). 2 VSC counts are currently being counted and processed on I-95 as part of STIP Project I-5986. BR-0013 2018 BYNB Selected AADT on I-95 was determined by considering 10-year historic AADT linear regression line estimates. 3 NC 82 (Godwin-Falcon Road), from I-95 to Gordon Williams Road (SR 1860), is a calculated traffic volume that includes the Gordon Williams Road (SR 1860) turning movements that connect directly to the I-95 northbound off-ramp.
NCDOT STIP PROJECT BR-0013 NC 82 (Godwin-Falcon Road) Bridge Replacement
Traffic Estimate Technical Memorandum
May 2018 9
Table 6 – Model Validation
Roadway
Model Calibration
Forecast Traffic
Volume FYB Traffic Volumes
Model (2010) AADT (2010) 2018 BYNB Extrapolated
(2040) 1 Model (2040)
Forecast (2040)
I-95 – South of NC 82 (Godwin Falcon Road) 49,701 47,000 50,500 61,900 80,869 70,900
I-95 – North of NC 82 (Godwin Falcon Road) 46,970 46,000 49,600 59,600 72,527 69,600
NC 82 (Godwin Falcon Road) – West of I-95 1,448 1,100 1,300 1,000 4,826 3,100
NC 82 (Godwin Falcon Road) – East of I-95 1,844 1,500 1,300 1,200 4,129 2,300
Gordon Williams Road (SR 1860) – East of I-95 Northbound Off-Ramp - - 100 - - 100
1 10-year annual growth rates derived from linear regression projections of all available historic AADT from 2006 – 2016 were used to extrapolate 2040 AADT volumes. 2040
Extrapolated AADT volumes are rounded to the nearest 100.
NCDOT STIP PROJECT BR-0013 NC 82 (Godwin-Falcon Road) Bridge Replacement
Traffic Estimate Technical Memorandum
May 2018 10
Table 7 – 2040 Future Year Build Selected AADT
Roadway
Reference Growth Rate Model Daily Traffic Volumes & Growth Rate Applied Growth Rate 3
2018 BYNB Selected
AADT
2040 FYB Selected AADT 10-Year
Historic 1 20-Year
Historic 1 2010 BYNB 2040 FYB Model AGR 2
I-95 – South of NC 82 (Godwin-Falcon Road) 4 1.11% 1.09% 49,701 80,869 1.64% 1.6% 50,500 70,900
I-95 – North of NC 82 (Godwin-Falcon Road) 4 0.98% 0.99% 46,970 72,527 1.46% 1.6% 49,600 69,600
NC 82 (Godwin-Falcon Road) – West of I-95 - 0.25% - 1.32% 1,448 4,826 4.09% 4.0% 1,300 3,100
NC 82 (Godwin-Falcon Road) – I-95 to Gordon Williams Road (SR 1860) 5 - - 1,844 4,129 2.72% 2.5% 1,400 2,400
NC 82 (Godwin-Falcon Road) – East of Gordon Williams Road (SR 1860) - 0.52% - 0.44% 1,844 4,129 2.72% 2.6% 1,300 2,300
Gordon Williams Road (SR 1860) – South of NC 82 (Godwin-Falcon Road) 6 - - - - - - 100 100
1 10- and 20-year annual growth rates derived from linear regression projections of all available historic AADT from 2006 to 2016 and 1996 to 2016, respectively. See Table 2. 2 CAGR (exponential) between FAMPO model 2010 BYNB and 2040 FYB model traffic volumes
3 Applied CAGR (exponential) value for 2040 FYB Traffic Forecast 4 I-95 – the average model growth rate of approximately 1.6% was used to calculate FYB Selected AADT. 5 NC 82 (Godwin-Falcon Road), from I-95 to Gordon Williams Road (SR 1860), is a calculated traffic volume that includes the Gordon Williams Road (SR 1860) turning movements that connect directly to the I-95 northbound
off-ramp. 6 The 2040 FYB forecast scenario assumes that Gordon Williams Road (SR 1860) will be re-routed from its existing connection to the I-95 northbound off-ramp to connect directly to NC 82 (Godwin-Falcon Road). This
change is displayed in the forecast diagrams.