Page 1: Project first prototype NJT2C 1

Project first prototype

Group NJT2C

Page 2: Project first prototype NJT2C 1

Manufacturing Process

Many Parts1.injection molding 2.joining 3.assembly

4.decoration

For this model1.cutting 2.pushing 3.joining 4.assembly

5.decoration

Page 3: Project first prototype NJT2C 1

CAD Modifications

Outer tube

Inner tube

Before After

Page 4: Project first prototype NJT2C 1

CAD modfication

Page 5: Project first prototype NJT2C 1

Part Information

Page 6: Project first prototype NJT2C 1

Problems and Solutions

1. P: That it does not fit the part. It was designed not to look at the materials available in the market.

S: we modified the CAD.2. P: The materials in the markets is not available for assembly. s: we modified them.3. P:The operation is complicated and complex. Because the parts is high resolution due to smaller parts. S:We use precise machine.

Process Duration

Injection molding Ca. 10-15 s

Assembly ca. 1 hr

Page 7: Project first prototype NJT2C 1