Top Banner
Name: Location: Owner: Project Services www.kinetics.net – KINETICS 2016 – All rights reserved PROJECT EXPERIENCE: DATA CENTERS Charles Schwab Expansion Phoenix, AZ Charles Schwab Installation of underground/building plumbing, chilled water piping system and HVAC duct fabrication/equipment installation for the two story expansion of the existing building. The scope also included installation of 38 Liebert (CRAC), steam humidifiers, fuel polishing system and existing cooling tower modifications.
1

PROJECT EXPERIENCE: DATA CENTERS - Kinetics · PROJECT EXPERIENCE: DATA CENTERS Charles Schwab Expansion Phoenix, AZ Charles Schwab ... KNTC_Case Studies_CharlesSchwab

Jun 24, 2018

Download

Documents

phamkhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PROJECT EXPERIENCE: DATA CENTERS - Kinetics · PROJECT EXPERIENCE: DATA CENTERS Charles Schwab Expansion Phoenix, AZ Charles Schwab ... KNTC_Case Studies_CharlesSchwab

Name:

Location:

Owner:

Project Services

ww

w.kinetics.net–

KINETIC

S 2016 –All rights reserved

PROJECT EXPERIENCE: DATA CENTERS

Charles Schwab Expansion

Phoenix, AZ

Charles Schwab

Installation of underground/building plumbing, chilled water piping system and HVAC duct fabrication/equipment installation for the two story expansion of the existing building. The scope also included installation of 38 Liebert (CRAC), steam humidifiers, fuel polishing system and existing cooling tower modifications.